100% found this document useful (1 vote)
247 views7 pages

List of Method Satement (MS)

The document lists method statement submissions for construction work on the Marriott Grand Ballroom. It includes sections for electrical works, LV switchgear and panels, fire detection alarm systems, auxiliary systems, grounding systems, concrete works, masonry works, metal works, and thermal/moisture protection works. Each section lists the various method statements required for items like installing conduits and wiring, fabricating and installing electrical equipment, embedded and exposed roughing-ins, testing, and commissioning of the systems.

Uploaded by

Imho Tep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
247 views7 pages

List of Method Satement (MS)

The document lists method statement submissions for construction work on the Marriott Grand Ballroom. It includes sections for electrical works, LV switchgear and panels, fire detection alarm systems, auxiliary systems, grounding systems, concrete works, masonry works, metal works, and thermal/moisture protection works. Each section lists the various method statements required for items like installing conduits and wiring, fabricating and installing electrical equipment, embedded and exposed roughing-ins, testing, and commissioning of the systems.

Uploaded by

Imho Tep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 7

MARRIOTT GRAND BALLROOM

LIST OF METHOD STATEMENT (MS) SUBMISSION

ITEM SCOPE OF WORKS


1.0 ELECTRICAL WORKS
1.1 MS for the Installation of Conduit for Power, Telephone & CATV Service Entrance
1.2 MS for the Embedded Roughing-ins including boxes / pullboxes (PVC Pipes)
1.3 MS for the Exposed Roughing-ins including boxes / pullboxes (Feeder & Distribution Layout)
1.4 MS for the application of Fire Stopped Sealant
1.5 MS for wiring Works / Cable Pulling
1.6 MS for Continuity Test
1.7 MS for Insulation Resistance Test (Megger Test)
1.8 MS for Installation of Wiring Devices
1.9 MS for Installation of Lighting Fixtures
1.10 MS for Functionality Test of Wiring Devices & Lighting Fixtures
1.11 MS for Final Testing & Commissioning
1.12 Others, please Specify

2.0 LVSG, PANELBOARDS, ECBs, METER CENTER, ETC.


2.1 MS for Fabrication of LVSG, ATS, Panelboards, ECBs, Meter Center, etc.
2.2 MS for Installation of LVSG, ATS, Panelboards, ECBs, Meter Center, etc.
2.3 MS for final testing & Comissioning
2.4 Other, please specify
3.0 FIRE DETECTION ALARM SYSTEM
3.1 MS for the Embedded Roughing-ins including boxes / pullboxes (IMC Pipes)
3.2 MS for the exposed Roughing-ins including boxes / pullboxes (Feeder & Distribution Layout)
3.3 MS for Wiring Works / Cable Pulling
3.4 MS for Continuity Test
3.5 MS for Insulation Resistance Test (Megger Test)
3.6 MS for Installation of Equipment & Devices
3.7 MS for final testing & Comissioning
3.8 Other, please specify
4.0 AUXILIARY SYSTEM
4.1 MS for the Embedded Roughing-ins including boxes / pullboxes (PVC / IMC Pipes)
4.2 MS for the exposed Roughing-ins including boxes / pullboxes (Feeder & Distribution Layout)
4.3 MS for Wiring Works / Cable Pulling
4.4 MS for Continuity Test
4.5 MS for Insulation Resistance Test (Megger Test)
4.6 MS for Installation of Equipment & Devices
4.7 MS for final testing & Comissioning
4.8 Other, please specify
5.0 GROUNDING SYSTEM
5.1 MS for Installation of Grounding System
5.2 MS for Earth Resistance Test
5.3 MS for final testing & Comissioning
5.4 Other, please specify
SION

Status As of

ce

ution Layout)

ution Layout)

es)
ution Layout)
MARRIOTT GRAND BALLROOM
LIST OF METHOD STATEMENT (MS) SUBMISSION

ITEM SCOPE OF WORKS Status As of


1.0 CONCRETE WORKS
1.1 MS for Fabrication & Installation of Concrete Reinforcement Submitted for Review/Comments 18-Jul
1.2 MS for Cast-In-Place Concrete Submitted for Review/Comments 18-Jul
1.3 MS for Installation of Post-Tensioned Concrete
1.4 MS for Shotcrete Concrete Submitted for Review/Comments 18-Jul
For submission to EELHI for
1.5 MS for Concrete Repair using Epoxy Resin Concrete, Grouts & Mortars 19-Jul
Comments / Review
1.6 MS for Concrete Rehabilitation
1.7 Others, please Specify
2.0 MASONRY WORKS
2.1 MS for Installation of Unit Masonry works
a. CHB Setting
Submitted for Review/Comments 18-Jul
b. Plastering
c. Tile Setting
2.2 Others, please Specify
3.0 METAL WORKS
3.1 MS for Installation of Structural Steel Works
3.2 MS for Installation of Steel Deck Works
3.3 MS for Metal Fabrication Works
3.4 Others, please Specify
4.0 THERMAL AND MOISTURE PROTECTION WORKS
4.1 MS for Application of Bituminous Membrane
4.2 MS for Installation of Seismic Joint System
4.3 Others, please Specify
MARRIOTT GRAND BALLROOM
LIST OF METHOD STATEMENT (MS) SUBMISSION

ITEM SCOPE OF WORKS


1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
M
UBMISSION

Status As of

You might also like