DOC. NO.
HOT WORK PERMIT
                                                                                                                                            REV.0
Project :                               SCIENCE MUSEUM                            AB KSA /Subcontractor:          Al-Bawani Co.
Permit No :                              ALB / SM / PTW /                                                Date:               /   /   2019
SECTION I                                                              PERMIT REQUEST
Description of hot work:           Welding         Gas Cutting        Soldering       Brazing             Blow torch         Abrasive wheel cutting
    Location on Site: … …………………………………………….                                                    Name of welder: …………………………………………..                                
          Duration of work - Date:         From:                                                 Hrs.            To:                     Hrs.
SECTION II (Requirement for the Permit)
                                                               Y   N     N/A                                                                     Y   N   N/A
               Person engaged are fully qualified and                             Grinder /cutting machines are free from defects,
    trained.                                                                        equipped with pressure switch & safety guard.
                                                                                                Are abrasive wheels to standard
   Workers fully aware of Risk Assessment.
                                                                                      (EN/BS) required and compliance.
   Affected areas are cleared of flammable materials.                             Use right / correct wheel on grinder.
                                                                                   Machine spindle speed is less than that of the
   Sufficient and suitable Fire Extinguishers provided.
                                                                                    maximum speed of the wheel / Disc.
   Wet fire resistant cloth / fire blanket / gunny bag has                        Abrasive wheel flange (front or back) is of right size
    been kept to control falling sparks.                                            and fitting.
   Flash back arrestor installed between regulator and                           Use of grinders to be on proper working platform, not
    gas hose.                                                                       on ladders or steps.
   Gas cylinder and fittings are free from oil, grease,
                                                                                   Supervisor will available all time.
    leakage and legibly marked and kept on trolley.
   Operatives are in possession of suitable PPE.                                  Location plan / layout attached.
   Welding machine / equipment tested and free from                               Fire watcher appointed.
    defects (cables, holder etc.).                                                  Name: ……………………………………………
   Gas cylinders are kept in a safe place / outside                               Any other precautions
    confined space.                                                               …………………………………………………………
       Work-in-Charge(Name):        ……………………………                    Signature:         ……………………                         Contact No.      ……………………
           The above precautions / requirements are in place.
           AB KSA Subcontractor Risk Assessment No. …………………….. Dated …………………… was addressed to the team
            and work in-charge on (Date)……………….. , and they are fully aware of the same.
    Site Manager / Engineer(Name):                                                                            Signature:
                 HSE Officer(Name):                                                                           Signature:
Section III PERMIT ISSUE
This Permit is valid till (Date):                                         Time:                Hrs.
                                                                             Fire watching must be done for one hour after completion of work.
AL-BAWANI Construction KSA Site Manager / Engineer                           AL-BAWANI Construction KSAHSE Officer
    Name:                                     Signature:                       Name:                                       Signature:
                                               Hrs.                                                   Hrs.
Extension granted up to: 1                     on                        2                            on
Section IVPERMIT CLOSURE
                SUBCONTRACTOR                                                                   AL-BAWANI Construction KSA
Works completed On ……………............. at ………..hrs.
                                                                               Area inspected and the permit closed on …………………….. at
One hour fire watch period finished, area inspected and the
                                                                               …………. Hrs.
permit closed at ……….. hrs.
     Name:                                                                            Name:
Signature:                                                                     Signature:
 Revised on                                                                                                                                     Page 1 of 1