Skip to content

fix: update test fixtures and fix test failures #365

fix: update test fixtures and fix test failures

fix: update test fixtures and fix test failures #365

Triggered via push December 21, 2025 05:30
Status Failure
Total duration 4m 43s
Artifacts

tests.yml

on: push
Lint
5s
Lint
e2e precompile tests
0s
e2e precompile tests
e2e warp tests
0s
e2e warp tests
e2e load tests
0s
e2e load tests
Image build
0s
Image build
Matrix: unit_test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Lint
Process completed with exit code 1.
Golang Unit Tests (macos-latest)
Process completed with exit code 1.
Golang Unit Tests (ubuntu-22.04)
Process completed with exit code 1.
Golang Unit Tests (ubuntu-latest)
Process completed with exit code 1.
Golang Unit Tests (windows-latest)
Process completed with exit code 1.