RAJAMANDALA HYDROELECTRIC POWER PLANT 1X47MW
GROUNDING SYSTEM INSPECTION REPORT
Description : Grounding Installation of Switchyard Date :
Location : Switchyard Area (Line Coupler) Drawing Ref. : HS-E-EE-SY-D2-13280
Check Item and Result
A. Installation of test well
B. Correct size and location
C. Bonding / grounding connection
D Grounding resistance
E Visual check
No. A B C D (W) E Result Remarks