fix(deps): update node to v1.22.27, consensus to v1.22.35 #374
tests.yml
on: push
Lint
5s
e2e precompile tests
0s
e2e warp tests
0s
e2e load tests
Image build
Matrix: unit_test
Annotations
5 errors
|
Golang Unit Tests (macos-latest)
Process completed with exit code 1.
|
|
Lint
Process completed with exit code 1.
|
|
Golang Unit Tests (ubuntu-22.04)
Process completed with exit code 1.
|
|
Golang Unit Tests (windows-latest)
Process completed with exit code 1.
|
|
Golang Unit Tests (ubuntu-latest)
Process completed with exit code 1.
|