Skip to content

electrs

electrs #4048

Triggered via schedule October 19, 2025 01:48
Status Failure
Total duration 11m 16s
Artifacts

rust.yml

on: schedule
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Build (ubuntu-latest, --locked --no-default-features)
Process completed with exit code 101.
Build (ubuntu-latest, --locked)
The strategy configuration was canceled because "build.ubuntu-latest_--locked_--" failed
Build (ubuntu-latest, --locked)
The operation was canceled.
Build (ubuntu-latest, --locked --features metrics_process)
The strategy configuration was canceled because "build.ubuntu-latest_--locked_--" failed
Build (ubuntu-latest, --locked --features metrics_process)
The operation was canceled.