U.P.
POWER CORPORATION LIMITED
SHAKTI BHAWAN, 14, ASHOK MARG,
LUCKNOW
PUBLIC NOTICE
Pursuant to Section 64 of the Electricity Act 2003, the State Government owned distribution
companies namely Paschimanchal Vidyut Vitran Nigam Ltd., Purvanchal Vidyut Vitran Nigam
Limited, Madhyanchal Vidyut Vitran Nigam Limited, Dakshinanchal Vidyut Vitran Nigam
Limited submitted their Business Plan, Multi Year Aggregate Revenue Requirement petitions
for first control period FY 2017-18 to FY2019-20 along with true up petition for FY2014-15 on
21st June, 2017 and Kanpur Electricity Supply Company Ltd. on 30th November, 2016.
Further, the tariff proposal/Rate Schedule for FY2017-18 was submitted on 8th August, 2017
before Hon’ble U.P. Electricity Regulatory Commission, Lucknow. Consequent upon
acceptance of aforementioned petitions on 04.09.2017, the Hon'ble Commission has issued
order on approval of Business Plan, Multi Year Aggregate Revenue Requirement for FY 2017-
18 to 2019-20 and true-up for FY 2014-15 on 30th November, 2017.
Rate Schedule, as approved by Hon’ble Commission for FY 2017-18 is informed as under :-
RATE SCHEDULE FOR FY 2017-18
CONSUMER Approved Tariff
CATEGORY / SUB-CATEGORY Tariff Order FY 2017-18
LMV-1 DOMESTIC LIGHT, FAN & POWER:
(a) Consumers getting supply as per "Rural Schedule" :
(i) Un-Metered:
Fixed Charge:
All Load upto 31.03.2018 Rs. 300.00 / kW / month
All Load from 01.04.2018 Rs. 400.00 / kW / month
(ii) Metered:
Fixed Charge: Rs. 80.00 / kW / month
Energy Charge:
Upto 100 kWh / Month Rs. 3.00 / kWh
101-150 kWh / Month Rs. 3.50 / kWh
151-300 kWh / Month Rs. 4.50 / kWh
301-500 kWh / Month Rs. 5.00 / kWh
Above 500 kWh / Month Rs. 5.50 / kWh
For consumers with contracted load upto 1 kW and not consuming more than 100
units per month, fixed charges shall be Rs. 50.00/kW/month.
(b) Supply at single point for bulk loads: 50kW and above, Supplied at any voltage
Fixed Charge Rs. 95.00 / kW / month
Energy Charge Rs. 6.10 / kWh
(c) Other Metered Domestic Consumers: (For All Loads)
Fixed Charge Rs.100.00 / kW / month
Energy Charge
Upto 150 kWh / Month Rs. 4.90 / kWh
151-300 kWh / Month Rs. 5.40 / kWh
301-500 kWh / Month Rs. 6.20 / kWh
Above 500 kWh / Month Rs. 6.50 / kWh
Life Line Consumers: With contracted load of 1.00 kW, Energy consumption upto
(d)
100 kWh/ Month
Fixed Charge Rs. 50.00 / kW / month
Energy Charge ( 0-100 Units) Rs. 3.00 / kWh
LMV-2 NON-DOMESTIC LIGHT, FAN & POWER:
(a) Consumers getting supply as per "Rural Schedule"
(i) Un-Metered
Fixed Charge Rs. 1000.00 / KW / month
(ii) Metered
Fixed Charge Rs. 95.00 / kW / month
Energy Charge Rs. 5.00 / kWh
(b) Private Advertising/Sign Post/Sign Board/Glow Signs/Flex
Metered
Fixed Charge -
Energy Charge Rs. 18.00 / kWh
Minimum Charges Rs. 1800.00 / kW / month
(c) Other Metered Consumers:
Fixed Charge
Upto Load of 2 kW Rs. 300.00 / kW / month
above 2 kW to 4 kW Rs. 350.00 / kW / month
above 4 kW Rs. 430.00 / kW / month
Energy Charge upto 300 kWh / Month Rs. 7.00 / kWh
Energy Charge from 301-1000 kWh /
Rs. 8.00 / kWh
Month
Energy Charge above 1000 kWh/ Month Rs. 8.30 / kWh
Rs. 575/kW/Month (Apr to Sept)
Minimum Charge
Rs. 425/kW/Month (Oct to March)
LMV-3 PUBLIC LAMPS:
Un-Metered Supply: (Billed on total Connected Load of individual points)
Gram Pachayat Rs. 2000.00 / kW or part thereof / month
Nagar Palika and Nagar Panchayat Rs. 3000.00 / kW or part thereof / month
Nagar Nigam Rs. 4000.00 / kW or part thereof / month
Metered Supply:
Fixed Charge
Gram Pachayat Rs. 160.00 / kW / month
Nagar Palika and Nagar Panchayat Rs. 200.00 / kW / month
Nagar Nigam Rs. 220.00 / kW / month
Energy Charge
Gram Pachayat Rs. 7.00 / kWh
Nagar Palika and Nagar Panchayat Rs. 7.50 / kWh
Nagar Nigam Rs. 7.75 / kWh
TOD Rates % Energy Charge 18:00 Hrs - 6:00 Hrs @ 0%
TOD Rates % Energy Charge 6:00 Hrs - 18:00 Hrs @ +20%
LMV-4 LIGHT, FAN & POWER FOR PUBLIC & PRIVATE INSTITUTION:
4 (A) For Public Institutions:
Fixed Charge
Upto 2 kW Rs. 275.00 / kW / Month
above 2 kW to 4 kW Rs. 290.00 / kW / Month
above 4 kW Rs. 300.00 / kW / Month
Energy Charge
First 1000 kWh/ Month Rs. 7.80 / kWh
Next 1001-2000 kWh/ Month Rs. 8.10 / kWh
Above 2000 kWh/ Month Rs. 8.30 / kWh
4 (B) For Private Institutions:
Fixed Charge
Upto 3 kW Rs. 310.00 / kW / Month
Above 3 kW Rs. 390.00 / kW / Month
Energy Charge
First 1000 kWh/month Rs. 8.60 / kWh
Above 1000 kWh/month Rs. 8.90 / kWh
SMALL POWER FOR PRIVATE TUBE WELL/ PUMPING SETS FOR IRRIGATION
LMV-5
PURPOSES:
(A) Consumers getting supply as per "Rural Schedule"
(i) Un-Metered Supply
Fixed Charge Rs.150.00 / BHP / Month
Lighting load allowed 120 Watts
(ii) Metered Supply
Fixed Charge Rs. 60.00 / BHP / Month
Energy Charge Rs. 1.75 / kWh
Minimum Charge Rs. 150.00 / BHP / Month
(iii) Energy Efficient Pumps
Fixed Charge Rs. 60.00 / BHP / Month
Energy Charge Rs. 1.50 / kWh
Minimum Charge Rs. 130.00 / BHP / Month
(B) Consumers getting supply as per "Urban Schedule (Metered Supply)"
(i) Metered Supply
Fixed Charge Rs. 120.00 / BHP / Month
Energy Charge Rs. 5.50 / kWh
Minimum Charge Rs. 200.00 / BHP / Month
For PTW consumers of Bundelkhand Area located in Gram Sabha, the minimum
amount payable by a consumer shall be Rs. 150.00 per BHP per month, till the
installation of the meter.
LMV-6 SMALL AND MEDIUM POWER:
(A) Consumers getting supply other than "Rural Schedule"
Fixed Charge
Upto 4 kW Rs. 245.00 / kW / Month
Above 4 kW to 9 kW Rs. 255.00 / kW / Month
Above 9 kW Rs. 275.00 / kW / Month
Energy Charge
Upto 1000 kWh/month Rs. 7.00/kWh
Upto 2000 kWh/month Rs. 7.35/kWh
Above 2000 kWh/ month Rs. 7.60/kWh
TOD Structure
Summer Months (April to September)
05:00 hrs-11:00 hrs (-) 15%
11:00 hrs-17:00 hrs 0%
17:00 hrs-23:00 hrs (+)15%
23:00 hrs-05:00 hrs 0%
Winter Months (October to March)
05:00 hrs-11:00 hrs 0%
11:00 hrs-17:00 hrs 0%
17:00 hrs-23:00 hrs (+)15%
23:00 hrs-05:00 hrs (-)15%
(B) Consumers getting supply as per "Rural Schedule"
Consumers getting supply as per Rural Schedule shall be entitled to a rebate of
7.5% on RATE as given for under urban schedule without TOD rates.
LMV-7 PUBLIC WATER WORKS:
(a) Consumers getting supply other than "Rural Schedule"
Fixed Charge Rs. 350.00 / kW / Month
Energy Charge Rs. 8.30 / kWh
(b) Consumers getting supply as per "Rural Schedule"
Consumers getting supply as per Rural Schedule shall be eligible for a Rebate of
7.5% on RATE as given for under other than rural schedule.
LMV-8 STW, PANCHAYTI RAJ TUBE WELL & PUMPED CANALS:
(i) Metered
Fixed Charge Rs. 300.00 / BHP / Month
Energy Charge Rs. 7.40 / kWh
(ii) Un-Metered
Fixed Charge Rs. 3000.00 / BHP / Month
LMV-9 TEMPORARY SUPPLY:
Un-Metered
Fixed Charges for Illumination / Public
Address / ceremonies for loads upto 20
Rs. 4250.00 per day
kW / connection plus Rs.100.00 / kW /
(A)
day for each additional kW
Fixed charges for temporary shops set-up
during festivals / melas or otherwise and Rs. 500.00 per day / shop
having load up to 2 KW
Metered
Energy Charge
Rs. 7.50 / kWh
From 3rd year onwards: Base Tariff
(i) Individual Residential Construction
applicable for current year plus additional
(B) 10% of the applicable tariff
Rs. 8.50 / kWh
From 3rd year onwards: Base Tariff
(ii) Others
applicable for current year plus additional
10% of the applicable tariff
Minimum Charge: Rs. 400.00 / kW /week
LMV-10 DEPARTMENTAL EMPLOYEES AND PENSIONERS
On all such consumers LMV-1 rate schedule will be applicable. However the
Licensees are authorised to provide “rebate” as they deem fit to the consumers
eligible to get supply under this category.
HV-1 NON-INDUSTRIAL BULK LOAD
Commercial Loads / Private Institutions / Non-Domestic Bulk Power with
(a) contracted Load 75 kW & above and getting supply at single point on 11 kV &
above voltage level.
Demand Charges
For Supply at 11 kV
Upto 100 kVA Rs. 360.00 / kVA / month
Above 100 kVA Rs. 400.00 / kVA / month
For Supply above 11 kV
Upto 100 kVA Rs. 360.00 / kVA / month
Above 100 kVA Rs. 400.00 / kVA / month
Energy Charge
For Supply at 11 kV
First 2500 kVAh/month Rs. 7.90 / kVAh
Above 2500 kVAh/month Rs. 8.25 / kVAh
For Supply above 11 kV
First 2500 kVAh/month Rs. 7.70 / kVAh
Above 2500 kVAh/month Rs. 8.05 / kVAh
Public Institutions, Registered Societies, Residential Colonies / Townships,
Residential Multi-Storied Buildings including Residential Multi-Storied Buildings
(b)
with contracted load 75 kW & above and getting supply at Single Point on 11 kV
& above voltage levels
Demand Charges
For Supply at 11 kV
Upto 100 kVA Rs. 325.00 / kVA / month
Above 100 kVA Rs. 340.00 / kVA / month
For Supply above 11 kV
Upto 100 kVA Rs. 325.00 / kVA / month
Above 100 kVA Rs. 340.00 / kVA / month
Energy Charge
For Supply at 11 kV
First 2500 kVAh/month Rs. 7.50 / kVAh
Above 2500 kVAh/month Rs. 7.70 / kVAh
For Supply above 11 kV
First 2500 kVAh/month Rs. 7.30 / kVAh
Above 2500 kVAh/month Rs. 7.50 / kVAh
HV-2 LARGE AND HEAVY POWER
(A) Urban Schedule
1. For supply up to 11 kV
Demand Charges Rs. 250.00 / kVA / month
Energy Charge Rs. 6.65 / kVAh
2. For supply above 11 kV and upto 66 kV
RATE:
Demand Charges Rs. 240.00 / kVA / month
Energy Charge Rs. 6.35 / kVAh
3. For supply above 66 kV and upto 132 kV
RATE:
Demand Charges Rs. 220.00 / kVA / month
Energy Charge Rs. 6.15 / kVAh
4. For supply above 132 kV
RATE:
Demand Charges Rs. 220.00 / kVA / month
Energy Charge Rs. 5.95 / kVAh
ToD Structure
Summer Months (April to September)
05:00 hrs-11:00 hrs (-) 15%
11:00 hrs-17:00 hrs 0%
17:00 hrs-23:00 hrs (+)15%
23:00 hrs-05:00 hrs 0%
Winter Months (October to March)
05:00 hrs-11:00 hrs 0%
11:00 hrs-17:00 hrs 0%
17:00 hrs-23:00 hrs (+)15%
23:00 hrs-05:00 hrs (-)15%
(B) Rural Schedule:
This Schedule shall be applicable only to consumers getting supply upto 11 kV as
per "Rural Schedule". The consumers under this category shall be entitled to a
rebate of 7.5% on Base Rate as given for 11kV consumers under urban schedule
without TOD Rate.
HV-3 RAILWAY TRACTION & METRO RAIL
RAILWAY TRACTION
(a) Demand Charges
For Supply below 132 kV Rs. 375.00 / kVA / month
For Supply at & above 132 kV Rs. 365.00 / kVA / month
(b) Energy Charge
For Supply below 132 kV Rs. 7.90 / kVAh
For Supply at & above 132 kV Rs. 7.65 / kVAh
(c) Minimum Charge Rs. 850.00 / kVA / month
METRO RAIL
(a) Demand Charges Rs. 200.00 / kVA / month
(b) Energy Charge Rs. 6.50 / kVAh
(c) Minimum Charge Rs. 800.00 / kVA / month
Penalty @ Rs. 540/kVA/month will be charged on excess demand, if demand
exceeds contracted load.
HV-4 LIFT IRRIGATION WORKS
(a) Demand Charges
For Supply at 11 kV Rs. 320.00 / kVA / month
For Supply at 33 kV & 66 kV Rs. 310.00 / kVA / month
For Supply at 132 kV Rs. 300.00 / kVA / month
(b) Energy Charge
For Supply at 11 kV Rs. 7.70 / kVAh
For Supply at 33 kV & 66 kV Rs. 7.55 / kVAh
For Supply at 132 kV Rs. 7.35 / kVAh
(c) Minimum Charge Rs. 1000.00 / kVA / month
Applicable Regulatory Surcharge:
Regulatory Surcharge-2: In compliance to the UPERC Tariff Order, FY 2017-18 dated 30.11.2017
Regulatory surcharge 2 @ 4.28% shall be applicable for consumers in the supply area of DVVNL,
MVVNL and PuVVNL and @ *0.00% for consumers in the supply area of PVVNL.
Further regulatory surcharge 2 shall continue @ 3.91% for LMV-1 & LMV-5 category of consumers
and @ 4.13% for other category of consumers lying in the supply area of KESCo.
*Note:-However the commission will review this again once the actual figure of RS recoverd for
PVVNL and other licensees are available.
The Above Rate and Regulatory surcharge as approved by U.P. Electricity Regulatory Commission
shall become applicable after 7 days from this publicaion in all four DisComs and KesCo. The
detailed Multi Year Aggregate Revenue Requirement, Business Plan for FY 2017-18 to FY 2019-20,
True-up for FY 2014-15 & above approved Rate schedule are available at the website of all DisComs
(www.mvvnl.in, www.dvvnl.org, www.puvvnl.up.nic.in, www.pvvnl.org & www.kesco.co.in), U.P.
Power Corporation Ltd. & U.P. Electricity Regulatory Commission at www.uppcl.org &
www.uperc.org, respectively.
Chairman
(MVVNL, DVVNL, PVVNL, PuVVNL & KesCo)
"Save energy in the interest of Nation"