APPROVED CHECKED PREPARED
NAMA Miftah Zarkasi
NIM 4.162E+10 PROCESS FLOW DIAGRAM
Simon MS Widada Usep
CUSTOMER : PT PERTAMINA SUPPLIER NAME : PT . UTPE PROCESS : Fabrication Tank PFD FORM :
PART NUMBER :- REV : PART DESCRIPTION : Modular Tank 23 kl MATERIAL : - REVISION :0
NO DESCRIPTION OF ACTIVITIES PROCEDURE OR SPECIFICATION FORM REVISION DATE
Operation Measure Decision Storage Delay Transport
Get Material Plate :
- Plate for Body Skin, t : 6 mm Record heat & coil number.
- Plate for Dishend, t : 6 mm Refer to Material Traceability Report
- Sq tube for Frame
Move plate to Plasma cutting machine
Move sq tube to Band saw machine
Plasma Cutting Process use material preparation data sheet
Band saw process
Check component dimension use roll meter
NG Dimensional no good : reject, good : next process
Reject
G
Move to roll machine
Rolling process use material preparation data sheet
Check component dimension use roll meter
NG
Reject Dimensional no good : reject, good : next process
G
Move to fabrication line
Process welding skin body use welding map & fabrication data sheet (lpf)
Process welding circular body
Process welding dish end to skin body
process welding frame
Check dimension & concentricity use roll meter
Checking welding line see NDT map
NG
Dimensional & welding no good : repair good : next process use equipment for NDT test
G
Process setting & welding pipe use welding map & fabrication data sheet (lpf)
Process setting & welding frame
Process setting & welding ladder
Check dimension & welding line use roll meter & NDT map
NG
Dimensional & welding no good : Repair, good : next process use equipment for NDT test
G
Air pressure testing see Air Pressure Test procedure
Leakage : repair, good : next process
G
Hydrostatic testing see Hydroststic Test procedure
Leakage : repair, good : next process
NG
G
Move to painting line
Process blasting
Checking depth profil of plate use roughness comparator
checking SA of rush grade
NG
Roughness no good : repair, good : next process
G
Process primer
Process top coat
Checking thickness & visual of paint use thickness & gloss meter
Thickness & Visual no good : repair, good : next process
Move to Assembling Area
Assembling piping assy
Checking the completeness of component
Checking piping connection
NG
No Good : re-setting, Good : next process
G
Move to testing Area
APPROVED CHECKED PREPARED
PROCESS FLOW
PROCESS
PROCESS FLOWDIAGRAM
FLOW DIAGRAM
DIAGRAM
Simon MS Widada Usep
CUSTOMER : PT PERTAMINA SUPPLIER NAME : PT . UTPE PROCESS : Module Tank PFD FORM :
PART NUMBER :- REV : PART DESCRIPTION : Modular Tank 23 kl MATERIAL : - REVISION :0
NO DESCRIPTION OF ACTIVITIES PROCEDURE OR SPECIFICATION FORM REVISION DATE
Operation Measure Decision Storage Delay Transport
Get Component :
- Pump Refer to Assembling data sheet (LPA)
- Pipe, hose & connection
- Filter, etc
Move to Assembling Area
Assembling component to module housing Refer to Assembling data sheet (LPA)
Assembling pipe & connection
Check component connection
NG Connection no good : repair, good : next process
G
Testing module function
Leakage : re-setting, good : next process
connect to tank
Functional test
NG
Leakage or disfunction : re-setting, good : next process
G
Move to painting area
Process primer
Process top coat
Checking thickness & visual of paint
Thickness & Visual no good : repair, good : next process
RFD