Site Update Report
Reverie Power & Automation Engineering Ltd.
                                         Name of the project: Desh Energy 200MW Power Plant                                     Client: Desh Energy   Date: 3.7.2018
                                                                                                    Work plan
                Scope of work                                Progress                                                 Over all site in picture
Transformer Supply, installation, Testing, Commissioning
                                                                 55%
GIS Supply, installation, Testing, Commissioning
                                                                 70%
Substation Structure Supply,Installation                         85%
LA, CP Supply, Installation, Testing, Commissioning              0%
Cable ladder installation at cable cellar under MV room          95%
MV Switchgear Supply, Installation, Testing, Commissioning
                                                                 10%
CRP Supply, Installation, Testing, Commissioning                 50%
DC system Supply, Installation, Testing, Commissioning           20%
Installation of cable tray for substation Cable trench           85%
Substation Control cable termination                             0%
132 KV power cable Supply and laying                             58%
133 KV power cable termination                                   5%
Cable trench for 132 KV power cable                              98%
Supply, installation of Cable tray for MV cable                  60%
MV Power cable Supply, laying and testing                        0%
Auxiliary transformer Supply, Installation, Testing and
commissioning                                                    20%
LV room cable tray installation                                  90%
LV panel supply, installation, Testing and Commissioning         0%
Cable ladder installation at compressor room                     0%
Cable ladder installation at engine hall                         0%
Cable ladder installation for radiator                           0%
Control cable Laying for all power plant equipment               0%
Earthing System                                                  45%
Bus Duct and bus bar installation                                0%
Wartsila control Panel installation                              25%
Lighting System                                                  0%
                                                                 0%
                                                                                                                                                                              Work progress
   Power transformer                                                         GIS                                             Substation Structure                                             Bus Duct Installation                                                          Substation Cable trench                                                                     Earthing System
             No progress today                              SF6 filling and operation test in progress                                   No progress today                                   Transformer 4 Bus duct installation completed            Angel installation in transformer trench in progress. 75% of work finished                       No progress today.
   All 4 transformer installation completed                                                                           1 Gantry beam and 4 set LA structure installation pending                     Bus duct for TR 1,2,3 remaining                   Fabrication is in progress at workshop                                                           boring completed except boring for transformer neutral bushing.
             Testing in progress                                                                                                                                                                                                                          All cable trench except Tr trench angel installation finished. Painting and finishing work
                                                                                                                                                                                                                                                                                                 remaining.
AC, DC & Control cable for substation equipment                                                             MV switchgear & CRP                                                                       LV room                                                                         DC for substation                                                                132 KV Power Cable
                            No progress today                                                             MV panel installation in progress                                           Cable ladder installation 90% finished                                                          Battery rack fabrication                                                       Cable termination in progress
                                                                                                              CRP wiring in progress                                                     Panels not reached at site yet                                                                   panel installed                                                             8 cable out of 14 completed
                                                                                                                                                                                                                                                                                             Cable ladder installation for tank                            Cable ladder installation at cable
  DC System for Wartsila                           Cable ladder at engine hall                           Cable ladder for radiator                                                MV Cable                                            Auxiliary Transformer
                                                                                                                                                                                                                                                                                                    and fuel pump area                                          cellar under MV room
     Panel shifting completed                       Ladder installation for MV cable                              Not started                                              Ladder installation                                    2 of 4 auxiliary transformers are placed on pad                                                                                           95% work completed
                                                              completed                                                                                                                                                                          No progress
      Power plant Control panel installation                                                  Control cable laying for Wartsila panel                                                          Lighting System                                                Power plant equipment Cable termination                                                                            LV cable
                       Panel shifted inside room                                                                     No trench                                                                        Not started                                                                        Structure not ready                                                                      No trench
                                                                     Site Manpower detail
                                                                  Designation                                                                       Number of persons
                                                                                                                             Project Manager
                                                                                                                                  Site incharge
                                                                                                                                 Site Engineer
                                                                                                                              Site Commercial
                                                                                                                               Site Supervisor
                                                                                                                                     Technician
                                                                                                                                      Foreman
                                                                                                                                          Fitter
                                                                                                                                      Line man
                                                                                                                                         Welder
                                                                                                                                         Helper
                                                                                                                Centrifuge machine operator
                                                                                                          Others ( Cook, Office assistant, etc )
                                                                                                                                            Total
                                                             Tools, Equipment & Vehicle List
Sl.No
                                Tools, Equipment & Vehicle Name                 Arrival date   Quantity        Condition                              Remarks
        1    Crane
        2    Hydra
        3    Welding machine
        4    Grinding machine
        5    Drill machine
        6    Mechanical Tools
        7 Electrical Tools
        8 Hydraulic jack
         9   Pillar Drill Machine
        10   Vacuum Machine
        11   Oil centrifuge machine
        12   Dilo machine
        13   CRT Kit
        14   BDV test kit
        15   IRT Kit
        16   ERT Kit
        17   PPM kit
        18   Ferule printer
        19
        20
        21
        22
        23
        24
        25
        26
        27
        28
        29
        30
        31
        32
        33
        34
        35
        36
        37
        38
        39
        40
        41