Total by Colour
Total by Colour
Durati formula
ROW SL Start ACTIVITY on Link Status Completion Remarks Remarks Action check
3 1 VESSEL COMPLETION unlink forward scheduling
4 A 28-Oct-24 CABLE -HULL (Pay 20-May)- material delivery in yard 130 unlink 7-Mar-25 DELIVERY -75%; 140 km
5 28-Oct-24 CABLE - ACC (Pay 20-May)- material delivery in yard 130 link 7-Mar-25 DELIVERY -90%; 40 KM threat of more cable to get rejected
duration reduced; old cables to start
6 8-Mar-25 CABLE PULLING 115 unlink 1-Jul-25 Manpower planning to be done laying on 30 nov
to complete 90 days before cable
7 Ongoing CABLE TRAY INSTALLATION 70 link 2-Apr-25 pulling
8 Ongoing CABLE TERMINATION na link 15-Aug-25 detailed breakup required to complete 45 days after cable pulling Rajevan
9 B na Equipment installtion- below main deck na link 17-May-25 detailed breakup required 90 days before cable termination paramesh
10 na Equipment installtion- above main deck na link 17-May-25 detailed breakup required 90 days before cable termination paramesh
11 C na Completion of piping na link 17-May-25 detailed breakup required 90 days before cable termination sitaram
to start 90 days before cable
12 D 17-May-25 Commissioning 210 link 13-Dec-25 detailed breakup required termination nidheesh
to complete alongwith commission
13 6-Dec-25 Full jack up trials 7 13-Dec-25 completion date
14 E 15-Dec-25 INCLINATION TEST 7 link 22-Dec-25
15 F 23-Dec-25 Sea Trials- with DP 15 link 7-Jan-26
16 G 8-Jan-26 Punch List clerance 15 link 23-Jan-26
17 H 23-Jan-26 Sail Away 1 link 24-Jan-26
18
19 TARGETED DATE (variable value) 28-Dec-25 46019.00 goal seek input to 1 H
20
21 2 Engine readiness Link 17-May-25 revrese scheduling target date taken from 1B
22 A 17-Apr-25 Final boxup of Equipment 30 Link 17-May-25
23 17-Mar-25 Engine Overhauling 30 Link 16-Apr-25
24 26-Nov-24 Spares to be identified and ordered 110 Link 16-Mar-25
25 Ongoing OEM interactions WS/OH/Spares Link Costing allocation, Initial inspection
to complete before start of engine
26 B Tanks completion (FO,Day,DOT , Exp ) Link 17-Mar-25 breakup in sec 5 overhaul
to complete 60 days before tanks
27 C Chock fasting Link 16-Jan-25 breakup in sec 6 completion
to complete before start of engine
28 D Piping completion ( SW,FO ,Sair, Exh,DO) Link 17-Mar-25 breakup in "Piping" overhaul
29 18-Mar-25 Flushing (as reqd) 15 Link 2-Apr-25 breakup in "Piping" forward scheduling
to complete 10 days before start of
30 E Supply & Exhaust for the Room Link 7-May-25 commissioning
to complete 10 days before start of
31 17-Apr-25 Installation completion & readiness 20 Link 7-May-25 commissioning
32 17-Dec-24 Procurement of Equipments 120 Link 16-Apr-25
to complete 10 days before start of
33 7-Jan-25 VMCC- procurement & readiness 120 Link 7-May-25 detailed breakup required commissioning sai
34 Ongoing Design and Engineering
35 F Engine room readiness detailed breakup required sitaram
Equipments to be made ready (Purifier, Compressor, Pumps,
36 G Ongoing coolers etc) breakup in "Equipments"
37
38 3 SWBD readiness (690/440/230/UPS/FS/ECR/FCU/Lighting) Link 17-May-25 revrese scheduling target date taken from 1B
39 A 2-Apr-25 Cable glanding and termination 45 Link 17-May-25
to complete 15 days after start of cable
40 18-Mar-25 SWBD Installation 30 Link 17-Apr-25 detailed breakup required glanding, termination etc nidheesh
to complete 15 days after start of swbd
41 B 16-Feb-25 Install spares & required power checks 45 Link 2-Apr-25 installation
ongoing/ manual date date to note date in the past event to occur in 30 days 12/23/2024
Durati formula
ROW SL Start ACTIVITY on Link Status Completion Remarks Remarks Action check
42 17-Dec-24 Spares identifying & ordering for SWBD & instrumentation 60 Link 15-Feb-25
to conclude scope for SWB before
43 Ongoing Engineering interfacing with KME Link 16-Dec-24 oredering spares
to complete before start of swbd
44 C 17-Nov-24 Cable pulling & dressing 120 Link 17-Mar-25 detailed breakup required installation nidheesh
to complete 30 days before cable
45 16-Jan-25 Cable tray completion 30 Link 15-Feb-25 pulling completes
to complete before cable tray
46 D Ongoing Tank testing and painting tanktop ( FO & Coffer dam ) Link 15-Jan-25 installation starts
SWBD room readiness (hot work, insulation, ducting,& to complete before cable tray
47 E Ongoing painting) Link 15-Jan-25 detailed breakup required installation starts sitaram
to complete before cable tray
48 F Ongoing Piping completion (chilled water, Novec, drain) Link 14-Feb-25 detailed breakup required installation is completed sitaram
linked to equipment readiness/ engine
49 G Ongoing FCU system readiness Link 17-May-25 readiness completion
to complete before start of swbd
50 H 10-Mar-25 Temp lighting & AC units 7 Link 17-Mar-25 installation
to complete before start of swbd
51 I 2-Nov-24 Procurement &False floor completion 135 Link 17-Mar-25 detailed breakup required installation sai
52
53 4 JACKING SYSTEM readiness
54 Ongoing Spud can readiness Unlinked 30-Oct-24 enter date manually
55 Ongoing Leg well Unlinked 20-Nov-24 enter date manually
56 Ongoing Jack house readiness Unlinked 20-Nov-24 enter date manually
57 10-Nov-24 Leg section Lower weld on Supdcan 12 22-Nov-24 forward scheduling (crane moves after 30% Weld )
Leg section Lower weld on Supdcan remain 70% weld
58 23-Nov-24 completion 13 6-Dec-24 weld completion
Leg LL with Spud install in Leg well (NPCC crane works
59 10-Jan-25 available on the required date) 20 30-Jan-25 forward scheduling
60 31-Jan-25 Jack house positioning on MD ( NPCC Crane ) 6 6-Feb-25
61 7-Feb-25 Leg middle section installation (each 30 % Weld ) 12 19-Feb-25 to start 10 days after completion ofabove Crane req duration only
62 20-Feb-25 Leg middle section installation remain 70% weld completion 18 10-Mar-25 leg completion Middle leg
63 20-Feb-25 Leg top section installation (each 30 % Weld )- less 10 mtrs 12 4-Mar-25
Leg top section installation remain 70% weld completion-
64 11-Mar-25 less 10 mtrs 18 29-Mar-25
to start after leg middle portion 30% is
65 20-Feb-25 Jacking Frames & Gearbox positioning & assy incl shc , Lcell 45 6-Apr-25 welded
66 Jacking components spares install; OH/OEM insp completion Ongoing details in Others sheet "Vend 2"
to start after jackhouse positioning on main
67 7-Feb-25 Cable tray installation ( jacking only ) in MD 9 16-Feb-25 deck
68 17-Nov-24 Cable pulling from swbr to jacking motor & wheelhouse 60 16-Jan-25 refer to 3C
to complete 15 days before completion of Other cable glanding in VSD in SWBD
69 Ongoing Cable glanding and termination 60 21-Apr-25 jacking frames positioning room can continue --
70 12-Mar-25 Local control panels 20 1-Apr-25 to start 40 days before cable glanding
to start 4 days after Swbd spares are
71 20-Feb-25 Jacking Panels ( SWBR) & cable termination 60 21-Apr-25 received & work started (others sheet)
Independent console technical details to be finalised with technical details to conclude to allow
72 Ongoing KME & Engg 5-Jan-25 purchase
73 Purchase of required equipment (if required) 60 6-Jan-25 duration of 60 days could be a variable
ongoing/ manual date date to note date in the past event to occur in 30 days 12/23/2024
Durati formula
ROW SL Start ACTIVITY on Link Status Completion Remarks Remarks Action check
to complete alongwith cable glanding &
74 7-Mar-25 Jacking console (wheel house) 30 21-Apr-25 termination Kongsberg scope needs to be finalised
Post this can plan Gusto site visit for jacking system (pre-
75 22-Apr-25 comm) incl leg trials 30 22-May-25
76 23-May-25 Load out plan 3 26-May-25
77
to complete before start of engine
78 5 Tanks completion (FO,Day,DOT , Exp )/ PAINTING/ OTHERS Link 17-Mar-25 overhaul
79 Ongoing Pit inspection in the FO Day tank 24 A & 24 B Unlinked 1-Oct-24
RECHECK
RECHECK
check conflict
check conflict
RECHECK/ DELETE
modify
RECHECK
RECHECK
RECHECK
RECHECK
ongoing/ manual date date to note date in the past event to occur in 30 days 12/23/2024
Durati formula
ROW SL Start ACTIVITY on Link Status Completion Remarks Remarks Action check
3
4 7 Piping & Flushing completion ( SW,FO ,Sair, Exh, DO) Link 2-Apr-25 target completion date
5
6 A Sea water cooling system - tgt date Link 2-Apr-25 target completion date
7
8 8-Sep-24 Modification - overboard - Engg 60 Link 7-Nov-24
9 8-Sep-24 Modification - buffer tank connections - Engg 60 Link 7-Nov-24
Modification - strainer arrangement on the cooler inlet -
10 8-Sep-24 Engg 60 Link 7-Nov-24
11 8-Nov-24 Pipe items procurement (incl fittings) ( SW system -ER) 40 Link 18-Dec-24 already on critical path
12
13 19-Dec-24 Sea Water System piping fabrication - incl all mods 20 Link 8-Jan-25
14 9-Jan-25 Sea Water System piping - galvanisation 20 Link 29-Jan-25
15 30-Jan-25 Sea Water System piping - Installation 25 Link 24-Feb-25
16 25-Feb-25 Sea Water System piping - Line walk 5 Link 2-Mar-25
17 3-Mar-25 Sea Water System pipe - testing 6 Link 9-Mar-25
18 10-Mar-25 Sea Water System pipe - Flushing ( as required) 10 Link 20-Mar-25
19 21-Mar-25 Sea Water System pipe - reinstatement & Painting 4 Link 25-Mar-25
20 26-Mar-25 Sea Water System pipe - Hand over to comissioning 7 Link 2-Apr-25 reverse scheduling
21
22 B 21-Dec-24 Fuel oil System piping fabrication - day tank to engine supply 10 Link 31-Dec-24 modification work to conclude
23 1-Jan-25 Fuel oil System piping installation - day tank to engine supply 10 Link 11-Jan-25
24 12-Jan-25 Fuel oil System piping fabrication - day tank to engine return 10 Link 22-Jan-25
25 23-Jan-25 Fuel oil System piping installation - day tank to engine return 10 Link 2-Feb-25
26 3-Feb-25 Fuel oil System piping - OA Line walk 5 Link 8-Feb-25
27 9-Feb-25 Fuel oil System pipe - testing 12 Link 21-Feb-25
28 22-Feb-25 Fuel oil System pipe - flushing 10 Link 4-Mar-25
29 5-Mar-25 Fuel oil System pipe - reinstatement & Painting 4 9-Mar-25
30 10-Mar-25 Fuel oil System pipe - Hand over to comissioning 7 Link 17-Mar-25 reverse scheduling 16 days before piping completion
31
32 C 10-Jan-25 Exhaust system - piping completion 40 Link 19-Feb-25 modification work to conclude
33 20-Feb-25 Exhaust system - line walk 4 Link 24-Feb-25
34 25-Feb-25 Exhaust system - functional test 1 Link 26-Feb-25
35 27-Feb-25 Exhaust system - reinstatement & Painting 4 Link 3-Mar-25
36 4-Mar-25 Exhaust system - Hand over to comissioning 4 Link 8-Mar-25 reverse scheduling 25 days before piping completion
37
38 D 26-Jan-25 Dirty oil system - piping completion 20 Link 15-Feb-25 modification work to conclude
39 16-Feb-25 Dirty oil system - line walk 5 Link 21-Feb-25
40 22-Feb-25 Dirty oil system - pressure test 5 Link 27-Feb-25
41 28-Feb-25 Dirty oil system - reinstatement & Painting 5 Link 5-Mar-25
42 6-Mar-25 Dirty oil system - Hand over to comissioning 7 Link 13-Mar-25 reverse scheduling 20 days before piping completion
43
44 E 13-Dec-24 Starting Air system - piping completion 60 Link 11-Feb-25
45 12-Feb-25 Starting Air system - line walk 7 Link 19-Feb-25
46 20-Feb-25 Starting Air system - pressure test 10 Link 2-Mar-25
47 3-Mar-25 Starting Air system - reinstatement & Painting 15 Link 18-Mar-25
48 19-Mar-25 Starting Air system - Hand over to comissioning 4 Link 23-Mar-25 reverse scheduling 10 days before piping completion
49
50 F 6-Jan-25 Drain System piping completion 40 Link 15-Feb-25
page 7 of 101
ongoing/ manual date date to note date in the past event to occur in 30 days 12/23/2024
Durati formula
ROW SL Start ACTIVITY on Link Status Completion Remarks Remarks Action check
51 16-Feb-25 Drain System line walk 9 Link 25-Feb-25
52 26-Feb-25 Drain System pressure test 8 Link 6-Mar-25
53 7-Mar-25 Drain System reinstatement & Painting 10 Link 17-Mar-25
54 18-Mar-25 Drain System Hand over to comissioning 5 Link 23-Mar-25 reverse scheduling 10 days before piping completion
55
56 G Chiiled water system piping completion Link
57 12-Feb-25 Chilled water system - piping completion 20 Link 4-Mar-25
58 5-Mar-25 Chilled water system - line walk 10 Link 15-Mar-25
59 16-Mar-25 Chilled water system - pressure test 10 Link 26-Mar-25
60 27-Mar-25 Chilled water system - reinstatement & Painting 15 Link 11-Apr-25
61 12-Apr-25 Chilled water system - Hand over to comissioning 5 Link 17-Apr-25 reverse scheduling 15 days after piping completion
62
63 H NOVEC piping system
64 7-Aug-24 Engineering finalisation on the Technicals 20 Link 27-Aug-24
65 28-Aug-24 PI drawing issuance and DNV approval submission 20 Link 17-Sep-24
66 18-Sep-24 PO and Delivery of NOVEC piping items 45 Link 2-Nov-24
67 3-Nov-24 Novec System- piping completion 120 Link 3-Mar-25
68 4-Mar-25 Novec System- line walk 14 Link 18-Mar-25
69 19-Mar-25 Novec System- pressure test 12 Link 31-Mar-25
70 1-Apr-25 Novec System- reinstatement & Painting 10 Link 11-Apr-25
71 12-Apr-25 Novec System- Hand over to comissioning 5 Link 17-Apr-25 reverse scheduling 15 days after piping completion
72
Fresh water cooling system( 98% work before loadout & 2%
73 I work after loadout) pending
74
75 J Hydraulic & lube oil tubing (after loadout) pending
76
page 8 of 101
ongoing/ manual date date to note date in the past event to occur in 30 days 12/23/2024
Durati formula
ROW SL Start ACTIVITY on Link Status Completion Remarks Remarks Action check
3 Equipments to be made ready (Purifier, Compressor, Pumps,
4 8 Ongoing coolers etc) Link 17-May-25 target completion date
5
6 A Revamping of the Fuel oil purifiers (tgt ER) Link 17-May-25 target completion date
7 11-Jan-25 Issuance of SRF for the purifier overhauling 5 Link 16-Jan-25
8 17-Jan-25 PO issuance OEM/ Competant Vendor for inspection and OH 20 Link 6-Feb-25
9 7-Feb-25 Initial inspection and ordering of required spares for OH 6 Link 13-Feb-25
10 14-Feb-25 Overhauling of Fuel oil purifiers 30 Link 16-Mar-25
11 17-Mar-25 Final boxup and ready for comissioning 15 Link 1-Apr-25
12 2-Apr-25 Lubes and Order for Comm and Opern spares (fwd delivery) 45 Link 17-May-25 reverse scheduling 0 days before piping completion
13
14 B Revamping of the Air Compressor (tgt ER) Link 14-May-25 target completion date
15 15-Dec-24 Issuance of SRF for the Air compressor overhauling 5 Link 20-Dec-24
16 21-Dec-24 PO issuance OEM/ Competant Vendor for inspection and OH 20 Link 10-Jan-25
17 11-Jan-25 Initial inspection and ordering of required spares for OH 20 Link 31-Jan-25
18 1-Feb-25 Overhauling of Air Compressor 40 Link 13-Mar-25
19 14-Mar-25 Final boxup and ready for comissioning 15 Link 29-Mar-25
20 30-Mar-25 Lubes and Order for Comm and Opern spares (fwd delivery) 45 Link 14-May-25 reverse scheduling 3 days before piping completion
21
22 C Revamping of the F.O Pumps & Motors (tgt ER) Link 11-May-25 target completion date
23 5-Feb-25 SRF issuance of the identified spares 5 Link 10-Feb-25
24 11-Feb-25 PO issuance of required spares for OH 10 Link 21-Feb-25
25 22-Feb-25 Delivery of Requested spares for F.O Pumps & Motors 60 Link 23-Apr-25
26 24-Apr-25 Overhauling of F.O Pumps & Motors 10 Link 4-May-25
27 5-May-25 Handover to comissioning 2 Link 7-May-25
28 8-May-25 Precom & Comm 3 Link 11-May-25 reverse scheduling 6 days before piping completion
29
30 D Revamping of the DOT Pumps & Motors (tgt ER) Link 8-May-25 target completion date
31 2-Feb-25 SRF issuance of the identified spares 5 Link 7-Feb-25
32 8-Feb-25 PO issuance of required spares for OH 10 Link 18-Feb-25
33 19-Feb-25 Delivery of Requested spares for DOT Pumps & Motors 60 Link 20-Apr-25
34 21-Apr-25 Overhauling of DOT Pumps & Motors 10 Link 1-May-25
35 2-May-25 Handover to comissioning 2 Link 4-May-25
36 5-May-25 Precom & Comm 3 Link 8-May-25 reverse scheduling 9 days before piping completion
37
38 E Revamping of the SW & Aux SW Pumps & Motors (tgt ER) Link 5-May-25 target completion date
39 19-Jan-25 SRF issuance of the identified spares 5 Link 24-Jan-25
40 25-Jan-25 PO issuance
Delivery of requiredspares
of Requested sparesforforSW
OH& Aux SW Pumps & 10 Link 4-Feb-25
41 5-Feb-25 Motors 60 Link 6-Apr-25
42 7-Apr-25 Overhauling of SW & Aux SW Pumps & Motors 21 Link 28-Apr-25
43 29-Apr-25 Handover to comissioning 2 Link 1-May-25
44 2-May-25 Precom & Comm 3 Link 5-May-25 reverse scheduling 12 days before piping completion
45
46 F Revamping of the Coolers (tgt ER) Link 2-May-25 target completion date
47 27-Jan-25 SRF issuance of the identified spares 5 Link 1-Feb-25
48 2-Feb-25 PO issuance of required spares for OH 10 Link 12-Feb-25
49 13-Feb-25 Delivery of Requested spares for Coolers 60 Link 14-Apr-25
50 15-Apr-25 Overhauling of Coolers 10 Link 25-Apr-25
51 26-Apr-25 Handover to comissioning 2 Link 28-Apr-25
52 29-Apr-25 Precom & Comm 3 Link 2-May-25 reverse scheduling 12 days before piping completion
53
Page 9 of 101
ongoing/ manual date date to note date in the past event to occur in 30 days 12/23/2024
Durati formula
ROW SL Start ACTIVITY on Link Status Completion Remarks Remarks Action check
3
4 Vend 1 OEM AUSTEVOLL -SWITCHBOARD not applicab
5 17-Dec-24 Spares identifying & ordering for SWBD & instrumentation 60 Link 15-Feb-25 taken from Schedule L1 sheet, 3B
6
Discussion with vendor on the modifications/upgrades
7 Ongoing scope. Link 17-Dec-24 to conclude before spares PO is issued
8 Ongoing Site visit and spares supply Link 17-Dec-24 if required
9 16-Feb-25 Installation of delivered items and box up 10 Link 26-Feb-25
10
11 Vend 2 OEM Gusto
12
13 Ongoing Financial closure with vendor Link 28-Oct-24 to conclude before this date
14 Ongoing Receipt of quote and reviews for MR 037 Link 26-Nov-24 to conclude before this date
15 27-Nov-24 PO issuance to transferred components - MR037 120 Link 27-Mar-25
to complete 10 days before completion
16 28-Mar-25 Installation of delivered items and box up 14 Link 11-Apr-25 cable glanding (sheet Schedule L1, sect 3)
17
18 Yard UPS/ BATTERIES pending
19 Vend 3 15-Feb-25 PO issuance to Batteries MR 031 75 Link 1-May-25
20 2-May-25 Batteries ready for Installation ( before comm) 15 Link 17-May-25 required at commissioning commencement
21
22 Vend 4 NOVEC system already reviewed in piping
23 Conclusion of system for purchase ( from piping file)
24 PO issuance to vendor (from piping file) 17-Sep-24 forward scheduling
25 18-Sep-24 Lead time for Novec system delivery 120 16-Jan-25 Vikram to verify
26 xxxx schedule steps to add pending
27 xxxx schedule steps to add
28 xxxx schedule steps to add
29
30 Vend 5 THRUSTER
31 ongoing Thruster Blocks -7,7A,13 &14 Readyness 10-Oct-24 completed
32 25-Apr-25 Thruster Foundation Machining 30 25-May-25
33 25-Apr-25 Hydraulic powerpack & lub oil installation 30 25-May-25 to complete before load out
34 25-Apr-25 Motor overhauling ( aft ps, fwd sb) & fix back in room 30 25-May-25
35 Ongoing Arrange initial inspection for Schottel 24-May-25
36 25-Apr-25 Thruster spares/ consummables to order 30 25-May-25
37 Load out done 26-May-25 taken from Sch-L1 (jacking system)
38 27-May-25 Thruster seal replacement 45 11-Jul-25
39 12-Jul-25 Thruster Installation 45 26-Aug-25
Motor to fix & associated works with cable pulling to
40 1-Aug-25 proceed 15-Sep-25
41
42 18-Mar-25 Thruster vfd spares procurement 150 15-Aug-25
Thruster vfd spares install by Siemens & vfd ready for pre- to be completed alongwith completion of
43 16-Aug-25 comm 30 15-Sep-25 thruster & motor installation
44
need further discussion after conclusion
45 thruster console (wheel house) with KME
46
Page 10 of 101
ongoing/ manual date date to note date in the past event to occur in 30 days 12/23/2024
Durati formula
ROW SL Start ACTIVITY on Link Status Completion Remarks Remarks Action check
82 6/3/2025 Equipment installation (incl cable pulling/ termination etc) 120 10/1/2025
83 10/2/2025 Commissioning 30 11/1/2025 reverse scheduling
84
85 Vend 7 Others pending
86 Hatches
87
Page 11 of 101
applicable now, to decide later on if local vendor cannot be used
Page 12 of 101
ongoing/ manual date date to note date in the past event to occur in 30 days 12/23/2024
Durati formula
ROW SL Start ACTIVITY on Link Status Completion Remarks Remarks Action check
3 key dates 2-Apr-25 SWBD room-Cable glanding and termination 45 Link 17-May-25 taken from "SchL1-3A"
Precom checks (continuity,megger) ( complete batch SWBD
4 18-May-25 Room ) 60 link 17-Jul-25 detailed breakup required pending
5 Comm 18-Jul-25 Hand over to comissioning ( complete batch SWBD Room ) 60 link 16-Sep-25 detailed breakup required pending
6
7 key dates Engine Readiness link 17-May-25 taken from "SchL1-2"
8 key dates Supply & Exhaust for the Room link 7-May-25 taken from "SchL1-2E" --
9 key dates Piping & Flushing completion link 2-Apr-25 taken from "SchL1-2D" --
10 18-May-25 Engine pre-Commissioning plan 30 link 17-Jun-25 detailed breakup required pending
11 18-Jun-25 Engine commissioning incl load test 30 link 18-Jul-25 detailed breakup required pending
12
13 key dates Jacking system Readiness link taken from "SchL1-4" pending
14
15
16
17 Overall start of commissioning link 17-May-25 taken from "SchL1-1D"
18 key dates 17-May-25 Commissioning start date 210 link 13-Dec-25 taken from "SchL1-1D"
19
20
Page 13 of 101
BUDGETING COST ESTIMATE
Overall Payments
Payments yet to do
120% $ 1
6 Husiman (no incl less cost booked 1.5M USD) $ 4,070,000 AED 14,936,900
7 Techcrane (balance + modification) $ 500,000 AED 1,835,000
350 Commissioning Costs (extracted from Aryan files) $ 700,000 AED 2,569,000
Logistics / Rental/ Custom clearance etc (taken from
351 Aryan file) $ 1,200,000 AED 4,404,000
AED
month spread in AED----
sum here sum here sum here sum here sum here
sum here sum here sum here sum here sum here
sum here sum here sum here sum here sum here
sum here sum here sum here sum here sum here
sum here sum here sum here sum here sum here
1 2 3 4 5
Tally
Monitor Jun-24 Jul-24 Aug-24 Sep-24 Oct-24
(AED)
0.00
0.00 - - - - -
0.00
0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00
0.00 7,100.53 43,885.86 - - 6,297.72
0.00 8,899.75 0.00 0.00 0.00 0.00
0.00 236,249.83
0.00
0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00
0.00 11,175.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 36,700.00
0.00
0.00
0.00 238,550.00
0.00
0.00
0.00 182,956.84
0.00 74,928.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 81,403.00 156,026.00 95,830.00
0.00
0.00
0.00 21,780.90 20,790.00 20,790.00 0.00 11,549.49
0.00 0.00 0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 424,944.02 917,844.86 116,356.00 0.00 790,125.04
0.00
0.00
0.00
0.00
5,665,951.52
0.00 26,000.00 115,252.00 172,504.00 172,504.00 172,504.00
0.00
0.00
0.00
5,665,951.52 26,000.00 115,252.00 172,504.00 172,504.00 172,504.00
0.00 450,944.02 1,033,096.86 288,860.00 172,504.00 962,629.04
0.00 66,060.00
0.00 95,420.00
0.00 13,410.55
0.00 45,508.00
0.00 330,300.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00 0.00 550,698.55
Oct-Jan 25,586,182
Finance
sum here sum here sum here sum here sum here sum here
sum here sum here sum here sum here sum here sum here
sum here sum here sum here sum here sum here sum here
sum here sum here sum here sum here sum here sum here
sum here sum here sum here sum here sum here sum here
6 7 8 9 10 11
3,734,225.00 3,734,225.00
367,000.00
58,918.33
23,781.60
72,666.00 74,868.00 72,666.00
73,400.00 73,400.00 73,400.00 73,400.00 47,000.00
348,796.80 348,796.80
54,976.60 82,464.90 27,488.30 82,464.90 27,488.30
18,350.00
303,876.00
183,500.00
122,064.20 488,256.80
24,222.00
63,467.51
27,544.05
18,350.00
37,140.40 37,140.40
95,940.00
807,400.00 1,614,800.00
330,300.00 172,134.00
1,026,132.00 2,394,308.00
55,508.00 63,461.00
120,018.00 250,000.00 250,000.00 129,982.00
52,260.00 52,260.00 322,960.00 322,960.00 322,960.00 322,960.00
156,250.25 218,750.35
79,272.00
73,400.00 660,600.00
38,535.00 346,815.00
70,364.91
86,023.33
226,278.23 226,278.23 226,278.23
150,000.00 150,000.00 150,000.00
12 13 14 15
6,721,605.00
1,468,000.00
298,921.20
47,000.00 47,000.00 47,000.00 47,000.00 47,000.00 47,000.00
174,398.40
303,876.00
56,518.00
95,201.27
37,984.50
16,515.00
954,200.00 73,400.00
310,115.00 23,855.00
12,000.90 28,002.10
64,269.45
5,651,800.00
1,009,250.00
308,280.00
1,056,960.00 2,466,240.00
550,500.00
220,200.00
367,000.00
281,837.06 281,837.06
13,267.97 3,269.97 192,392.41 0.00 119,263.99 49,801.90
0.00 0.00 0.00 0.00 0.00 0.00
385,350.00 385,350.00
660,600.00 660,600.00
37,617.50
- - - - - -
161,480.00
0.00 0.00 0.00 0.00 0.00 0.00
- - - - - -
0.00 0.00 0.00 0.00 0.00 0.00
746,845.00
191,500.00 11,000.00 - - - -
18,350.00
164,184.79
86,023.33
550,500.00 734,000.00
513,800.00
226,278.23
220,200.00 513,800.00
220,200.00 513,800.00
adjust
1,189,410.30
- - -
- - -
0.00 0.00 0.00
- - - - 745,572.79
18,350.00
616,560.00
4,349,887.18
250,000.40
2,142.00
367,000.00
0.00
156,000.00 156,000.00 2,362.18 7,826,322.67
3,875,153.00
3,737,340.83
5,400,001.30
13,043,830.00
0.00
86,626.00 -2,210,999.60
to be calculated again
to be calculated again
SL Start
1
A 30-Jun-24
30-Jun-24
8-Nov-24
8-Nov-24
8-Mar-25
B na
na
C na
D 19-Oct-25
E 19-May-26
F 27-May-26
G 12-Jun-26
H 27-Jun-26
A 21-Jul-25
20-Jun-25
1-Mar-25
Ongoing
Ongoing
Ongoing
Ongoing
16-Jul-24
6-Aug-24
9-Aug-24
16-Aug-24
23-Aug-24
Ongoing
11-Jul-24
16-Jul-24
22-Jul-24
4-Aug-24
15-Aug-24
28-Aug-24
8-Sep-24
21-Sep-24
2-Oct-24
15-Oct-24
26-Oct-24
5-Nov-24
8-Nov-24
24-Dec-24
24-Apr-25
9-May-25
13-May-25
18-May-25
29-May-25
4-Jun-25
9-Jun-25
14-Jun-25
D
1 26-Nov-24
26-Nov-24
26-Nov-24
2 26-Jan-25
3 8-Mar-25
8-Apr-25
29-Apr-25
9-Jun-25
15-Jun-25
28-Jun-25
9-Jul-25
14-Jul-25
2-May-25
2-May-25
13-May-25
13-May-25
24-May-25
30-May-25
12-Jun-25
23-Jun-25
28-Jun-25
30-Apr-25
10-Jun-25
15-Jun-25
17-Jun-25
22-Jun-25
16-May-25
6-Jun-25
12-Jun-25
18-Jun-25
24-Jun-25
2-Apr-25
2-Jun-25
10-Jun-25
21-Jun-25
7-Jul-25
26-Apr-25
6-Jun-25
16-Jun-25
25-Jun-25
6-Jul-25
22-Jul-25
E
19-Sep-25
21-May-25
11-Jun-25
Ongoing
G Ongoing
16-Apr-25
22-Apr-25
13-May-25
20-May-25
20-Jun-25
6-Jul-25
20-Mar-25
26-Mar-25
16-Apr-25
7-May-25
17-Jun-25
3-Jul-25
11-May-25
17-May-25
28-May-25
28-Jul-25
8-Aug-25
11-Aug-25
8-May-25
14-May-25
25-May-25
25-Jul-25
5-Aug-25
8-Aug-25
21-Apr-25
27-Apr-25
8-May-25
8-Jul-25
30-Jul-25
2-Aug-25
2-May-25
8-May-25
19-May-25
19-Jul-25
30-Jul-25
2-Aug-25
3
A 22-May-25
7-May-25
B 23-Mar-25
21-Jan-25
Ongoing
C 6-Jan-25
6-Dec-24
D Ongoing
E Ongoing
F Ongoing
G Ongoing
H 29-Apr-25
I 7-Dec-24
4
30-Jun-24
29-Oct-24
10-Nov-24
30-Jun-24
6-Dec-24
6-Jan-25
Vend 1
28-Feb-25
30-Apr-25
Ongoing
26-Jan-25
27-Apr-25
Vend 2
Ongoing
Ongoing
6-Feb-25
23-Apr-25
Yard
7-May-25
Yard
7-May-25
5-Jul-25
19-Sep-25
Comm 20-Aug-25
Comm 20-Oct-25
2-Jun-25
23-Jun-25
4-Jul-25
15-Jul-25
31-Jul-25
25-Nov-24
16-Dec-24
6-Jan-25
21-Feb-25
22-Jun-25
7-Jul-25
20-Jul-25
31-Jul-25
Ongoing
Ongoing
Ongoing
20-Oct-24
2-Nov-24
29-Nov-24
20-Dec-24
5-Jan-25
18-Jan-25
26-Jan-25
27-Dec-24
6-Jan-25
13-Mar-25
2-Apr-25
30-Jun-25
11-May-25
ongoing
DELETE
JACKING SYSTEM
SWBD
Engine room
ACTIVITY Duration
VESSEL COMPLETION
CABLE -HULL (Pay 20-May)- material delivery in yard 130
CABLE - ACC (Pay 20-May)- material delivery in yard 130
CABLE PULLING 390
CABLE TRAY INSTALLATION 120
CABLE TERMINATION 0
Equipment installtion- below main deck na
Engine readiness
Cable tray supports in SWBD room tank top area & ER Tank top area
All Pipe supports in SWBD room tank top area & ER Tank top area
All Eqmpt supports in SWBD room tank top area & ER Tank top area
All doubler supports in SWBD room tank top area & ER Tank top area
Balance hot work completion in SWBD room
Cable pulling in SWBD room tank top area & ER Tank top area 120
SWBD Installation 30
Cable glanding and termination 90
SWBD readiness
Cable glanding and termination 90
SWBD Installation 30
Install spares & required power checks 60
Spares identifying & ordering for SWBD & instrumentation 60
Engineering interfacing with KME
Cable pulling & dressing 120
Cable tray completion 30
Tank testing and paitning tank top ( FO & Coffer dam )
SWBD room readiness (hot work, insulation, ducting,& painting)
Piping completion (chilled water, Novec, drain)
FCU system readiness
Temp lighting & AC units 7
Procurement &False floor completion 150
SWBD readiness
Cable pulling & dressing 120
OEM AUSTEVOLL
OEM Gusto
NOVEC system
Engineering finalisation on the Technicals 20
PI drawing issuance and DNV approval submission 20
PO and Delivery of NOVEC piping items 45
Novec System- piping completion 120
Novec System- line walk 14
Novec System- pressure test 12
Novec System- reinstatement & Painting 10
Novec System- Hand over to comissioning 5
PO for NOVEC system ( Equivalent)
JACKING SYSTEM
Spud can readiness
Leg well
Jack house readiness
Jacking components OH/OEM insp completion
Leg section Lower weld on Supdcan (NPCC crane by 1 Nov 24) 12
Leg section Lower weld on Supdcan remain 70% weld completion 13
Leg LL with Spud install in Leg well (NPCC crane works compl by 28 Nov 24) 20
Jack house positioning on MD ( NPCC Crane ) 6
Leg middle section installation (each 30 % Weld ) 12
Leg middle section installation remain 70% weld completion 18
Jacking Frames positioning & assy incl GB ,mtrs,shc , Lcell 45
Cable tray installation ( jacking only ) in MD 9
Cable pulling from swbr to jacking motor & wheelhouse 60
Cable glanding and termination 60
Local control panels 20
Independent console technical details to be finalised with KME & Engg
Jacking console (wheel house) 30
Jacking Panels ( SWBR) & cable termination 60
THRUSTER
Thruster Blocks -7,7A,13 &14 Readyness
Thruster Foundation Machining 16
Hydraulic powerpack & lub oil installation 8
Motor overhauling ( aft ps, fwd sb)
Thruster seal replacement 30
thruster motor installation ( after loadout) 12
Motor installation (after loadout) 14
Fresh water cooling system( 98% work before loadout & 2% work after loadout)
Hydraulic & lube oil tubing (after loadout)
Ongoing
Assumed dates
Individual dates
Jacking System Readiness
Jacking systems
Jacking frame
Gear box
Jacking motor
load cell
Switch board room Panels (690)
Local Control Panels
28-Jun-26 46201.00
Link 20-Aug-25
Link 20-Aug-25
Link 20-Jul-25
Link 19-Jun-25
Link Costing allocation
Unlinked 10-Jul-24
Unlinked 15-Jul-24
9-Aug-24
5-Aug-24
8-Aug-24
15-Aug-24
22-Aug-24
27-Aug-24
7-Nov-24
11-Aug-24
11-Aug-24
11-Aug-24
11-Aug-24
24-Oct-24
7-Nov-24
23-Dec-24
23-Apr-25
24-May-25
7-Aug-25
20-Aug-25
20-Aug-25
20-Aug-25
20-Aug-25
Link 21-Jun-25
Link 17-May-25
28-May-25
3-Jun-25
8-Jun-25
13-Jun-25
21-Jun-25
Link 21-Jul-25 detailed breakup required sitaram
21-Jul-25
25-Jan-25
25-Jan-25
25-Jan-25
7-Mar-25
7-Apr-25
28-Apr-25
8-Jun-25
14-Jun-25
27-Jun-25
8-Jul-25
13-Jul-25
21-Jul-25
12-May-25
12-May-25
23-May-25
23-May-25
29-May-25
11-Jun-25
22-Jun-25
27-Jun-25
5-Jul-25
9-Jun-25
14-Jun-25
16-Jun-25
21-Jun-25
26-Jun-25
5-Jun-25
11-Jun-25
17-Jun-25
23-Jun-25
1-Jul-25
1-Jun-25
9-Jun-25
20-Jun-25
6-Jul-25
11-Jul-25
5-Jun-25
15-Jun-25
24-Jun-25
5-Jul-25
11-Jul-25
Link 9-Oct-25
Link 9-Oct-25
Link 18-Sep-25
Link 9-Oct-25 detailed breakup required sai
20-Aug-25
21-Apr-25
12-May-25
19-May-25
19-Jun-25
5-Jul-25
20-Aug-25
17-Aug-25
25-Mar-25
15-Apr-25
6-May-25
16-Jun-25
2-Jul-25
17-Aug-25
14-Aug-25
16-May-25
27-May-25
27-Jul-25
7-Aug-25
10-Aug-25
14-Aug-25
11-Aug-25
13-May-25
24-May-25
24-Jul-25
4-Aug-25
7-Aug-25
11-Aug-25
5-Aug-25
26-Apr-25
7-May-25
7-Jul-25
29-Jul-25
1-Aug-25
5-Aug-25
5-Aug-25
7-May-25
18-May-25
18-Jul-25
29-Jul-25
1-Aug-25
5-Aug-25
completed
completed
#REF!
28-Oct-24
28-Oct-24
8-Nov-24
1-Dec-24
7-Nov-24 info only
4-Feb-25
Link
Link 6-May-25
29-Apr-25
Unlinked 7-May-25
25-Jan-25
26-Apr-25
Unlinked 7-May-25
22-Apr-25
7-May-25
7-May-25
Unlinked 7-May-25
18-Sep-25
Unlinked 19-Oct-25
19-Oct-25
20-Oct-25
22-Jun-25
3-Jul-25
14-Jul-25
30-Jul-25
5-Aug-25
15-Dec-24
5-Jan-25
20-Feb-25
21-Jun-25
6-Jul-25
19-Jul-25
30-Jul-25
5-Aug-25
Indpt
List of cables in SWBD room and status
10-Oct-24
15-Sep-24
10-Aug-24
Details in Comm list
1-Nov-24 (crane moves after 30% Weld )
15-Nov-24 weld completion
19-Dec-24
26-Dec-24
17-Jan-25 Crane req duration only
5-Feb-25 leg completion Middle leg
12-Mar-25
5-Jan-25
7-Mar-25
12-May-25
22-Apr-25
30-Jul-25
10-Jul-25
15-Sep-24
5-Aug-24
5-Aug-24
1-May-24 DELETE
SL DISCIPLINE Start ACTIVITY Duration
1 STRUCTURE 20-Aug-24 LEG SECTION (PAY 20 MAY)
2 STRUCTURE SPUDCAN
3 STRUCTURE HELIDECK
4 STRUCTURE CRANE PEDESTAL
5 PIPING NOVEC
6 PIPING HELIDECK FOAM
7 PIPING LEG JETTING
8 PIPING BRINE
9 PIPING FRESH WATER
10 PIPING FUEL OIL
11 PIPING SEA WATER
12 PIPING BALLAST SYSTEM
13 PIPING TANK GAUGING + SOUNDING
14 PIPING PIPE FITTINGS
15 MECHANICAL 15-Jun-24 MAIN CRANE (Pay 15-June)
16 MECHANICAL 15-Jul-24 AUX CRANE(Pay 15-July)
17 MECHANICAL 15-Jun-24 NOVAC SYSTEM (Pay 15-june)
18 MECHANICAL 15-Jan-25 HOSE REEL (Pay 15-July)
19 MECHANICAL 15-Jan-25 ANCHOR WINCH (Pay 15-Aug)
20 MECHANICAL LIFE RAFT
21 MECHANICAL WORKSHOP ITEMS
A VESSEL COMPLETION
22 E&I 30-Jun-24 CABLE -HULL (Pay 20-May)- material delivery in y 130
23 E&I 30-Jun-24 CABLE - ACC (Pay 20-May)- material delivery in y 130
24 E&I 8-Nov-24 CABLE PULLING 390
E&I 8-Nov-24 CABLE TRAY INSTALLATION 120
E&I 8-Mar-25 CABLE TERMINATION 0
Mechanical na Equipment installtion- below main deck na
Mechanical na Equipment installtion- above main deck na
Piping na Completion of piping na
Commissioning 19-Oct-25 Commissioning 210
63 Commissioning 19-May-26 INCLINATION TEST 7
65 Commissioning 27-May-26 Sea Trials- with DP 15
66 Commissioning 12-Jun-26 Punch List clerance 15
68 Vahana 27-Jun-26 Sail Away 1
TARGETED DATE
DELIVERY
30-Mar-25 DELIVERY
28-Feb-25 DELIVERY
15-Dec-24 DELIVERY
15-Jan-25 DELIVERY
15-Jan-25 DELIVERY
DELIVERY
DELIVERY
unlink
unlink 7-Nov-24 DELIVERY -75%; 140 km
link 7-Nov-24 DELIVERY -90%; 40 KM
unlink 3-Dec-25 Manpower planning to be done
link 8-Mar-25
link 17-Jan-26 detailed breakup required
link 20-Aug-25 detailed breakup required paramesh 150 days before cable termination
link 19-Sep-25 detailed breakup required paramesh 120 days before cable termination
link 19-Oct-25 detailed breakup required sitaram 90 days before cable termination
link 17-May-26
link 26-May-26
link 11-Jun-26
link 27-Jun-26
link 28-Jun-26
0.00
21-Nov-24 20-Apr-25
DELIVERY 20-Aug-24
15-Dec-24 DELIVERY
28-Oct-24 DELIVERY
28-Oct-24 DELIVERY
DELIVERY
DELIVERY
DELIVERY
DELIVERY
DELIVERY
30-Dec-99 29-Apr-00
DELIVERY 30-Mar-25
DELIVERY
DELIVERY
DELIVERY
DELIVERY
DELIVERY
DELIVERY
30-Nov-24
4-Oct-24
1-Nov-24
26-Nov-24
26-Nov-24
26-Nov-24
26-Nov-24
26-Nov-24
Start Days End Status
CRITICAL DATE CRITICALITY
12-May-25 CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
CRITICAL
NON CRITICAL
CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
7-May-25 CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
NON CRITICAL
NON CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
20-Apr-25 CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
CRITICAL
NON CRITICAL
NON CRITICAL
30 29-May-00 CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
30-Mar-25 CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
30-Nov-24 CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
CRITICAL
NON CRITICAL
NON CRITICAL
NON CRITICAL
CRITICAL
120 19-May-99 CRITICAL
120 19-May-99 CRITICAL
30 16-Sep-99 CRITICAL
60 18-Jun-99 CRITICAL
90 17-Aug-99 CRITICAL
30 15-Nov-99 CRITICAL
240 16-Oct-99 CRITICAL
7 22-May-00 CRITICAL
15 29-May-00 CRITICAL
150 13-Feb-00 CRITICAL
30 13-Jun-00 CRITICAL
0 6-Jul-00 CRITICAL
7 6-Jul-00 CRITICAL
45 13-Jul-00 CRITICAL
14-May-00
BUDGETING COST ESTIMATE
120% $ 1
30 Husiman (no incl less cost booked 1.5M USD) USD 4,070,000 AED 14,936,900
31 Accomodation Works including HVAC (SaiKiran's file) USD 6,247,912 AED 22,929,837
32 HAVC Units upgradation (included above) USD 0 AED 0
33 Engineering Sub con (mod + Acco ) included above AED 0
34 Engineering Sub con (OEDEC) USD 325,800 AED 1,195,686
35 DNV GL - Account payable USD 0 AED 0
36 DNV GL - ( Engg Approvals ) USD 60,000 AED 220,200
37 DNV GL - Survey USD 200,000 AED 734,000
38 SOLAS - Nav Aid USD 237,600 AED 871,992
39 SOLAS - Helideck USD 74,900 AED 274,883
40 SOLAS - Helideck Foam USD 5,000 AED 18,350
41 SOLAS - H lighting USD 165,600 AED 607,752
93 Helideck items USD 50,000 AED 183,500
42 Sys Dyn - Mooring items USD 207,000 AED 759,690
43 Amateurn Wolf - Valves USD 26,142 AED 95,940
44 New steel materials - Spudcan USD 300,000 AED 1,101,000
45 Additional leg sect 9.8 meter ( Aryan cost) USD 1,100,000 AED 4,037,000
46 Sub-con - Oasis Metals USD 6,540 AED 24,000
47 Sub-Con - Galvanizing USD 98,093 AED 360,000
48 Sub-Con - Ferro gate USD 39,237 AED 144,000
49 Roxtec MCT USD 50,000 AED 183,500
50 Solas - Fire supression (Novec) USD 158,583 AED 582,000
51a Cables USD 700,000 AED 2,569,000
51b Cables -Variation Order USD 350,000 AED 1,284,500
52 Telecom Cables USD 40,000 AED 146,800
53 Cable glands USD 120,000 AED 440,400
54 Cable trays (remaining qty) USD 30,000 AED 110,100
55 Cable trays - SS USD 21,000 AED 77,070
56 JB , DB USD 200,000 AED 734,000
57 Receptacles (shaksy) USD 105,000 AED 385,350
58 Oman abrasives USD 915,531 AED 3,360,000
59 Hatches (Sys dynamics ) USD 90,000 AED 330,300
60 Arab cal ( precession instruments ) USD 27,248 AED 100,000
61 Tensosys USD 10,000 AED 36,700
62 Welding Consumables USD 59,025 AED 216,623
63 Loadout vendor USD 2,200,000 AED 8,074,000
64 Techcrane (balance + modification) USD 500,000 AED 1,835,000
65 Chock fasting (Goltens ) USD 21,798 AED 80,000
66 Auto Greasing System USD 280,000 AED 1,027,600
67 H2 S system ( 220 men ) USD 960,000 AED 3,523,200
68 Spares for vessel ( Basic operations ) USD 500,000 AED 1,835,000
69 Bostek, Norway ( old payables ) USD 0 AED 0
70 Tulsa Power / Reel-O-Matic, USA USD 0 AED 0
71 Submersible Pumps & Hose reel USD 400,000 AED 1,468,000
72 PAGA Systems USD 125,000 AED 458,750
73 ALU Tech - Wheelehouse Chair USD 10,000 AED 36,700
74 Inelteh D.O.O. - Lighting columns USD 14,500 AED 53,215
75 Cathelco Middle East USD 10,900 AED 40,003
76 Gates Engineering USD 46,797 AED 171,747
77 Rubber Design BV USD 23,005 AED 84,427
78 Rubber Design BV
79 Life rafts - taken to Aryan ( 8 Nos ) USD 22,000 AED 80,740
80 LSA / FFA items USD 43,234 AED 158,670
81 Workshop items USD 25,017 AED 91,814
82 UPS USD 63,910 AED 234,550
83a Oil /Lubricants / consumables USD 170,300 AED 625,000
83b Oil for Jacking gearbox USD 21,600 AED 79,272
84 BWMS ( Ballast water management ) USD 200,000 AED 734,000
85 Painting consumables ( Paint & CS ) USD 1,430,654 AED 5,250,500
86 Gap Analysis (DNV GL + Aries Marine ) USD 18,000 AED 66,060
87 MWS + Weather forecast USD 200,000 AED 734,000
88 Spud can top plate bending USD 4,000 AED 14,680
89 OH valves testing USD 10,000 AED 36,700
90 Pipe & Pipe Fittings USD 13,000 AED 47,710
91 Main crane pedestal ring plate bending USD 10,354 AED 38,000
92 Crane hire ( Spud on LL ) USD 200,000 AED 734,000
94 OB cooling water ( EPC) USD 10,000 AED 36,700
95 Hardox - machining USD 3,000 AED 11,010
96 Generator Hiring (incl cables) USD 50,000 AED 183,500
300 MR Done - PO not done USD 4,161,042 AED 15,271,024
301 MR Not Done - PO not done - Aryan ref USD 1,307,902 AED 4,800,000
301A Proc Yard - Yard (Maalans file) USD 0 AED 0
AED
Month Value in AED
Jun-24 707,082
Jul-24 1,839,269
Aug-24 653,720
Sep-24 373,008
Oct-24 10,943,994
Nov-24 3,374,809
Dec-24 12,195,696
Jan-25 22,843,437
Feb-25 34,001,283
Mar-25 25,885,784
Apr-25 8,182,144
May-25 43,993,312
Jun-25 18,636,045
Jul-25 23,654,616
Aug-25 17,131,402
Overall AED224,415,599
0
0
0
0
0 170,655.00
0 0.00 0.00 0.00 0.00 0.00
0
0 236,250.00
0
0
0 3,734,225.00
0 0.00 0.00 0.00 0.00 409,000.00
0
0
0 239,137.20
0 0.00
0
0 48,933.33
0
0
0
0
0
0 18,992.25
0
0 503,000.00 95,566.00
0
0
0 14,000.00 7,500.00
0
0 64,531.00
0
0 238,550.00
0
0
0
0 182,957.00
0 74,928.00
0
0
0 26,130.00 26,130.00
0
0
0 36,700.00
0 91,300.00 31,000.00
0
0
0
0
0
0
0 0.00 0.00
0 0.00 0.00 0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 30,595.00 120,018.00
0 11,175.00 11,175.00
0
0 16,704.00
0
0 47,710.00
0 38,000.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0 21,780.90 24,412.29 20,790.00 0.00 7,927.20
0 0.00 0.00 0.00 0.00 0.00
0
0
0
0
0
1 327,540.90 804,382.29 154,356.00 14,000.00 5,299,492.98
0
0
0 26,000.00 115,252.00 172,504.00 172,504.00 172,504.00
0
0
0
5,665,952 26,000.00 115,252.00 172,504.00 172,504.00 172,504.00
Jan-Dec 30,087,577
Finance
Cah outflo
50,000,000
1,283
45,000,000
Cah outflo
50,000,000
34,001,283
45,000,000
40,000,000
12,195,696
35,000,000
25,885,784
25,804,284
22,843,437
30,000,000
653,720
10,943,994
373,008
25,000,000
3,374,809
707,082
20,000,000
1,839,269
15,000,000
10,000,000
5,000,000
0
Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-2
6 7 8 9 10 11
1,468,000.00 1,468,000.00
367,000.00 367,000.00 734,000.00
321,125.00 64,225.00 64,225.00
342,804.79 342,804.79 342,804.79 342,804.79
113,770.00 284,425.00
0.00 0.00 0.00 0.00 302,752.98 0.00
1,458,825.00 1,458,825.00 1,458,825.00 1,458,825.00
236,250.00 236,250.00 236,250.00
256,900.00
60,555.00 45,416.25 45,416.25
3,734,225.00
375,000.00 104,000.00 543,500.00 116,000.00 1,168,000.00 2,733,000.00
358,705.80 298,921.50
170,930.25
95,940.00
330,300.00 172,134.00
807,400.00
12,000.00 12,000.00
18,000.00 7,500.00 36,000.00 36,000.00 7,000.00 36,000.00
28,800.00 28,800.00 28,800.00
55,508.00 63,461.00
116,400.00 465,600.00
256,900.00 2,073,550.00
128,450.00 1,156,050.00
14,680.00 132,120.00
57,252.00 383,148.00
73,400.00 660,600.00
38,535.00 346,815.00
78,390.00 52,260.00 336,000.00 336,000.00 336,000.00 336,000.00
49,545.00 49,545.00
18,350.00
26,607.50
8,442.72
24,222.00
63,468.00
27,544.05
156,250.00 218,750.00
79,272.00
513,800.00
250,000.00 250,000.00 250,000.00
47,742.00
367,000.00
0.00
11,010.00
3,054,204.83 3,054,204.83 3,054,204.83 3,054,204.83
960,000.00 960,000.00 960,000.00 960,000.00
AED9,000,000 AED9,000,000
5,625,191 -3,195,696
43,993,312
25,885,784
25,804,284
22,843,437
17,131,402
23,654,616
18,636,045
6,721,605.00
2,261,500.00 1,233,000.00 3,420,000.00 1,126,000.00 1,821,000.00 1,537,000.00
298,921.50
303,876.00
569,767.50
3,229,600.00
36,000.00 162,000.00
28,800.00 28,800.00
336,000.00 336,000.00 336,000.00 638,400.00 186,690.00
231,210.00
100,000.00
1,614,800.00 5,651,800.00
1,468,000.00
308,280.00 719,320.00
1,056,960.00 2,466,240.00
550,500.00 1,284,500.00
0.00
293,600.00
56,518.00
64,269.45
3,054,204.83
960,000.00
1,080,000.00
288,306.30
13,267.97 64,008.47 56,785.91 137,371.77 9,163.99 159,901.90
0.00 0.00 0.00 0.00 0.00 0.00
220,200.00 513,800.00
110,100.00 256,900.00
746,845.00
3,406,000.00 1,656,000.00 11,000.00 11,000.00 180,500.00 5,500.00
48,933.33 48,933.33
0.00 11,446.73 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
183,500.00
-72,857.00
2,142.00
-54,156.00
587,200.00
458,750.00
18,350.00
26,607.50
40,003.00
171,746.82
75,984.00
0.00
95,202.00
0.00
234,549.70
250,000.00
0.00
220,200.00
4,349,887.00
-4,032.00
367,000.00
-2,024.00
36,700.00
0.00
0.00
734,000.00
36,700.00
183,500.00
0.00 0.00 0.00
0.00 0.00 0.00
-1,284,500.00
5,500.00 27,500.00 0.00 7,434,290.06
13,043,830.00
0.00
86,626.00 -2,211,000.00