MNT.8:12 - Relations
MNT.1 identifies the relevant unit, use and control. MNT.5 and MNT.7 establish support and timing; MNT.6 selects the proposed work. Practitioners use MNT.9 to carry out the intervention within the resulting conditions, while MNT.10 and MNT.11 use controlled testing and restoration for their different results. FPF A.2.8.PER governs permission, FPF A.2.2 capability and FPF C.11.DUA a requirement-merits appraisal.