Mobile Crane Checklist: Frequency Name of Project Date

The document is a daily checklist for inspecting a mobile crane. It contains 27 items to check on the crane ranging from the operator's cabin, brakes, load indicators, slew ring, electrics/hydraulics, counterweights, tyres/tracks, boom/jibs, pendant wires, bridle/'A' frame, drums/winches, sheave system, derricking rope, auxiliary hook block, main hook block, hoist limits, outriggers, swing radius warnings, lights, engine fluids, hydraulic oil, fuel level, air cleaner, oil leaks, and fire extinguisher. Operators are required to sign off to confirm all defects were reported.

Uploaded by

faisal nadeem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views1 page

Mobile Crane Checklist: Frequency Name of Project Date

The document is a daily checklist for inspecting a mobile crane. It contains 27 items to check on the crane ranging from the operator's cabin, brakes, load indicators, slew ring, electrics/hydraulics, counterweights, tyres/tracks, boom/jibs, pendant wires, bridle/'A' frame, drums/winches, sheave system, derricking rope, auxiliary hook block, main hook block, hoist limits, outriggers, swing radius warnings, lights, engine fluids, hydraulic oil, fuel level, air cleaner, oil leaks, and fire extinguisher. Operators are required to sign off to confirm all defects were reported.

Uploaded by

faisal nadeem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MOBILE CRANE CHECKLIST DOC. NO.

REV.0

FREQUENCY NAME OF PROJECT DATE


DAILY
Crane Reg. No: Serial No. Crane Model:
Company:
SrN NOT
CHECKS OK Remarks
o OK
1. Operator’s cabin (glass visibility, instrument counters).
2. Brakes, clutch and Lever.
3. Load Indicator.
4. Load chart displayed.
5. Slew Ring (Teeth / roller / bolts on turn table).
6. Electrics / hydraulics hose fittings and tubing.
7. Counter weights.
8. Tyres / tracks.
9. Boom / jibs (angle indicator).
10. Luffing up and Down Limit.
11. Pendant wires.
12. Bridle / ‘A’ frame.

13. Drums/ winches (spooling of hoist lines, locking devices, rotation).

14. Sheave system (lubrication / free movement).


15. Derricking rope.
16. Aux. hook block.
17. Aux. hoist wire.
18. Main hook block.
19. Main hoist wire.
20. Hoist up Limit.
Out rigger status, (lubrication, structural condition, pressure, Level
21.
indicating devices.).
22. Swing radius warning devices.
Head light, Reverse horn, beeper and beacon (warning) lights
23.
etc... are working properly.
24. Engine Oil, Radiator Coolant and Battery water levels.
25. Hydraulic Oil and Fuel Level.
26. Engine Air cleaner. (Air filter).
27. Oil leaks.
28. Fire Extinguisher.

Comments / Suggestions: All defects / faults were notified to the Rigger Foreman / Safety Dept.

Operator(Name): Signature:

Plant Site In-charge(Name) : Signature:

Note: All checks are visual and detailed checks will be carried out by the Technician.