CHEMICAL FILTER UNIT
PART 1 - GENERAL
1.01   DESCRIPTION
  A.   This   specification  covers   the   procurement,  manufacture,
       installation and commissioning of package fresh air filter unit
       in accordance with the provisions of the system of which these
       materials form part.
1.02   CODES AND STANDARDS
                                                      D
       Codes and Standards issued by the listed professional societies
       and organizations shall form the reference basis for requirements
                                              BI
       of this project.
  A.   ASME       American Society of Mechanical Engineers Publication
  B.   ASTM
                                        R
                  American Society for Testing and Materials
                  Specification
                                   FO
  C.   ASHRAE     American Society of Heating, Refrigerating and
                  Air-Conditioning Engineers Publications
  D.   ARI        Air-Conditioning and Refrigeration Institute
                        ED
              Standards
  E.   ADC        Air Diffusion Council Test Code
  F.   AMCAAir Moving and Conditioning Association Inc.
                SU
  G.   NFPANational Fire Protection Association Standards
  H.   SMACNA Sheet Metal and Air-Conditioning Contractors         National
        IS
       Association Inc. Publications
 I.    ARAMCO SAES-K-002
1.03   SUBMITTALS
  A.   Copies of the following are required to be submitted for review:
       1.     Detail Drawings and/or Shop Drawings.
       2.     Quality Assurance.
       3.     Certificates of Compliance.
       4.     Test Reports.
       5.   Manufacturers Instructions.
       6.   Operating and Maintenance Manuals.
PART 2 - PRODUCTS
2.01   GENERAL
  A.   The drawings indicate the extent and general arrangement of the
       air conditioning systems requiring package filter unit.
2.02   DESIGN
  A.   The package fresh air filter unit shall be manufactured to meet
       the capacities and dimensions specified on the drawings and/or in
                                                 D
       the equipment schedules and shall fit into the spaces allotted
       and shall allow adequate and acceptable clearances for entry,
                                            BI
       servicing and maintenance.
  B.   The manufacturer shall have a minimum of 5 years of history in
       design, fabrication, and testing of similar air purification
                                      R
       systems. The system shall provide a minimum airflow capacity as
       outlined in the specification parameters.
                               FO
  C.   The air purification system shall have filters, chemical media
       cells, and final filters to suit the specific requirements.
  D.   The manufacturer shall guarantee a minimum life expectancy for
       the system according to the inlet and outlet contaminant levels
                      ED
       for this application. Discharge contaminants levels shall not
       exceed defined parameters at any time before media expiry.
  E.   The manufacturer shall have the capability of providing in house
                SU
       laboratory analysis for testing media and air samples to assist
       in determining media bed consumption rates.
  F.   Where corrosion control is involved the equipment manufacturer
       shall have corrosion monitoring assistance for the controlled
        IS
       space. In house production and analysis of corrosion coupons
       shall be provided by the equipment manufacturer.
  G.   The chemical media shall have the capability of being loaded and
       unloaded, this shall be accomplished through the removal cells.
2.03   CONSTRUCTION AND FABRICATION
  A.   The base frame shall be structural steel epoxy coated channel.
  B.   The unit casing shall be welded with similar metals. Any
       dissimilar metals shall be fastened together by mechanical
       fasteners.
  C.   To produce high quality low distortion           welds,    the    GTAW
       (TIG)welding process shall be used.
  D.   All access doors and hatches shall use closed cell neoprene
       gasketing to prevent any air leakage.
  E.   All gasket material shall be ¼” thick by 0.75” wide closed cell
       neoprene foam.
  F.   Service doors and all unit access shall be oriented to suit field
       conditions or requirements.
  G.   Hinges shall be continuous piano type pin, and constructed of 300
       series stainless steel. Doors shall be held closed with quick
       release, snap acting type, positive pressure latches.
                                                 D
  H.   Any preheating, cooling, or humidification to temper the incoming
                                            BI
       air stream shall be provided by equipment manufacturer.
2.04   PRE-FILTER SECTION
 A.
                                     R
       The pre filter section shall prevent particulates
       downstream sections of the air purification system.
                                                                  into    the
                              FO
 B.    The filter section shall include a 40% roughing prefilter, based
       on ASHRAE Standard 42.1, and shall carry Class 2 certification
       in accordance with UL Standard 900.
 C.    Filter face velocities and filter resistances shall not exceed
                        ED
       the allowances for the project.
 D.    Any mist elimination and    grease   prefilter   systems   shall   be
       provided when required.
             SU
 E.    Extruded aluminum particulate filter tracks with positive air
       seals shall be used to allow easy changing of the filters, and
       to ensure air does not bypass the filters.
 F.    Access doors to the filters shall be with quick release, snap
        IS
       acting type, positive pressure latches.
 G.    The prefilter section    shall be monitored by a magnehelic
       differential  pressure    gauge  or  a   photohelic pressure
       switch/gauge.
2.05   CHEMICAL MEDIA
 A.    The chemical media(s) shall be as selected for this application
       with minimum performance and physical characteristics as defined
       for the application. Media data sheets, current MSDS information
       and original samples are to be provided by the manufacturer.
 B.    The media cells, cell stages, and residence times shall meet or
       exceed the minimum requirements.
 C.    Media bed face velocities shall not exceed the specified rate for
       this application.
 D.    Media pressure losses shall not exceed the design limitations.
2.06   FINAL FILTER
 A.    The particulate final filter section shall include a 95% high
       efficiency after filter based on ASHRAE Standard 52.1, and shall
       carry Class 2 certification in accordance with UL Standard 900.
 B.    Filter face velocities and filter resistances shall not exceed
       the allowances for the project.
                                                D
 C.    Extruded aluminum particulate filter tracks with positive air
                                           BI
       seals shall be used to allow easy changing of the filters, and
       to ensure air does not bypass the filters.
 D.    Access doors to the filters shall use quick release, snap acting
                                      R
       type, positive pressure latches.
                              FO
 E.    The final filter section shall monitor the pressure drop by a
       magnehelic differential pressure gauge or a photohelic pressure
       switch/gauge.
2.07   BLOWER SECTION
                        ED
 A.    Standard plenum fan blower arrangement shall be used for a draw
       thru or blow thru application. The blower shall be an industrial
       centrifugal type of suitable corrosion resistance construction.
       Bearings shall be used on L10 minimum life of 40,000 hours of
             SU
       average life of 20,000 hours. Adjustable motor base shall have a
       two point leveling and tension adjustment.
 B.    The blower assembly shall be installed utilizing isolation mounts
       for vibration purposes.
        IS
 C.    Sheaves shall be sized for a minimum of 150% of motor horsepower,
       fully machined, cast iron, keyed and securely attached to the
       shaft. The blower shall be driven using a heavy industrial
       adjustable V belt assembly which is oil and heat resistant and
       non-static conducting per RNA standards.
 D.    The blower section shall have accessibility for maintenance
       purposes, including balancing, grease nipples, tachometer (RPM)
       opening.
 E.    Optional spark proof blower construction shall be provided for
       such rated environments.
 F.    The motor shall be totally enclosed fan cooled (T.E.F.C.) type
       rated for the intended duty cycle.
 G.    Optional disconnect, starter, and controls shall be provided as
       required to suit the application.
2.08   PACKAGING AND HANDLING
 A.    The package fresh air filter unit shall be capable of preventing
       any   deflection   during  rigging,   handling,  transportation,
       operation, or servicing.
 B.    Lifting lugs and/or anchor bolt locations shall be provided for
       safe handling and operation of the system.
                                                D
PART 3 – EXECUTION
                                          BI
3.01   INSTALLATION
  A.   The package fresh air filter unit shall be installed in the
                                     R
       locations as shown on the contract drawings, in accordance with
       the manufacturer’s recommendations.
                                FO
3.02   TESTING AND COMMISSIONING
  A.   The package fresh air filter unit shall be tested with the
       completed air conditioning system in accordance with the
                      ED
       recommendations of the agencies listed in Part 1 Para 1.02.
  B.   Tests to demonstrate the performances shall be made by competent
       and experienced engineers in the presence of the Ministry
             SU
       Representative   unless  otherwise   directed.  Any  adjustments
       necessary to conform to the specification and/or the duties
       required shall be made at no cost to the Ministry.
        IS
                        - END OF SECTION -