List view
* New navigation system (removing the fixed header is included as well)
No due date•15/23 issues closed- Overdue by 3 month(s)•Due by September 15, 2025•249/249 issues closed
This milestone must have: 1. All the 4 spaces developed and teste (iniciatives, assemblies, processes and consultations), 2. A robust system of verifications, 3. Admin roles and granularity, 4. Stable components: proposals (with relations), meetings, blog, debates (might be converted to special type of proposal), surveys (with automatic publishable results), 5. Chat and messages, 6. Actions: support, adhere, follow, sign, 7. Completed polymorphic follow, 8. Design cards updated, 9. Redesign of home page with all participatory-space content displayable on home page, 10. Redesign of process home page, 11. Tags, 12. Adaptation to EU data protection directive + Privacy revision, 13. Admin-log, 14. Docker install image and documentation, 15. Admin manual in English
No due date