Multi-Purpose Hall Repair Phase III

This document provides a program of work and budget for repairs and improvements to a multi-purpose hall in Brgy. Simpatuya, Sta. Teresita, Cagayan. The project involves demolishing the old roofing, earthworks, concrete works, and formworks. The total estimated cost is 203,150 pesos, which includes direct and indirect costs, 3% for engineering costs, quality control, 1% for advertisement, and total estimated costs. The municipal engineer prepared and approved the program and budget.

Uploaded by

Arnold Lunday
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views1 page

Multi-Purpose Hall Repair Phase III

This document provides a program of work and budget for repairs and improvements to a multi-purpose hall in Brgy. Simpatuya, Sta. Teresita, Cagayan. The project involves demolishing the old roofing, earthworks, concrete works, and formworks. The total estimated cost is 203,150 pesos, which includes direct and indirect costs, 3% for engineering costs, quality control, 1% for advertisement, and total estimated costs. The municipal engineer prepared and approved the program and budget.

Uploaded by

Arnold Lunday
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

Province of Cagayan
MUNICIPALITY OF STA. TERESITA
OFFICE OF THE MUNICIPAL ENGINEER/BUILDING OFFICIAL
October 9, 2020
Date
PROGRAM OF WORK BUDGET/COST FOR PUBLIC
WORK USING EQUIPT. LABOR TECHNOLOGY

Name of Project : REPAIR/IMPROVEMENT OF MULTI-PURPOSE Type of Project: REPAIR/IMPROVEMENT


HALL PHASE III Project Length :
Project Number : No. of Culverts :
Location : BRGY. SIMPATUYO, STA. TERESITA, CAGAYAN RCCP :
Appropriation : P 203,150.00 No. of Span/Storey :
Source of Fund : Time for Completion :
Starting Date :
DESCRIPTION OF WORK % OF LABOR/EQUIPTMENT REQUIREMENTS NEEDED AVAILABLE
TO BE DONE TOTAL DESCRIPTION

ITEM D E S C R I P T I O N UNIT QUANTITY ESTIMATED COST OF WORKS


NO. UNIT COST
I DEMALOTION OF OLD ROOFING SQ.M. 58.30 56.60 3,300.00
II EATHWORKS CU.M 28.97 569.65 16,500.00
III CONCRETE WORKS CU.M 9.58 16,018.89 153,461.00
IV FORMWORKS L.S ALL 29,889.00 29,889.00

BREAKDOWN OF ESTIMATED COST % OF A. DIRECT & INDIRECT COST P: 203,150.00


EXPENDITURES Pesos TOTAL B. COST OF ENG'G. 3%
1.Labor-skilled(Mandays) P C. QUALITY CONTROL
2.Materials D. ADVERTISEMENT 1%
3.Hand-tools E. TOTAL ESTIMATED COST P: 203,150.00
4.Rental Equipment
5.POL & Maintenance
Direct Cost - Total P

PREPARED BY:

ENGR. LIEZEL S. UDAUNDO


OIC-Municipal Engineer

APPROVED BY: NOTED BY:

SEVERINO T. TACAS JR ATTY. RODRIGO P. DE GRACIA, CESE


Punong Barangay Municipal Mayor