Skip to content
Closed
No due date
Closed Dec 3, 2025
80% complete
  • SOC reserve setting support for systems managed by a station (SB3, multisystems)
  • Grid export setting support for systems managed by a station (SB3, multisystems)
  • 3rd Party PV power and energy stat support for systems supporting it (SB3)
  • Multisystem support for proper power values and settings via a station in the system
    • The station can be virtual (all SB3 systems now are managed via a station), or have a real power dock that 'acts' as a station. However, this will be just a logical assignment in the Api library, because the power dock is a passive device, not connected to Wifi or Cloud and therefore not reported as an individual device (although the App makes it appear like an own device). The library must create a 'virtual device' for it to track SN and other entities that belong to the virtual or physical station in the system.

List view