MNT.8:11 - SoTA-Echoing
For the question “What supports beginning this protected intervention?”, this pattern adapts the actual-control and verification logic illustrated by OSHA 1910.147. Against a stop-command or permit-only default, the Method adds verified protection, bounded permission and controlled changes of state. The source is an operative US example within its scope, not a universal maintenance law; apply the requirements in force for the local work. FPF A.2.8.PER and FPF C.11.DUA distinguish permission from requirement merits. Reopen when work, configuration, exposure, personnel transition or the applicable rule changes.