QA/Qc - Checklist Sewer Line

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

CHECKLIST Doc. No.

:
Rev No.:
SEWER LINE Rev Date:
Page No. -1- of

PROJECT LOCATION : DATE :


SUB LOCATION:
DRAWING NO.
Name of Contractor:
YES NO
1 Are SW pipes laid as per designed slope and layout
2 Check for appropriate dia. of SW pipes.
3 Check for proper sealing of joints.
4 Check for minimum encasing of c.c done all around.
5 Check that inspection chambers are plastered externally and internally.
6 Is smoke/water test done?
7 Changes as per site condition/marked AS Built
Excavation as per required size, width, depth, shop drawing prepared and
8 approved
SAFETY CHECKS
1 Check that personnel working for sewer line are with appropriate PPE's.
2 Check MSDS of the Sealent in use.
3 Check that excavated area is barricaded
4 Check that no electrical cable is within the sewer line.
5 Check for work permit if sewer line work is in confined space.
Any Comments / Remarks :

Engineer Engineer MEP


CORRECTIVE ACTION IMPLEMENTED BY SITE,IF ANY

Engineer Engineer MEP


VERIFIED

QCE
N.A