Ohio Data Centers
Data updated Jul 2026
Ohio has 238 tracked data center facilities: 182 operational, 13 under construction, 43 planned, totaling 9,299 MW of tracked capacity.
Capacity by stage
7,358 MW of the 9,299 MW tracked in Ohio is not yet running. Only 60 of 238 facilities publish a capacity figure, so the real total is higher.
What they are built for
Type is recorded for 226 of 238 tracked facilities. Glossary
Top Operators
Top Counties
| County | Facilities | Operational | Pipeline | Capacity (MW) |
|---|---|---|---|---|
| Franklin County | 65 | 59 | 6 | 1,448 |
| Licking County | 33 | 20 | 13 | 2,146 |
| Cuyahoga County | 27 | 26 | 1 | 157 |
| Hamilton County | 17 | 17 | 0 | 18 |
| Summit County | 10 | 10 | 0 | 16 |
| Butler County | 8 | 6 | 2 | 299 |
| Delaware County | 7 | 5 | 2 | 104 |
| Warren County | 6 | 6 | 0 | 12 |
| Stark County | 5 | 5 | 0 | 223 |
| Montgomery County | 5 | 5 | 0 | 1 |
Climate Risk Distribution
Scored by the FEMA National Risk Index.
Water Stress Distribution
Basin-level water stress from WRI Aqueduct.
Tracked Facilities (25)
The 25 largest of 238 tracked facilities, by reported capacity. The interactive map carries the full set.
| Name | Company | City | Status | Capacity (MW) |
|---|---|---|---|---|
| Meta Prometheus | Meta | New Albany | Under Construction | 1,000 |
| Cologix Johnstown Campus | Cologix | Johnstown | Planned | 800 |
| PORTS Technology Campus | SB Energy | Piketon | Under Construction | 800 |
| Vantage Millersport Campus | Vantage Data Centers | Fairfield | Planned | 800 |
| Stargate Lordstown | Stargate | Lordstown | Planned | 750 |
| Bitdeer Clarington | Bitdeer Technologies Group | Clarington | Planned | 570 |
| DP Facilities - Hannibal Gap Data Center | DP Facilities | Hannibal | Planned | 500 |
| Van Wert Data Center | Thor Equities | Van Wert | Planned | 500 |
| Resilience CMH II | Overwatch Capital | Canal Winchester | Planned | 360 |
| Bitdeer Niles | Bitdeer Technologies Group | Niles | Planned | 300 |
| LightHouse CLT01 | LightHouse Data Centers | Hamilton | Planned | 288 |
| Meta New Albany Data Center | Meta | New Albany | Operational | 250 |
| Bitdeer Massillon | Bitdeer Technologies Group | Massillon | Operational | 221 |
| Aligned - 6770 Mink St | Aligned | Pataskala | Planned | 200 |
| Amazon AWS CMH - Beech South Campus | Amazon | Johnstown | Operational | 200 |
| New Albany | Amazon | New Albany | Operational | 200 |
| EdgeConneX Ashville Data Center | EdgeConneX | Pickaway | Planned | 197 |
| Vantage Building 1 | Vantage Data Centers | New Albany | Operational | 192 |
| Vantage Building 2 | Vantage Data Centers | New Albany | Operational | 192 |
| Vantage Building 3 | Vantage Data Centers | New Albany | Operational | 192 |
| 3560 East 55th Street | Lakeland Equity Group | Cleveland | Planned | 150 |
| New Albany Business Park | CBRE | Park | Operational | 120 |
| Aligned Data Centers OH Data Center | Aligned | Sandusky | Operational | 96 |
| Cologix COL5 | Cologix | Lewis Center | Planned | 95 |
| 226 North Fifth Street | Hackman Capital Partners | Columbus | Operational | 69.6 |
Frequently Asked Questions
How many data centers are in Ohio?
Ohio has 238 tracked data center facilities: 182 operational, 13 under construction, and 43 planned or approved.
How much data center capacity does Ohio have?
Ohio has 9,299 MW of tracked data center capacity. Capacity is only reported for a subset of facilities, so the actual total is higher.
Who operates the most data centers in Ohio?
Amazon operates the most tracked data centers in Ohio, with 17 facilities.