DAT’Air Installation Data
1.0    General                              Ensure you advise our factory within
                                            7 days of any problems in transport.
i When installing, or if work has to
  be done on a HIROTEC
  DAT’AIR unit, you should follow           2.2    Lifting and Transporting
  the instructions given in this
  manual and those you find in the          During unloading and positioning of
  unit itself; in all cases take all the    the unit, sudden or violent
  necessary         precautions       for   movements should be avoided. A lift
  personnel safety.                         truck can use the base pallet to lift
                                            the unit. Handling inside the
i Pressures in the refrigeration            premises must be done with care,
  circuit, electrical components,           and no part of the machine should
  sharp parts and the centrifugal           be used as a lever for moving into
  fan could be harmful during               position.
  installation and maintenance
  work.                                     All units should be placed on the
                                            floor or on a suitable platform, and if
Consequently, any work on the               required, install suitable isolation
unit should be carried out by               mounts to reduce any vibration.
skilled and qualified people.
i The guarantee shall be deemed             2.3    Base
  immediately ineffective in the
  case of non compliance with the           The equipment needs no special
  instructions provided in this             base since it is not particularly
  manual and if any alteration is           heavy and vibration transmission is
  made to the unit for which                minimal. If the unit is to be installed
  authorisation has not been given.         on a raised floor it can be placed
                                            directly on the raised floor with, a
Attention: before carrying out              seal under the unit. The holes in the
any work on the unit, turn power            floor, through which cables and
                                            pipes pass, are indicated in the
off.
                                            dimensional drawings.
Inspection, Transportation,                 We recommend placing a stiff
Positioning                                 rubber strip between the floor and
                                            the unit base.
2.1    Inspection
                                            Always      check    the    maximum
Upon receipt of your unit, please           permitted load of the floor on which
check everything is in good order           the unit is to be positioned. The unit
and condition as the equipment left         base must be level to ensure proper
the factory in perfect condition and        drainage.
the carrier should be notified
immediately if any damage is found.         Support stands should be adjustable
Our firm must be informed in writing        in order to compensate for concrete
within 7 days, with details of the          floor irregularities and to ensure that
extent of the damage.                       the base of the equipment is
                                            horizontal.
                                                                          Page 1
                                                 DAT’Air Installation Data
2.4    Air Distribution
                                           2.5    Room Characteristics
Air treated by HIROTEC DAT’AIR
conditioners is used to condition the      The ceiling, walls and floor of the
environment, in which the unit is          room should have a vapor barrier to
operating after having passed              prevent the ingress or egress of
through the floor plenum (Under            moisture between the room and
unit) or a distribution duct (Over unit)   outside.
which forms the supply plenum.
                                           Installations and
Ducting must be designed in the
                                           Connections
proper way to allow adequate airflow
to the unit and provide optimal
working operation. For this reason,
                                           3.1    Installation Clearance
duct pressure drop should not
exceed the available static pressure
given by the fans (in the case of          Clearances indicated in the unit’s
particular    applications    please       dimensional drawings must be
consult our Technical Department).         complied with.
When installing ductwork please            In the case of multiple installations,
observe        the      following          it is possible that some spaces are
recommendations:                           common to several units: in this
                                           case     contact     our  HIROTEC
                                           Technical Department for advice.
i Duct work branch should be
  avoided at a distance less than 1
                                           The following connections are
  metre from the discharge; if this
                                           required to install a DAT’AIR unit:
  solution is not viable it is
  recommended to install sound
  absorbing material and grilles in        i Refrigeration connections (*EDA
  the duct)                                  versions)
i Duct must be connected to the            i Condenser pipes (*EDW version)
  unit with a flexible joint in order
  to avoid vibration transmission          i Water pipes to water coils (*FC
  from the unit to the ductwork.             versions)
i All the connections in the               i Connection to the condensation
  ductwork must be sealed in order           drainage
  to avoid air leaks from the duct.
                                           i Connection to the humidifier
The number of outlets is extremely
important in that if there are             i Wiring
insufficient outlets it could cause:
                                           *Denotes available in both under and over
                                           air discharge configuration.
i A decrease in the airflow rate,
  resulting    in   poor      unit
  performance and efficiency, and
  consequently an increase in
  running costs.
                                                                           Page 2
                                                DAT’Air Installation Data
                                         Pipe diametres can be seen in Table
3.2    Connection to Remote              3.1 depending on the unit size and
       Aircooled Condensers              length of run. Further information on
                                         pipe sizes can be obtained by
The route between the HIROTEC            contacting       our        Technical
DAT’AIR unit and the air cooled          Department.
condenser should not exceed 25-30
metres (equivalent length), if           Note: air cooled units are
necessary call our Technical             shipped with a 3 bar precharge
Department or use water cooled           of nitrogen
models where long pipe runs are
required.                                Table 3.1 Refrigeration            Lines
                                         (*EDA version) (‘)
All refrigeration piping should be
installed by a qualified Refrigeration    Model             Hot Gas         Liquid
Technician in accordance with good        50                16               12
refrigeration practice and Local
Regulations.                              80                16               12
                                          100               16               12
The route should be the shortest          110               16               12
possible to reduce the quantity of
freon in circulation and system           140               18               12
pressure drops. If copper pipes have      150               18               12
to cross over electrical cables it is
                                          170               18               12
advisable to insulate between the
two.                                      180               18               12
                                          230               18               12
Pipe insulation, unless otherwise
required by the Customer, can be          235               18               12
limited to the following locations;       260               22               16
                                          350               22               16
a) Hot gas and liquid lines that run
   in the raised floor cavity of the      440               28               16
   facility.                              520               28               16
                                          550               28               16
b) Hot gas lines that are exposed to
   low     ambient      temperatures      280               18               12
   (available on request).                360               18               12
                                          460               18               12
The maximum difference in height of
10 metres from the HIROTEC                13V               18               12
DAT’AIR    to     the air   cooled        15V               22               16
condenser(s) is recommended.
                                          20V               22               16
On rising vertical hot gas pipes,         26V               28               16
traps or syphons should be fitted         30V               28               16
every 6 metres to allow oil
                                          (‘) valid for lenths up to 30 m (equivalent
circulation in the system. On
                                          length).
horizontal    hot    gas    discharge
pipelines a minimum 1% slope (in
flow direction) should be installed to
achieve oil return to the compressor.
                                                                          Page 3
                                                      DAT’Air Installation Data
3.2.2 Pipe Installation                         Dust in the pipes can cause damage
                                                and lead to the premature failure of
Pipe installation is one of the most            the system.
important operations to have an
efficient refrigerant system.
                                                Pipe bending should be carried out
Pipes must be handled with care to              with a proper pipe bending tool
avoid damage.                                   using pulleys and with a curve
                                                dimension of the same size as the
Pipes should be cut to the exact size           pipe diametre.
with a proper pipe cutter, pipes must
then be cleaned to remove dust and
swarf.                                          3.2.3 Refrigeration Pipe
                                                      Connections
                                                Once refrigerant pipes are installed,
                                                they should be connected to the
                                                indoor and outdoor sections – not
                                                left open.
Unit Refrigerant Pipe Connections
 MINIDAT & CONSOLE
 Model
                  50                 80              110           150           170
 O/UEDA
 Hot Gas Line
                  16                 16              18            18            18
 O.D. Copper (mm)
 Liquid Line
                  12                 12              12            12            12
 O.D. Copper (mm)
 MODULAR
 Model
                       100    140    180    230      235    260    350    440    520     550
 O/UEDA
 Hot Gas Line
                       18     18     18     18       18     22     22     22     22
 O.D. Copper (mm)                                                                        22
 Liquid Line
                       12     12     12     12       12     16     16     16     16
 O.D. Copper (mm)                                                                        16
 BIGDAT UNITS
 Model
                       280     360        460      13V      15V     20V        26V     30V
 O/UEDA
 Discharge Line
                       2×18    2×18       2×18     2x22     2×22    2×22       2×22    2×22
 O.D. Copper (mm)
 Liquid Line
                       2×12    2×12       2×12     2x16     2×16    2×16       2×16    2×16
 O.D. Copper (mm)
                                                                                Page 4
                                                  DAT’Air Installation Data
Once connections have been                  Refrigeration piping on air cooled
completed, it is necessary to clean         systems should be flushed and
the circuit by using nitrogen, after        pressure tested for leaks with dry
which a vacuum must be obtained in          nitrogen.
the pipes and condenser using the
charging port fitted in the system.         At this point, shut-off valves fitted in
                                            the unit must be opened. Nitrogen
We strongly advise against using            gas will transfer through the
the compressor as a vacuum pump,            refrigerant circuit. Leaks must be
in this case the guarantee is               checked in the pipe connections
deemed ineffective.                         with a leak detector and a vacuum
                                            of 300 microns achieved.
Table III – Units Refrigerant Charge R22 – R407c [kg]
 MODEL      50    80     110 150 170 100 140 180 230 235
 *EDA (‘)   2.2   2.4    2.6 4.0 4.4 2.6 4.0 4.4 4.7 5.8
 *EDW       1.0   1.3    1.5 1.9 2.4 1.5 1.9 2.4 2.7 3.4
 MODEL      260 350 440 520          550
 *EDA (‘)   8.3 8.9 9.6 10.5         12.6
 *EDW       3.8 3.9 4.2 4.5          5.4
 MODEL      280    360    460     13V    15V    20V    26V     30V
 *EDA (‘)   8.0    8.8    9.4     12.5   16.6   17.8   19.2    21.0
 *EDW       3.8    4.8    5.4      6.5   7.6    7.8    8.4     9.0
(‘) Denotes fitted with air-cooled condenser.
                                                                           Page 5
                                               DAT’Air Installation Data
3.3    Piping Connections                servo controlled modulating valve
                                         operated by a microprocessor
                                         controller in accordance with the
3.3.1 To the Water Condenser             environmental temperature load and
      (*EDW)                             humidity load (HH versions).
Threaded copper pipes are used for
water pipe connections on all units.
Inlet and outlet connections are
shown in the technical data sheets
(section 2). The water cooled
models are designed to run with
cooling tower or closed circuit dry
coolers.
Supply water pressure should range
from 2-10 bar, if this differs please
contact our Technical Department.
A pressure regulating valve is fitted
to all units operating with a cooling    3.3.3 Condensate Drainage
tower.
                                         A condensate drain connection is
Water flow rates and the relative        required for the condensate tray.
pressure drops are given in the          Install a trap to avoid the return of
technical details. It is recommended     bad smells and to ensure the correct
to fit ball valves at the inlet          draining of the system. Once this
and outlet of the condenser, so the      operation is completed, verify that
air conditioner can be isolated in the   condensate is properly draining by
case of extraordinary maintenance,       filling the tray with water away from
or if they have to be relocated.         the draining hole.
                                         3.3.4 Connection to Humidifier
Note: “condenser water inlet”                  (HH Versions)
identifies  the inlet  water
connection.                              For those units, fitted with a
                                         humidifier, connect the inlet to a
                                         filtered water supply and outlet to a
All condensers assembled on
                                         drain    system.    The    humidifier
dat’air units are of the plate type,
                                         controller detects water hardness
for this reason we strongly              and automatically drains the salt rich
recommend the installation of a          water.
metal mesh filter on the water
inlet pipe, mesh max.1 mm                For additional instructions see the
                                         humidifier’s use and maintenance
3.3.2 To the Cooling Coil (*FC)          manual (CDD).
Threaded connections are used for        Warning:     do     not    supply
water pipe connections on all units.     demineralised or softened water
Inlet and outlet connections are         into the humidifier! Supply water
shown in the technical data sheets.      pressure should be between 0.3
Each unit is fitted with a three way,    and 0.6 bar.
                                                                      Page 6
                                               DAT’Air Installation Data
3.3.5 General Advice on Water            Cable     section  and     line
      Pipe Connections                   protections should conform to
                                         the information given on the
i Gate or globe valves to isolate        wiring   diagram   and   local
  the unit from the water circuit.       requirements.
i Metal mesh filter (in the inlet        Supply voltage should not be
  pipe) with a maximum mesh of 1         subject to variations greater than
  mm, to protect the heat                +5% and the unbalance between
  exchanger     from     waste     or    phases should always be lower than
  impurities present in the pipes.       2%.
i Air valves, located at the highest     If this is not the case, contact our
  point of the water circuit, to allow   Technical Department to decide
  bleeding of air from the system.       upon      the    most    appropriate
                                         protection.
i Automatic filling valves to
  maintain system pressure and to        Electrical connections should be
  compensate      for     thermal        carried out following the instructions
  expansion.                             given on the wiring diagram supplied
                                         with the unit.
i Drain    cock,      and    where
  necessary, a drainage tank to          Earthing is compulsory by law. The
  empty the unit for maintenance.        installer shall connect the earth
                                         cable to the earth bar on the
3.4   Electrical Power and               electrical panel.
      Earthing                           Power for the control circuit is from
                                         the main line through a transformer
                                         located in the electric panel.
3.4.1 General
                                         The control circuit is protected by a
i Check visually that the electrical     circuit breaker.
  circuits have not been damaged
  during transportation.                 Wiring diagrams are attached to the
                                         equipment inside the electric panel.
i Check that the screws on all           The power cable has to be
  various terminals are well             connected to the input terminals.
  secured.
i Check that supply voltage
  corresponds to the unit’s nominal
  data (voltage, phases and
  frequency) shown on the label on
  the equipment.
For cable entry, use the special hole
in the base of the unit(s).
                                                                      Page 7
                                                           DAT’Air Installation Data
3.4.2 Alarm and External                            HIROTEC DAT’AIR units are
      Connections                                   designed to work properly over a
                                                    wide operating range, it is highly
In the terminal block. there is a                   recommended not to exceed these
voltage free contact for a general                  operating limits, room temperature,
alarm.                                              outdoor air and water temperatures.
For a remote ON-OFF of the unit,                    If this situation should occur the unit
connect the external switch to                      may stop due to safety devices In
contacts indicated in the wiring                    the worst case, it may fail. These
diagram.                                            limits are reported in Table 1. If
                                                    there is need to exceed these limits,
N.B: The external switch disables                   please contact our Technical
the ON-OFF control on the small                     Department.
front panel of the unit.
                                                    Refrigerant Relief Valve
When carrying out the connections
described,   follow  exactly  the                   Each (Direct Expansion) unit is fitted
instructions given in the wiring                    with a relief valve on the liquid line in
diagram.                                            order to reduce the risk of damage
                                                    to the system in the event of high
                                                    system pressure.
Operating Limits
Table 1 – Operational Limit
Air Cooled
                               Min     Max                                                  Min    Max
Room inlet                     18      30      Condenser Inlet air temperature °C           15     40
air temperature °C
Water Cooled
                               Min       Max                                             Min       Max
Room inlet                     18        30         Condenser        inlet         water 19        47
air temperature °C                                  temperature °C
                                                    Outlet water temperature °C             27     50
                                                    Water thermal difference °C (‘)         3      8
(‘) Water thermal difference must always guarantee water inlet-outlet operation limit
Table II – Freezing Point for Water Ethylene Glycol Mixtures.
  Weight percentage              %           10           20           30           40            50
  Freezing point                 °C          -4.8         -9.9         -17.2        -26.6         -38.3
Table III – Control and Safety Devices, Factory Settings .
 CONTROL/SAFETY DEVICE                         SET POINT         DIFFERENTIAL           RESET TYPE
 Control Thermostat             °C             24                2                      --
 Control Humidstat (HH versions) %             50                2                      --
 High pressure switch           bar            26                7.7                    Manual
 Low pressure switch            bar            0.7               1.0                    Automatic
                                                                                        Page 8