Skip to content

Op 35885 circleci migration #19

Op 35885 circleci migration

Op 35885 circleci migration #19

Triggered via pull request December 19, 2025 19:06
Status Failure
Total duration 2m 35s
Artifacts

commit.yml

on: pull_request
Matrix: test-node
release
release
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test-node (24.11.1)
Process completed with exit code 2.
test-node (22.21.1)
The strategy configuration was canceled because "test-node._24_11_1" failed
test-node (22.21.1)
The operation was canceled.
test-node (20.19.6)
The strategy configuration was canceled because "test-node._24_11_1" failed
test-node (20.19.6)
The operation was canceled.