●   Structural steel
Location: Chicago, Illinois                                                                           ●   Cladding : black aluminum
         Site area: 3 acres                                                                                        structure and bronze tinted vision
                                                                                                                   glass    panels allows natural
         Building area: 4,565,844 sq.ft.
                                                                                                                   lighting of the building and views
         Height: 1450 ft, 1730 ft including twin                                                                   from all exterior walls. Acts as
                       antennae                                                                                    insulation between exterior and
                                                                                                                   interior, maintaining a relatively
         Number of stories: 110
                                                                                                                   constant temperature, which helps
         Architect and Structural engineers:                                                                       in minimizing the expansion and
         SOM (Skidmore, Owings & Merrill)                                                                          contraction of the frame.
         Year of construction: 1974
                                                                                                                   Structural system
17   t
         Building use: Commercial + office                                                                         ● Tube construction                                                            W
         Sears was the biggest retailer                                                                            ● Internal support columns and bracing.
h                                                                                                                  ● The frame system is not efficient for larger heights due to large            IL
         1968    -   Decides to build their headquarters                                                              quantity of steel required.
Ta       1970    -   Groundbreaking and sub structure      The building construction is completed in 1974, it      ● Khan used the perimeter tube structures inset of a central core.             LI
                                                           remained the tallest tower in the world for 25 years.   ● Made of nine, 75 ft x 75 ft (22.9 m × 22.9 m) square steel tube
lle      1971    -   Super structure construction
                                                           Now:                                                       units                                                                        S
         1974    -   Construction completed
 st                                                         ● National Ranking -2 Tallest in United States         ● The tubes are clearly visible from the exterior of the building
SK
          SITE       :3                                     ● City Ranking -1 Tallest in Chicago                   ● Due to the structure's height-to-width ratio, a single framed tube is         T
                     ACRES                                                                                            not adequate
YS                                                                                                                 ● Bundling tubes increases strength                                            O
CR                                                                                                                                                                                                W
AP                                                                                                                                                                                                E
ER
                                                                                                                                                                                                  R`
                                                                                                                                  Shear lag of typical building   Reduced shear lag
                                                                                     ●   Three-foot-thick wall dug around the perimeter of building site.
                                                                                     ●   Bentonite Clay Slurry poured into excavation panels to prevent ground collapse and infiltration.
                                                                                     ●   The excavation panels reached approximately 5 stories into the ground.
                                                                                     ●   With concrete foundation wall in place, the entire site was excavated to 5 0 feet.
                                                                                     ●   114 reinforced concrete caissons of varying diameter (6ft - 10ft) were dug another 50’ into the earth.
                                                                                     ●   Drilled shafts go to the bed rock due to heavy loads.
                                                                                     ●   Steel jackets filled with concrete is located under each column.
                                                                                     ●   A 5 -f oot concrete matt was poured at the bottom of the excavation site which tied all caissons
                                                                                         together and became the bottom level of the sears tower.
            RESHANTH (11614224) ROLL NO.- B28                AVINASH (11613495) ROLL NO. – B 31 ADVANCE BUILDING TECHNOLOGY ARC 403