PADMA BRIDGE:
A PRIDE FOR NATION 1
A DREAM CAME TRUE FOR THE NATION
2
INTRODUCTION
3
AIM
To project the details of Padma Bridge as a pride
for the nation
4
SCOPE
Location of Padma Bridge
Project Cost Summary
Purposes of Padma Bridge
Challenges of the Padma Bridge
Details of Construction of the Bridge
5
LOCATION OF THE PADMA BRIDGE
6
COST SUMMARY
Estimated Project Cost
(as per Final Design):
BDT 30,1933.7 CR or,
USD 3.868 Billion
Initially it was 10,161
CR in 2007
It raised around 197%
from original estimated.
7
PURPOSES OF PADMA BRIDGE
Improve the country’s surface transport systems
Increase the nation’s economy
Utilities can pass through Padma bridge like gas,
Electricity, optical fiber for telecommunication
Develop railway connection
8
PURPOSES OF PADMA BRIDGE
Develop industrial sector
Increase working sector
Previously, we needed more then 1 hour to
cross the river. After completion of this Padma
Bridge, we can cross it within 6 minutes.
9
CHALLENGES OF PADMA
BRIDGE
River ruling
Flood occurs every year
Seismic possibility
Required deep pile foundation
Extreme scouring under the river
10
CHALLENGES OF PADMA BRIDGE
Rehabilitation of
people living near
the Padma river
Land acquisition
Protect geographic
environment and
faced many issues.
11
12
CONSTRUCTION OF BRIDGE
The bed of Padma is under 40 m from the water
surface. Approximately 130 feet. The characteristics
of bed of this river is soft clay or sandy clay type. The
pile provided under this river is 128m long.
These piles are cylindrical round shape.
Diameter is 3 m about 10 feet and manufactured by
mild steel .Thickness is 70 mm, about 3 inch.
The life time of Padma Bridge is 100 years.
Each columns stands on 6 piles. Pile load capacity is
8 thousand ton.
13
SUMMARY
It is a multipurpose road and rail bridge over
the Padma River.
It is the 122nd largest bridge in the world.
The construction journey was started by China
Railway Major Bridge Engineering Company Limited
on 7 December 2014.
The whole construction of the Bridge was
completed on 22 June 2022.
The bridge has been opened by Honorable Prime
Minister, Sheikh Hasina on 25 June 2022.
14
CONCLUSION
15
THANK YOU