Skip to content

fix(deps): update node to v1.22.27, consensus to v1.22.35 #374

fix(deps): update node to v1.22.27, consensus to v1.22.35

fix(deps): update node to v1.22.27, consensus to v1.22.35 #374

Triggered via push December 21, 2025 08:09
Status Failure
Total duration 20m 59s
Artifacts

tests.yml

on: push
Lint
5s
Lint
e2e precompile tests
0s
e2e precompile tests
e2e warp tests
0s
e2e warp tests
e2e load tests
e2e load tests
Image build
Image build
Matrix: unit_test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Golang Unit Tests (macos-latest)
Process completed with exit code 1.
Lint
Process completed with exit code 1.
Golang Unit Tests (ubuntu-22.04)
Process completed with exit code 1.
Golang Unit Tests (windows-latest)
Process completed with exit code 1.
Golang Unit Tests (ubuntu-latest)
Process completed with exit code 1.