0% found this document useful (0 votes)
105 views1 page

02 Bar Chart

The construction schedule is a bar chart showing the planned timeline for activities on a construction project from January 2018 through September 2018. It lists the activity description and duration in months for each numbered activity, and indicates the planned start and finish dates across the 9 month period. The schedule is intended to help plan and track progress of the construction project.

Uploaded by

balabhavini
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views1 page

02 Bar Chart

The construction schedule is a bar chart showing the planned timeline for activities on a construction project from January 2018 through September 2018. It lists the activity description and duration in months for each numbered activity, and indicates the planned start and finish dates across the 9 month period. The schedule is intended to help plan and track progress of the construction project.

Uploaded by

balabhavini
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CONSTRUCTION SCHEDULE - BAR CHART

FORMAT NO. : QF 9949 02


BU PLANNING R0 - 15.11.2018

JOB NO : BU :
PROJECT NAME : REV. :
DOC. NO. : DATE :

Activity Duration Period in Months


Work
Sr. No. Activity Description Unit Quantity Productivity Start Date Finish Date Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18
Front Working Calendar
Months
Days Days
1 2 3 4 5 6 7 8 9

PAGE NO. : 1 of 1