FORM 1 [see Regulation 3]
ARCHITECT'S CERTIFICATE
(To be submitted at the time of Registration of Ongoing Project and for
withdrawal of Money from Designated Account)
Date :
To
The ________________ (Name & Address of Promoter),
Subject : Certificate of Percentage of Completion of Construction Work of
___________ No. of Building(s)/______ Wing(s) of the ______ Phase of the Project
[MahaRERA Registration Number] situated on the Plot bearing C.N. No/CTS
No./Survey no./ Final Plot no _________ demarcated by its boundaries (latitude and
longitude of the end points) ______to the North____to the South _____to
the East _____to the West of Division __________ village _____________ taluka
________________ District ___________ PIN_________admeasuring ________sq.mts.
area being developed by
Sir,
I/ We________________ have undertaken assignment as Architect /Licensed Surveyor of
Certifying Percentage of Completion of Construction Work of the
___________Building(s)/________Wing(s) of the _____Phase of the Project, situated on the
plot bearing C.N. No/CTS No./Survey no./ Final Plot no ______________ of Division
__________ village _____________ taluka _____________________ District _______________
PIN____________admeasuring __________sq.mts. area being develo
Name]
1. Following technical professionals are appointed by Owner / Promoter :-
(i) M/s/Shri/Smt __________________________as L.S. / Architect ;
(ii) M/s /Shri / Smt ________________________ as Structural Consultant
(iii) M/s /Shri / Smt ________________________ as MEP Consultant
(iv) M/s /Shri / Smt ________________________as Site Supervisor
Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid
Real Estate Project , I certify that as on the date of this certificate, the Percentage of
Work done for each of the building/Wing of the Real Estate Project as registered vide
number ________________ under MahaRERA is as per table A herein below. The
percentage of the work executed with respect to each of the activity of the entire phase
is detailed in Table B.
Table A
Building /Wing Number_____(to be prepared separately for each Building /Wing of
the Project)
Sr. No Tasks /Activity Percentage
of work done
1 Excavation
2 _________ number of Basement(s) and Plinth
3 _________ number of Podiums
4 Stilt Floor
5 __________number of Slabs of Super Structure
6 Internal walls, Internal Plaster,
Floorings within Flats/Premises,
Doors and Windows to each of the Flat/Premises
12
7 Sanitary Fittings within the Flat/Premises,
Electrical Fittings within the Flat/Premises
8 Staircases, Lifts Wells and Lobbies at each
Floor level connecting Staircases and Lifts,
Overhead and Underground Water Tanks
9 The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of
the Building/Wing,
10 Installation of lifts, water pumps, Fire Fighting Fittings
and Equipment as per CFO NOC, Electrical fittings to
Common Areas, electro, mechanical equipment,
Compliance to conditions of environment /CRZ NOC,
Finishing to entrance lobby/s, plinth protection,
paving of areas appurtenant to Building/Wing,
Compound Wall and all other requirements as may be
required to Obtain Occupation /Completion Certificate
TABLE-B
Internal & External Development Works in Respect of the entire Registered Phase
S.No Common areas Proposed Percentage of Details
and Facilities, (Yes/No) Work done
Amenities
1. Internal Roads &
Foothpaths
2. Water Supply
3. Sewarage
(chamber, lines,
Septic Tank ,
STP)
4. Storm Water
Drains
5. Landscaping &
Tree Planting
6. Street Lighting
7. Community
Buildings
8. Treatment and
disposal of
sewage and
sullage water
13
9. Solid Waste
management &
Disposal
10. Water
conservation,
Rain water
harvesting
11. Energy
management
12. Fire protection
and fire safety
requirements
13. Electrical meter
room, sub-station,
receiving station
14. Others ( Option to
Add more)
Yours Faithfully
Signature & Name (IN BLOCK LETTERS) of L.S/ Architect
14