0% found this document useful (0 votes)
231 views22 pages

Shift Charge Engineer's Log Book: Shift Beginning Status Main Plant Unit # 1 Unit # 2

The log book provides status information for various plant systems and units at the beginning and end of the shift. At shift start, the main items noted include generation levels for Unit 1 and 2, vacuum and load levels, coal and air flows, steam temperatures, and the status of mills, pumps and fans. Exceptions on metal temperatures, ash utilization and draft control are also listed. The shift activities describe soot blowing, equipment checks, and maintenance done. The shift end notes the generation, consumption levels and status of systems like ESP, mills and steam temperatures on both units.

Uploaded by

mkoelreal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
231 views22 pages

Shift Charge Engineer's Log Book: Shift Beginning Status Main Plant Unit # 1 Unit # 2

The log book provides status information for various plant systems and units at the beginning and end of the shift. At shift start, the main items noted include generation levels for Unit 1 and 2, vacuum and load levels, coal and air flows, steam temperatures, and the status of mills, pumps and fans. Exceptions on metal temperatures, ash utilization and draft control are also listed. The shift activities describe soot blowing, equipment checks, and maintenance done. The shift end notes the generation, consumption levels and status of systems like ESP, mills and steam temperatures on both units.

Uploaded by

mkoelreal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 22

Shift Charge Engineer's Log Book

Date - Shift - Group -


Shift Beginning Status

Main Plant Unit # 1 Unit # 2

CMC / FGMO(RGMO)

Load (MW / MVAR)

Vacuum (Kg/Cm2)

Coal / Air

O2 / Burner Tilt

Mills in Service

Drum Pr / Th Pr / 1st Stage Pr

Steam Temperature (SH / RH)

Attemperation Flow (SH / RH)

Maxm Metal Temp (SH / RH)

H2 Pr (Kg/Cm2) / H2 Purity (%)

Maxm TG Vibration (Shaft / Brg)

Clinker Grinder Status (I/S / Available)

Last Bottom De-Ashing Done

ESP Fields Not Available

CT Pump / CPU I/S

CBD / SiO2 / pH

APRDS (Pr / HTemp / LTemp)

Eco Hopper Status 1- 2- 3- 4- 1- 2- 3- 4-

Major Auxiliary Not Available

Major Protection Bypassed


Major Protection Bypassed
Shift Charge Engineer's Log Book

Date - Shift - Group -


Shift Beginning Status

Switch Yard

400 KV Bus Volts (kV) / Frequency

Unit - 1/2 Loads (MW)

ST - 1/2 Loads (MW)

400KV 1/2 Line Loads (MW)

400/132/33 KV ICT Load (MW)

Bus Reactor Status (Amps/MVAR)

Reservoir Pump House

Chettipalli Res Transf Pumps I/S

PT Make-upmPumps (IS/Pr)

Ash Water Make-Up Pumps (IS/Pr)

Reservoir Level (1 / 2)

Offsite Pumps

Ash Water R/C Pumps (IS/Pr/Amp/Lvl)

DM Plant Status (Stream A/B/C)

ECS Skid A/B/C Status

Major Offsite Equipments


Not Available

ASH HANDLING PLANT STATUS

Field Status Unit # 1 Unit # 2

Short Fields

Ash Level High

Others

Coal / Air

Ash Evacuation System Unit # 1 Unit # 2

ESP Vac PP I/S


ESP Strams in Dry Mode

Bottom Ash O/F Pump

Slurry Pump Series I/S

BAHP IS / FAHP I/S

BALP IS / FWP I/S

Seal Water Pump I/S (LP / HP)

TAC IS / MRC I/S

IAC I/S
Unit # 2

Unit # 2
Shift Charge Engineer's Log Book

Date - Shift - Group -


Shift Beginning Status

A B C D A B C D
BUNKER LEVELS (IN MTS)
E F G H E F G H

Fire Water PH

Fire Water Tank Level (1/2)

Hydrant or Spray Pumps (IS/Pr/Amp)

Diesel Pumps Status (Hyd/Spr)

Jockey Pumps (IS / Pr)

Booster Pump I/S

Fire Water Pressure (Highest Point)

Fuel Oil PH

HFO Forw. Pumps (IS/Pr/Fltr DP)

LDO Forw. Pumps (IS/Pr/Fltr DP)

HFO Heater (IS/Stm Temp/Oil Temp)

HFO Cooler I/S

HFO Tank Level (Tank-1/Tank-2)

LDO Tank Level (Tank-1/Tank-2)

Drain Oil Tank Levels (Forw/UL)

Circulating Water PH

CW Pump in Service PP-1A PP-1B PP-2A PP-2B

CW Pump Discharge Pressure PP-1A PP-1B PP-2A PP-2B

CW Pump Load (Amps) PP-1A PP-1B PP-2A PP-2B

CW Pump Vibrations (max.) PP-1A PP-1B PP-2A PP-2B

Seal/Lube Water Pumps I/S

Forebay Level (in Meters)

Cooling Tower-1A CT Fan Status 1 2 3 4 5 6 7 8 9 10 11

Cooling Tower-1B CT Fan Status 1 2 3 4 5 6 7 8 9 10 11


Cooling Tower-2A CT Fan Status 1 2 3 4 5 6 7 8 9 10 11

Cooling Tower-2B CT Fan Status 1 2 3 4 5 6 7 8 9 10 11

SACW pump I/S CT Fans I/S 1 2 3

ACW Pumps I/S

IAC (IS/Pr/Amp)

SAC (IS/Pr/Amp)
Shift Charge Engineer's Log Book

Date - Shift - Group -


Shift Acitivies:

Time Description
Unit Charge Engineer's Log Book

Date - Shift - Group -


Shift Acitivies:

Time Description
Shift Charge Engineer's Log Book

Date - Shift - Group -


Shift Acitivies:

Time Description
Shift Charge Engineer's Log Book

Date - Shift - Group -


Exceptions Particulars Reason

SH & RH Metal Temp Excursion

ABT Exceptions

Ash Utilization Exceptions

DC Shift Start Shift End


DC (MW)

AG/DC (%)
Shift End Particulars
Main Plant Unit # 1 Unit # 2
Generation (MU)

Aux Power Consum. (Gen - Exp)

Coal Consumption (Ton)

Oil Consumption-LDO/HFO (KL)

DM Water Consumption (Ton)

Hydrogen Consumption(Nos)

Dry Ash Sent Out (Vehicles Nos)

Reason for Low Generation

Shift Activities
Main Plant Unit # 1 Unit # 2

Bottom Ash De-Ashing (CG/Time)

Eco Hopper Status 1- 2- 3- 4- 1- 2- 3- 4-

APH Soot Blowing Done APH-A: APH-B: APH-A: APH-B:


Water Wall Soot Blowing
(Prog/Nos Optd)

LRSB Operated

Centrifuges in Service MOT: TD-A: TD-B: MOT: TD-A: TD-B:

Scheduled Changeover

Emergency Equipment Checked

DG Set Trial Run (Voltage/Freq)


Shift Charge Engineer's Log Book

Date - Shift - Group -


Shift End Status
Ash Evac System Unit # 1 Unit # 2

ESP WU / Vac PP IS

ESP Hoppers (Level High)

ESP Streams in Dry Mode

D Pumps in Operation

Particulars Unit # 1 Unit # 2


Load (MW / MVAR)

Vacuum (mmWC)

H2 Pr (Kg/Cm2) / H2 Purity (%)

Mills in Service

Mills Under PTW

Drum Pr / SiO2 / pH

Steam Temperature (SH / RH)

Attemperation Flow (SH / RH)

Maxm SH Metal Temp

Maxm RH Metal Temp


Particulars BOP
Fire Water Level (Tank-1/Tank-2)

LDO Tank Level (Tank-1/Tank-2)

HFO Tank Level (Tank-1/Tank-2)

Information / Instructions:

Signature:

Name:

You might also like