Dry Cleaning and Inspection Esp Unit #2: Maintenance Standard Report

1. The document outlines a maintenance schedule for dry cleaning and inspection of ESP Unit #2 over 11 days. 2. The schedule includes cleaning the interior of the ESP unit across multiple fields, inspecting components like the hopper, nozzles, electrodes, and electrical parts. 3. Replacement of worn parts is also included, such as reinstalling a pin wheel, shaft, and shaft insulator that were damaged during the initial maintenance process.

Uploaded by

Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
243 views19 pages

Dry Cleaning and Inspection Esp Unit #2: Maintenance Standard Report

1. The document outlines a maintenance schedule for dry cleaning and inspection of ESP Unit #2 over 11 days. 2. The schedule includes cleaning the interior of the ESP unit across multiple fields, inspecting components like the hopper, nozzles, electrodes, and electrical parts. 3. Replacement of worn parts is also included, such as reinstalling a pin wheel, shaft, and shaft insulator that were damaged during the initial maintenance process.

Uploaded by

Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

Doc. No.

MAINTENANCE STANDARD REPORT Issue Date xx xx xxxx


Revision No. 00
Title:
DRY CLEANING AND INSPECTION ESP UNIT #2

Major Schedule For Dry Cleaning and Inspection ESP Unit #2


No. Date Description Detail Description Remarks
1 Day 1 AEP team arrive to site 1. Team manpower arrived at Babelan site
2. Safety training
2 Day 2 Preparation 1. Tools and machine arrived and shift to ESP #2
2. Open all manhole at side and top of ESP and
open all insulator cone ceramic box cover
3. Connection for air compressor pipes
4. Connection for all lighting and fans blower
5. Install scaffolding for hopper and open
expansion Joint at hopper outlet flange
6. Alignment the cover for hopper
3 Day 3 Cleaning For First Field Cleaning inside of ESP
4 Day 4 Cleaning First and Second Cleaning inside of ESP
Field
5 Day 5 Cleaning Cleaning For Second Field Cleaning inside of ESP
6 Day 6 Cleaning For Third Field Cleaning inside of ESP
7 Day 7 Cleaning Third and Forth Field Cleaning inside of ESP
8 Day 8 Cleaning For Forth Field Cleaning inside of ESP
9 Day 9 Inspection Hopper 1. Inspection for condition of hopper construction
2. Inspection for condition of ash cleaning
Nozzle 1. Inspection for condition of inlet nozzle
distribution plate
2. Inspection for condition of outlet baffler
channel sheet
Collecting Electrode System 1. Inspection for condition of collecting plate
2. Inspection for condition of collecting plate fixing
condition
3. Inspection for condition collecting plate rapping
hammer alignment
4. Inspection for condition collecting plate rapping
anvil shaft function
Discharge Electrode System 1. Inspection for condition of discharge emitting
wire
2. Inspection for condition of discharge emitting
Frame
3. Inspection for condition of discharge electrode
system rapping hammer alignment
4. Inspection for condition of discharge electrode
system rapping anvil shaft function
5. Inspection for condition of discharge electrode
system rapping force transit insulator and the
insulator heater
6. Inspection for condition of discharge electrode
system hanging bearing insulator
10 Day 10 Inspection Electrical Part 1. Inspection for all heater at hopper and top
(specially the top insulator heaters)
2. Inspection for all rapping motors and gearbox
condition,include emitting rapping / collecting
rapping

Page 1
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

No. Date Description Detail Description Remarks


3. Inspection for all rapping motors and gearbox
condition,include emitting rapping / collecting
rapping
4. Inspection for all transformer condition included
the bushing and connect rod and insulators
5. Test resistance of discharge electrode to
collecting plates
Other Inspection for distance between the collecting
plate and emitting wire , to make sure all distance
is good enough
11 Day 11 Open test and Short test, Megger test on 1. Open test and short test to cross check all
Field, NoLoad test Transformer and control panel are still working
2. Megger to check insulation resistance of
emitting system
12 Day 12 Start up Joint with starting of plant

Friday, 31 May 2019

Install the tarpaulin at ESP’s side to prevent


ashes go further

Prepare to open all manholes

Saturday, 1 June 2019

Open the middle and top position manholes

Page 2
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Open hopper’s manholes

Clean the manhole’s area

Open the cone ceramic’s housing and ground it


all to discharge electricity charge

Monday, 2 June 2019

Install scaffolding and prepare to dismantle


expansion joint

Dismantle all expansion joint

Page 3
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Install Cylindrical Tarpaulin to replace the


Expansion Joint, so the ashes will fall down
right to bag of sack

Dry Clean the top position of Field 1

Tuesday, 3 June 2019

Continue the dry clean process in Field 1

Dry clean in Field 2

Page 4
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Wednesday, 4 June 2019

Dry clean in Field 3 and 4

Sunday, 9 June 2019

Continue dry clean all Fields

Continue clean the cone ceramic housing and


Motor gearbox’s coupling on top area

Monday, 10 June 2019

Continue clean the cone ceramic’s housing and


hammer motor’s casing in the middle area

Page 5
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Cleaning inside cone ceramic area

Tuesday, 11 June 2019

Re-install pin wheel, shaft and shaft insulator


with new one. This work was carried out
because of the initial plan is to take one set of
them from unit 2 and move to unit 1 first. But
in process there was an accident so the shaft
insulator fell down and broke . As a solution
AEP team decided to provide a new unit of
shaft insulator and re-install

Install all expansion joint

Page 6
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Wednesday, 12 June 2019

Inspection on inside hopper area

Tag-weld on the male part of pin wheel’s shaft


and its bolt so it won’t be separated

Inspection of distance between the shaft and


cone ceramic

Inspection the distance between Collecting


Plate and Emitting Electrode (Field 1 & Field 2)

Page 7
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Inspect the distance between Collecting Plate


and Emitting Electrode (Field 3 and Field 4)

Thursday, 13 June 2019

Inspect on collecting plate’s hammer & Anvils

Inspect on collecting plates and emitting


electrodes in Field 1 and Field 2

Page 8
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Inspect on collecting plates and emitting


electrodes in Field 3 and Field 4

Inspect of inlet screen nozzle distribution plate

Friday, 14 June 2019

Field 1 Megger Resistance Test

Field 2 Megger Resistance Test

Page 9
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Field 3 Megger Resistance Test

Field 4 Megger Resistance Test

Because of Field 4 result was below 100 MΩ,


AEP team re-check the condition inside of field
4 and re-clean of cone ceramic. After some
time, megger test again and the picture was
result

Page 10
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Mapping of Emitting Electrodes and Collecting Plates of Field No. 1


WALL 1 2 3 4 5

37
Note :

36

35 Collecting plate in good condition

34
Emitting electrode in good
condition
33

32 Hammer in good condition

31
The condition of Collecting Plate
30 Bending, but based on inspection
the item is still in good condition
for use
29

28 There is joint apart on collecting


Inlet Side
plate item
27

There is damage to the Anvil


26 Hammer, either the loss of bolt or
plate
25

24

23

22

21

20

19

18

17

Page 11
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

16

15

14

13

12

11

Inlet Side 10

WALL

MANHOLE

Page 12
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Mapping of Emitting Electrodes and Collecting Plates of Field No. 2


WALL 1 2 3 4 5

37 Note :

36

35 Collecting plate in good condition

34
Emitting electrode in good
condition
33

32 Hammer in good condition

31
The condition of Collecting Plate
30 Bending, but based on inspection
the item is still in good condition
for use
29

28 There is joint apart on collecting


Inlet Side
plate item

27

There is damage to the Anvil


26 Hammer, either the loss of bolt or
plate
25

24

23

22

21

20

19

18

17

Page 13
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

16

15

14

13

12

11

10

WALL

MANHOLE

Page 14
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Mapping of Emitting Electrodes and Collecting Plates of Field No. 3


WALL 1 2 3 4 5

37 Note :

36

35 Collecting plate in good condition

34
Emitting electrode in good
condition
33

32 Hammer in good condition

31
The condition of Collecting Plate
30 Bending, but based on inspection
the item is still in good condition
for use
29

28 There is joint apart on collecting


Inlet Side
plate item
27

There is damage to the Anvil


26 Hammer, either the loss of bolt or
plate
25

24

23

22

21

20

19

18

17

Page 15
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

16

15

14

13

12

11

10

WALL

MANHOLE

Page 16
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Mapping of Emitting Electrodes and Collecting Plates of Field No. 4


WALL 1 2 3 4 5

37 Note :

36

35 Collecting plate in good condition

34
Emitting electrode in good
condition
33

32 Hammer in good condition

31
The condition of Collecting Plate
30 Bending, but based on inspection
the item is still in good condition
for use
29

28 There is joint apart on collecting


Inlet Side
plate item
27

There is damage to the Anvil


26 Hammer, either the loss of bolt or
plate
25

24

23

22

21

20

19

18

17

Page 17
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

16

15

14

13

12

11

10

WALL

MANHOLE

Page 18
Long Term Maintenance Report [Doc. No. -xx-xxx Rev.00]
Dry Cleaning and Inspection ESP Unit#2

Technical Report Of ESP Unit #2

1. Description The Condition of ESP Unit #2

Most of the outside appearance still good. Painting and welding of all parts still in good condition, all electrical parts

still in good condition, there has no any heaters and thermometers out of working. Function of transformer still at the

correction and rated condition.

2. Small issues from AEP that have been improved by mechanic team

a. Both of collecting plate and emitting system has some of rapping hammers run to out of the correct position. Few

hammers have broken at fixing frame and disappear. It may due to bolt & nuts of the fixing frame has not been

welding-blocked so that after long running nut has been loosened. Mechanical CL team has repaired and installed

new bolts as well as locked with Tag-weld.

b. Some of Rapping anvil plate at collecting plate rapping system has been in loosen condition, and few parts has

disappeared. It happened due to the same reason that the bolt & nut has not been welding-blocked. All bolts and

nuts at rapping system should be better to been welding-blocked. Our CL mechanic team has replaced with new

Anvil Plate in 22 sets, which is replaced according to mapping of field 1 and field 2.

c. Has few pcs collecting plate at unit 2 has been in bend condition. It may happen during the installation time. All

bend collecting plate should be repaired so that can make sure the distance of collecting plate and emitting wire

still be good. Sparking or short will happened at ESP If any of distance between the collecting plate and emitting

wire has been less them 160mm. And will affect to the second voltage and the function of ESP efficiency.

d. Next time overhaul for ESP should check all the rapping shaft fixing sleeve condition. Should repair any broken one

or damaged one so that the anvil function still can be proper.

e. Next time overhaul of ESP also can do the transformer oil filtration and refilling, so that can make sure

transformer keep in good function.

f. ESP unit #2 of dry cleaning and inspection work is started and complete by AEP contractor according to schedule

set on Planner Outage PT. Cikarang Listrindo.