Skip to content

alink wip

alink wip #30

Triggered via push November 6, 2024 12:00
Status Failure
Total duration 23s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

1 error and 2 warnings
build (GZ2E01)
Docker pull failed with exit code 1
build (GZ2E01)
Docker pull failed with exit code 1, back off 5.502 seconds before retry.
build (GZ2E01)
Docker pull failed with exit code 1, back off 5.283 seconds before retry.