0% found this document useful (0 votes)
41 views1 page

Increasing Site Workers

The document is a letter from Cambridge Industries Limited and China National Electric Engineering Co. Ltd to the EPC Contractor regarding the Rappie Waste-to-Energy Project. It requests that the EPC Contractor increase the number of site workers to help complete the project on schedule, as agreed upon in a previous meeting. The letter also states that the EPC Contractor must comply with its contractual obligations or face contractual measures if any breaches are found. The letter was copied to the PMO office, Generation Program office, and Ramboll in Denmark.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views1 page

Increasing Site Workers

The document is a letter from Cambridge Industries Limited and China National Electric Engineering Co. Ltd to the EPC Contractor regarding the Rappie Waste-to-Energy Project. It requests that the EPC Contractor increase the number of site workers to help complete the project on schedule, as agreed upon in a previous meeting. The letter also states that the EPC Contractor must comply with its contractual obligations or face contractual measures if any breaches are found. The letter was copied to the PMO office, Generation Program office, and Ramboll in Denmark.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

የደብዳቤ ቁጥር

Ref.No. ____________________
ቀን
Date_______________________

Cambridge Industries Limited (CIL)


China National Electric Engineering Co. Ltd (CNEEC)
Addis Ababa, Ethiopia

Contract: Rappie Waste-to-Energy Project


Subject: Increasing site workers
Reference:-

Dear Sirs,

As we agreed from the meeting that EEP, Ramboll and EPC Contractor to complete the project at time
schedule please be increasing site workers.

We, therefore, strictly inform the EPC contractor shall comply with the contractual obligation with the
above mentioned information and if the Employer finds out any breach of contract he will took a
contractual measure accordingly.