Milestones

List view

  • Overdue by 8 year(s)
    Due by July 7, 2017
    1/2 issues closed
  • Get NeMo to output data so that we can visualize core activity over a simulation run.

    Overdue by 8 year(s)
    Due by June 24, 2017
    0/1 issues closed
  • Integration of NeMo into the CODES network simulation framework to achieve simulation capabilities of many interconnected neuromorphic chips using an MPI communication layer on top of HPC interconnection networks such as Fat-Tree, Dragonfly, Torus and Slimfly for inter-chip spike communication.

    Overdue by 8 year(s)
    Due by April 30, 2017
    1/4 issues closed
  • We need a basic input system up and running. This does not have to be the fastest or most elegant solution, but something that works.

    Overdue by 7 year(s)
    Due by June 7, 2018
    2/5 issues closed