PROJECT : ONE WILSON SQUARE
LOCATION : Wilson St. Cor. Ortigas Ave., Greenhills San Juan City          DATE : FEBRUARY 09, 2018
SUBJECT     : TURN OVER OF KEYS @ 9th floor unit A2, B, C, D, E1, F2       OWS -        OO3
                               MASTER                        MASTER UTILITY
FLOOR / MAIN DOOR           BEDROOM KEY BEDROOM   COMMON T&B    KEY ROOM REMARKS
  UNIT   KEY NO.                         KEY NO. T&B KEY NO.
                                NO.                           NO.   KEY NO.
  8F-C          43545           334646         516636        3344725     334673     242115    13PCS
                                     ***NOTHINGS FOLLOW***
Prepared by:                                              Received by:
ENGR. JAYRINE AQUINO
Turn-over engineer                                            Signature over printed name
Noted by:
ENGR. ERIC I. ABUTAR
Project manager
PROJECT : ONE WILSON SQUARE
LOCATION : Wilson St. Cor. Ortigas Ave., Greenhills San Juan City          DATE : NOVEMBR 27, 2017
SUBJECT     : TURN OVER OF KEYS @ 8th floor unit A2, E1, F2, J1            OWS -        OO2
                               MASTER                        MASTER UTILITY
FLOOR / MAIN DOOR           BEDROOM KEY BEDROOM   COMMON T&B    KEY ROOM REMARKS
  UNIT   KEY NO.                         KEY NO. T&B KEY NO.
                                NO.                           NO.   KEY NO.
 8F-A2          52112           334624                       511266                           1PAIR
  8F-E1         45245           241574                       242454                           1PAIR
  8F-F2         51236           237643                       516742                           1PAIR
  8F-J1         15452           523355                       477513                           1PAIR
                                   * * *NOTHINGS FOLLOW * * *
Prepared by:                                              Received by:
ENGR. JAYRINE A. AQUINO                                       Signature over printed name
Noted by:
ERIC I ABUTAR
38th floor unplaster wall Electrical room   38th floor auxilliary room
37th floor uplaster wall METER ROOM         36th Floor unfinish at door jamb METER R
33rd floor inc chb laying METER ROOM   33RD FLOOR no topping at flooring AUXIL
33RD FLOORunfinish plaster of wall ELECT. ROOM   32ND floor no topping Electrical room
31ST FLOOR unfinish firehost cabinet             31st floor unfinish plaster of wall ELECT. R
29TH FLOOR unfinish plastering ELECTRICAL ROOM   27TH FLOOR cutting of steel bar
unplaster wall 23rd AUXILLIARY ROOM   rectify damage
22nd floor not quality plaster        21st floor unfinish work
19TH FLOOR unplaster wall AUXILLIARY ROOM   19TH UNTOPPING OF FLOORIG AUXILLIAR
r auxilliary room                    36th floor untopping of flooring AUX ROOM
                                     35th unfinish work ELECTRICAL ROOM
r unfinish at door jamb METER ROOM
OOR no topping at flooring AUXILLIARY RM   32nd unfinished work of firehost cabinet
or no topping Electrical room           31ST FLOOR unfinish firehost cabinet and jamb
                                        perimeter of meter room
 unfinish plaster of wall ELECT. ROOM   26th floor unplaster work METER ROOM
OR cutting of steel bar   26TH FLOOR UNTOPPING WORK ELECTRICAL ROOM
                  rectify   21st floor
r unfinish work   20th floor unfinish work ELECTRICAL ROOM
TOPPING OF FLOORIG AUXILLIARY ROOM
35th floor unfinish work at door jamb METER ROOM
34th unfinish work at door jamb METER ROOM
32nd floor unfinish plaster of wall METER ROOM
31st floor unfinish work, unplaster AUX ROOM
26TH FLLOR UNTOPPING WORK METER ROOM
rectify damage
rectify
20TH FLOOR unfinish work METER ROOM
For approval
     Sample of DYNA BOLT
       Φ16mmx100mm
          STANDARD
By: C-E CONSTRUCTION
ONE WILSON SQUARE
For approval
     Sample of Steel Plate
       300mm diameter
          100mm thk
By: C-E CONSTRUCTION
ONE WILSON SQUARE