"For I know the plans I have for you," declares the Lord, "plans to prosper you and not to harm you, plans to give you hope and a future." Jer 29:11 (NIV)
Showing posts with label DWR. Show all posts
Showing posts with label DWR. Show all posts

Friday, October 23, 2009

Delivered!

Finished up the pillow shams yesterday and delivered everything yesterday afternoon. =) My customer was really happy with it and I'm thankful for that. This picture shows the quilt and shams on the bed.


Gratitudes:

1. Am finished with this commissioned quilt.

2. The book with the Praxis Info in it (review quide and practise study tests) arrived in the mail yesterday.

Wednesday, October 21, 2009

The end is in sight.........

.........I've finished the commissioned Double Wedding Ring quilt! And love how it turned out. =) The quilting is great, and I'm thankful that Trish was able to get it done so quickly for me. Am working on the matching pillow shams at the present time and the plan is to finish them either today or tomorrow so I can deliver them tomorrow. =) Here are a couple pics of the finished quilt and the quilting.











Gratitudes -
1. I had just enough of one of the green fabrics to make the right number of arcs for the quilt and the pillow shams.
2. For Trish slipping this quilt into her line up and quilting it for me.

Sunday, August 30, 2009

Progress...


....has been made on the DWR that I'm working on...........and other than a sore finger from all the hand sewing, I'm loving how it's turning out. =)
Have started sewing the rings for the next 5 full blocks and 4 quarter blocks. The current plan is to get them together and pinned to background squares so that I can take them with me to work on when I make a flying trip to Northern CA for an in-person interview Wed of this week.
Gratitudes:
1. For still being able to sew and quilt even with most of my stuff in storage at this time.
2. For the coming interview this week.

The ending of an "era"

An "era" is ending for me as I get closer to moving out of my TX house. Moving day came and went yesterday, and most of what was still in the house is now residing in my rented storage unit. Frig and sofa will be moved there sometime this week, exact date depends on when closing gets scheduled for. I need to call the gal I spoke with about rentring a room from so that I have somewhere to move when the short sale closes.

This coming Wed I fly to Oakland CA for a job interview (contract job possibility). Am making the RT all the same day 'cause I had to pay for it..........will be a long day, but Lord willing it will go well. Haven't heard anything about the job possibility in MA............which is a bummer 'cause I'd really like to get that job. Love living out there as well, but will go where ever God opens the door for the next job.

Meanwhile have been enjoying continuing to work on the DWR quilt. Have 2 more full blocks finished and am working on the third. Am also working on making arcs for the next 5 full blocks and 4 quarter blocks. Am planning on taking those with me to applique down as I make the RT trip to/from Oakland next week.

Gratitudes:
1. God has opened the door for a job interview in CA.
2. The phone interview last week went great!

Friday, August 28, 2009

Roller coasters of life....

....that's what it has seemed like was happening to with the short sale of my house this week. There were many twists and turns, but thankfully everything is now falling into place (dont'cha just love how God works things out) and it looks like it will close late next week or the first of the week after that. I'll be happy to have it over and done with...........

The quilt pic on the right is the first DWR block that I made as a test block. It's in RWB colors and I have 8 more blocks planned to go with it. It will be the center medallion of an American Hero quilt when I'm finished with it. The planned blocks will not be full blocks like this, but when finished and together it will look like there are 5 interlocking rings.
The picture on the left shows two orphan blocks that I found this week while going through stuff. Both are paper-pieced and made with Hand-dyed fabric. Am thinking of maybe making a table topper of some sort with them.....

Gratitudes -

1. Cooler weather today

2. Good friends who are willing to help me move stuff into storage.

Tuesday, August 25, 2009

Quilting Mojo

One of the things that vanished during July and most of August as well with everything that was happening was my quilting mojo...........it's been a long time since i have felt so wiped out, so much so that I wasn't even quilting.

However, I have found it again and am once again quilting. And other than needing to get the border on a quilt so I can send it off to be quilted, I have started a double wedding ring quilt that I have been commissioned to make. I love the colors and love how it is turning out. And even have plans to make a second one to use the sample block that I made in RWB colors. It will be going to American Heroes when finished. And yes, there was a time when I had sworn I would never make one............


Meanwhile, here is a picture of what I've got completed so far. I'm paper-piecing the arcs using 6 shades of green. Two shades of lavendar are in the arcs. And because I stymied in getting the attempted machine applique to look good, have decided to hand applique the rings down to the background fabric squares. Yes, I can applique, and it even looks decent...........but the laugh is on me because I had never wanted to do a hand applique quilt because it is a "slow" method. I do like how it's looking, and will have no excuse to not use hand applique to do one of the BOM's that I have stashed away.


Gratitudes:
1. Thankful for the fact that I'm a fast stitcher 'cause I need to get this quilt done quickly!

2. For understanding clients.