Surveying Inspection Plan

The document describes an inspection and test plan for surveying works on a dairy farm project. It lists 6 items to be inspected including ensuring drawings are the latest revision, calibrating surveying equipment, establishing coordinates, maintaining reference points, maintaining field records, and a final inspection. Responsibilities are assigned as the contractor being responsible for holding points and the engineer responsible for record reviews. Inspection records like certificates and checklists are identified to verify acceptance criteria are met.

Uploaded by

Melih SENTURK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
198 views3 pages

Surveying Inspection Plan

The document describes an inspection and test plan for surveying works on a dairy farm project. It lists 6 items to be inspected including ensuring drawings are the latest revision, calibrating surveying equipment, establishing coordinates, maintaining reference points, maintaining field records, and a final inspection. Responsibilities are assigned as the contractor being responsible for holding points and the engineer responsible for record reviews. Inspection records like certificates and checklists are identified to verify acceptance criteria are met.

Uploaded by

Melih SENTURK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

Employer :

Engineer :
PROJECT: BALADNA DAIRY FARM PHASE-2 Consultant :
Contractor :

INSPECTION AND TEST PLAN


DESCRIPTION OF WORK : SURVEYING WORKS

Responsibility and Inspection Type


Item # Activity Description Acceptance Criteria Verification Records
Sub. Cont'r Contractor Consultant Engineer

1 All drawings are of latest revision and approved. Approved Drawings Issued for Const. Drgs. H H H R

All surveying equipment are calibrated and Quality System


2 Calibration Certificates H H H R
certificates are available Procedure QSP-017

Datum and location are established in accordance Surveying Works


3 Inspection Check List H H H R
with approved drawings and existing coordinates. Procedure

Client established reference points and bench


Surveying Works
4 marks are maintained at all times during the Inspection Check List H H H R
Procedure
construction.

Surveyor maintains field records for Surveying Works


5 Surveyor's Field Book M M W R
incorporating in the as-built drawings Procedure

6 Final Inspection and Acceptance. Approved Drawings Inspection Check List H H H R

H - Hold Point R - Record Review M - Mandatory Prepared By :

W - Witness Point S - Surveillance NA - Not Applicable Approved By:


Employer : First Qatar Real Estate Development Co.
PORTO ARABIA - THE PEARL QATAR Engineer : Projacs International (PMC)
PARCEL - 11A TOWER - F Consultant : EHAF Consulting Engineers
Contractor : Qatari Arabian Construction Company (QACC)
DEFINITION OF INSPECTION AND TEST PLAN SYMBOLS

"H" - HOLD POINT - A Point beyond which work shall not proceed with out formal approval from the Engineer. Inspection
for Hold Points shall be notified to the Engineer through Inspection Requests.

"W" - WITNESS POINT - A Point beyond which work can proceed without formal approval from the Engineer.
Inspection for witness points will not be notified to any of the inspection parties.

"S" - SURVEILLANCE POINT - A Point where inspection parties may carry-out surveillance of work in progress
and relevant documentation without any notification.

"R" - REVIEW POINT - A Point where appropriate quality records shall be available for verification.
Work can proceed if all the documents are appropriate as per project requirements.

"M" - MANDATORY POINT - A Mandatory activity to be carried-out by the contractor as per contractual requirement.

"NA" - Not Applicable

Procedure Ref. # QSP-018 Form Ref. # QSP/F/018/1 Page 2/2 Form Rev: 0 Rev. Date: 08/10/2006
Procedure Ref. # QSP-018 Form Ref. # QSP/F/018/1 Page 2/2 Form Rev: 0 Rev. Date: 08/10/2006