Skip to content

Call peak without chip-seq input control. #457

@ljw20180420

Description

@ljw20180420

Description of feature

If there is not chip-seq input control, then the pipeline does not call peaks by macs3. It is hard to find input control on ncbi. It will be useful if the pipeline can call peaks without chip-seq input control.

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions