0% found this document useful (0 votes)
535 views19 pages

Report Syria 24022010

EIC can accept no responsibility for omissions, errors or subsequent changes. This information is highly valuable to your competitors. Always exercise discretion in revealing your sources when contacting any named persons on EICDataStream.

Uploaded by

Amr Baalbaki
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
535 views19 pages

Report Syria 24022010

EIC can accept no responsibility for omissions, errors or subsequent changes. This information is highly valuable to your competitors. Always exercise discretion in revealing your sources when contacting any named persons on EICDataStream.

Uploaded by

Amr Baalbaki
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

Report

Custom Report Description

24 February 2010
19:58

Produced for
spijkersj - Turck

Disclaimer Statement

Whilst every effort has been made to ensure the accuracy and completeness of the information supplied
herein, the EIC can accept no responsibility for omissions, errors or subsequent changes.

This information is highly valuable to your competitors. Please ensure that all EICDataStream project
information is retained within YOUR company. Always exercise discretion in revealing your sources
when contacting any named persons on EICDataStream. Thank you for your co-operation.

Copyright © Energy Industries Council www.the-eic.com


Al Nasserieh CCPP Plant Expansion Active

At a Glance
Planned expansion of the existing Al-Nasserieh power plant. Tracking Status: Active
The plant will operate on either gas or distillate oil, and will Value: $ 350 Million
consist of two gas turbines, two boilers and one steam
Contract Type: EPC (Engineering, Procurement
turbine, and will have a total capacity of 300-500MWe.
& Construction)

Project Status: Tendering & Bidding

Startup Year 2012


Project Category: Power
Scopes: Combined Cycle Power Plant (CCPP)

Project Updated: 12/22/2009

Project Locations
Country Locality Location Comment
Syria Damascus (Sy) Al Nasserieh, North
Damascus

Operators

The Public Establishment for Electricity


Syria, Damascus,
Generation PEEGT Contracts
and Transmission (PEEGT) Contacts:
Dept, Mazzah-17 Hisham Mashfej, Director General - Contracts Department, +96 311
2119040, dg@peegt.gov.sy, PEEGT Contracts Dept, Mazzah-17,
Damascus, Syria

Project Notes
Dec 09 PEEGT has announced that it has applied for financing from the European Investment Bank
towards the cost of the project. PEEGT has also announced a change in the size of the
proposed power plant from 150MWe, to up to 500MWe. A new call for tenders has been
announced and bids are due to be submitted by 31 March 2010.
Dec 09 PEEGT has extended the deadline for bids to be submitted to 7 December.
Sep 09 PEEGT has extended the deadline for bids to be submitted to 22 October.
Aug 09 It is understood that PEEGT is re-tendering the project. The project scope will involve design,
manufacture, supply, transport, insurance, testing, execution of the civil and erection works
and putting into operation of equipments, machineries and appliances for extension of the
power plant by two gas turbines working on gas and distillate oil on a turn key job basis. Bids
are due to be submitted by 7 September.

Al-Nasseriah IPP Active

At a Glance
Development of a 230-250MWe independent power project Tracking Status: Active
which is to be operated on dual fuel (HFO/gas). The project Value: $ 300 Million
comprises a flexible reciprocating engine power plant with a
Contract Type: Consultancy
number of multiple units installed in a row and will be of a
minimum and maximum 50 units (generating sets) of
identical capacity. The project will be let on a
build-own-operate or a build-operate-transfer basis, and with Project Status: Tendering & Bidding
a 20-25-year investment period.

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 2 of 19 - www.the-eic.com


Startup Year 2012
Project Category: Power
Scopes: Gas Fired Power Plant

Project Updated: 2/18/2010

Project Locations
Country Locality Location Comment
Syria Damascus (Sy) Al-Nasserieh

Operators

The Public Establishment for Electricity


Syria, Damascus,
Generation PEEGT Contracts
and Transmission (PEEGT) Contacts:
Dept, Mazzah-17 Hisham Mashfej, Director General - Contracts Department, +96 311
2119040, dg@peegt.gov.sy, PEEGT Contracts Dept, Mazzah-17,
Damascus, Syria

Bidders

Marafeq Shortlisted bidder with Wartsila.


Cham Holding

Kharafi National

Wartsila Shortlisted bidder with Marafeq.

Terna Energy Shortlisted bidder.

BidderHistory

Creative Energy Resources Submitted prequalification documents to build power plant.

Kanan Trading Submitted prequalification documents to build power plant.

Escous Energy Submitted prequalification documents to build power plant.

Project Notes
Feb 10 PEEGT is currently inviting expressions of interest (EoI) from technical consultants to advise
on the independent power project. Companies have until 24 February to submit EoI. PEEGT is
expected to call for EoI from legal advisers in the next three weeks.
Nov 09 PEEGT has delayed issuing the request for proposals for the project to allow the World Banks
International Finance Corp more time to review the project.
Nov 09 Understand that the consortium of Marafeq and Wartsila are the favourites to win the BOT
contract.
Sep 09 PEEGT has shortlisted two groups to develop the power plant. Companies shortlisted are
Marafeq, a joint venture of Cham Holding and Kharafi National, with Wartsila; and Terna
Energy. A request for proposals is expected to issued in October. The winning developer will
own 50% equity of the plant and the remaining 50% interest is to be listed on the Damascus
Securities Exchange.

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 3 of 19 - www.the-eic.com


Active
Al-Shaeer and Al-Shareefa Gas Fields and (Ebla) Gas Treatment Plant
At a Glance
Gas field development and treatment plant. The plant will be Tracking Status: Active
built in the Ash Shaer field between Homs and Palmyra, and Value: $ 660 Million
will be designed to produce 88 MMcf/ d of sales gas and 150
Contract Type: Pre FEED/Preliminary Design &
metric tons per day of LPG and to handle associated
Engineering
condensate. The gas and condensate will be fed into the
Syrian pipeline grid, and LPG will be transported via tankers.
The Ash Shaer and Cherrife fields are currently estimated to Project Status: Contract Awarded
hold reserves of 14.1 billion cubic metres of natural gas, or
83 million barrels of oil equivalent. Petro Canada plans to
Startup Year 2010
carry out field appraisal work to identify upside, which could
Project Category: Upstream
double the reserves estimate. The operator has a longterm
Scopes: Onshore Oil & Gas Field
capital expenditure plan of $460 million-$660 million,
Gas Processing / Treatment
depending on the life-of-field production. The contract, for the
Ash Shaer and Cherrife fields, calls for the construction of a
main processing facility, including a gas treatment plant, and
the laying of pipelines.

Project Updated: 3/25/2009

Project Locations
Country Locality Location Comment
Syria Hims Province (SY) Near Palmyra

Operators

Suncor Energy Inc Operator and 90% Interest


Canada, Alberta, P.O. Box 2844

Marathon 10% stake

Contractors

Aker Solutions Carried out conceptual study and pre-feasibility study.


Suite #300, 6835 Railway Street S.E.
Calgary, Alberta, T2H 2V6,
Canada
Tel: +1 403 640 4230
Fax: +1 403 252 1186
Kværner Engineering - (Abu Dhabi),
Abdullah Darwish Building
Visit Address:
2nd floor,
Gulf Business Centre;
Salam cor. Hamdan Streets

Postal Address:
P.O.Box 47825
Abu Dhabi
United Arab Emirates
Tel: +971-2-6767815
fax: +971-2-6712199
web: www.akerkvaerner.com

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 4 of 19 - www.the-eic.com


Saipem SpA Carried out FEED.
Snamprogetti Abu Dhabi Branch
Al Yasat Tower - 8th Floor, Suite N° 803
Najda Street
P.O. Box 2580
Abu Dhabi, U.A.E.
Mr. Antonio Ierna (U.A.E. Chief Representative)
Tel. +971 2 - 678 0122
Fax +971 2 - 678 0253
Web: www.snamprogetti.it/
Likely to bid for EPC.

Bidders

Petrofac Has EPC contract.


Engineering & Construction
Al Soor Street
PO Box 23467
Sharjah
United Arab Emirates
T: +971 6574 0999
F: +971 6574 0099
Web: www.petrofac.com/

Chester House
76-86 Chertsey Road
Woking
Surrey GU21 5BJ
United Kingdom
T: +44 1483 738 500
F: +44 1483 738 501

Project Notes
Mar 09 Suncor Energy Inc. plans to buy Petro-Canada. The purchase is subject to approval by the
shareholders for both companies and Canadian regulators.
Apr 08 Petrofac has won a contract to build the gas treatment plant. The award is worth $477 million
and is a lump-sum contract. The two firms have agreed in principle that Petrofac should buy a
10% stake in the Ebla PSC, subject to Syrian government approval. The initial deal, which will
last just over two years, covers all associated facilities and infrastructure, including
engineering, procurement and construction, commissioning and start-up assistance of the gas
treatment plant, pipelines, gas gathering station flow lines and well sites.
Dec 07 Petro-Canada is due to issue a tender by the end of March for an estimated $150 million EPC
contract for the construction of a main processing facility, including a gas treatment plant, and
the laying of pipelines. The facility will have an initial capacity of 2.3 million cubic metres per
day, which is planned to be increased at a later stage to over 4.2 mcm per day. The Calgary
office of Aker Kvaerner has completed the conceptual study and a pre-feasibility contract.
Snamprogetti has recently carried out the FEED package. Prospective bidders for the
16-month contract include Petrofac International, Alstom and Snamprogetti. The Ash Shaer
and Cherrife fields are currently estimated to hold reserves of 14.1 billion cubic metres of
natural gas, or 83 million barrels of oil equivalent. Petro-Canada plans to carry out field
appraisal work to identify upside, which could double the reserves estimate. The operator has
a longterm capital expenditure plan of $460 million-$660 million, depending on the life-of-field
production.
Oct 07 Bids are due out during Q4. Understand a Snamprogetti subsidiary based in Basingstoke
called OPE is doing some FEED work which may be a follow on from Aker Kvaerner carrying
out the pre-FEED.

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 5 of 19 - www.the-eic.com


Arab (Egypt-Jordan-Syria-Turkey) Gas Pipeline Active

At a Glance
370km pipeline from Aqaba to Samra and Rehab power Tracking Status: Active
stations. Value: $ 700 Million
Contract Type: EPC (Engineering, Procurement
Phase 2: Egypt, Syria and Turkey have agreed to extend the
& Construction)
Arab Gas Pipeline. The three countries will set a company to
carry out the extension from the Jordan/Syria Border. 1st
delivery is expected in March 2007. The plan is to construct a Project Status: Contract Awarded
324km line from the Jordanian border to the Al-Rayan area
east of Homs, and a branch to a power plant in Deir Ali. The
Startup Year 2010
Project, implemented on three phases aims at transporting
Project Category: Mid-Stream
and marketing the Egyptian gas to Jordan in its first and
Scopes: Pipeline
second phases, then crossing into Lebanon and Turkey as
well as other European countries through Syria in its third
phase.

Phase 3: a 62 km pipeline between the northern Syrian city


of Aleppo and Kilis in southeast Turkey. The line will connect
the existing gas transmission network of the two countries
and allow for the export to Turkey of Egyptian gas via the
already constructed line through Jordan, which is linked to
Syria’s existing transmission infrastructure.

When complete, the 10 bcm per year AGP will stretch 1,200
km from El Arish, in Egypt, to the Turkish border town of
Kilis. The total cost of the project is estimated at US$1.2
billion.

Project Updated: 11/12/2009

Project Locations
Country Locality Location Comment
Egypt Shamal Sina (EG) Al-Arish
Egypt Janub Sina (South Sinai) Taba
Governate (EG)
Jordan Al-Aqabah (JO) Aqaba
Jordan Al Mafraq (Jo) Rehab Power Station
Jordan Zarqa Province (JO) Samra
Syria Rif Dimashq Province (SY) Deir Ali
Syria Aleppo Province (SY) Aleppo
Syria Hims Province (SY) Al-Rayan area
Turkey Kilis Province (TR) Kilis

Operators

Egypt Ministry of Energy and Mineral Jordan Contact for developers


Resources Azmi Al-Said Khreisat 00 962 65863326
Fax 00 962 65865714
Developers for Jordan Section

Contractors

ENPPI (Engineering for the Petroleum and


Process Industries)

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 6 of 19 - www.the-eic.com


together with Egypt Holdings Gas Co, Petrojet and GASCO
has won BOOT contract for the pipeline.
Group has also won tender to construct Jordanian seciton of
the pipeline.
Egypt and Petrojet who are building the egyptian sector of the
project

Al-Sharq Gas will be building Egyptian section of the pipeline to the Red Sea

Allseas has contract for installation of subsea section

Penspen Group to undertake El-Arish engineering design


United Kingdom, Richmond, 3 Water
Lane

Stroitransgas To build the Aleppo to Turkey section.

Project Notes
Jul 09 Turkey and Syria have agreed to construct the final section of the Egypt-to- Turkey pipeline by
the end of 2010, allowing the possible export of Egyptian gas to Turkey and its transit to
Europe via the planned Nabucco gas pipeline. The agreement covers the construction of a 62
km section of line from Aleppo to theTurkish border and a second section of around 90 km
from the border to connect with Turkey’s existing gas transmission infrastructure at Kilis.
Oct 08 Stroitransgas has inked a deal with Syrian Gas Co. to build a gas pipeline from the northern
Syrian city of Aleppo to the Turkish border. The $71 million contract entails building the 62 km
line over the next 18 months.
Apr 08 Commercial volumes of gas will start flowing from Egypt to Syria on March 10. Testing of the
pipeline from Al-Arish in Egypt to Deir Ali in Syria was completed. Supplies through the pipeline
will gradually rise from 90 MMcm/yr to a maximum of 2 Bcm. The pipeline will eventually
extend to Turkey as early as the second-half of 2009 and eventually supply the European
Union through the Nabucco pipeline link.
Mar 08 Egyptian natural gas is due to arrive in Syria on 21 March via the Arab Gas Pipeline. Imports to
Syria will begin at a rate of 2.5 million cubic metres per day (912 mcm per year. A spur pipeline
from the Syrian section of the pipeline will begin to deliver Egyptian gas to Lebanon by
mid-2008. Bidding for the 62 km-section in Syria, from Aleppo to Kilis, has yet to start, but
construction is expected to take 18 months once a contract is awarded.

Banias Refinery Revamp Active

At a Glance
Modernisation and reconstruction project. The refinery was Tracking Status: Active
originally built in 1980 with a 155,000 bpd capacity of heavy Value: $ 1,000 Million
and light oils. The EPC includes a desulphurisation unit,
Contract Type: EPC (Engineering, Procurement
visbreaker, hydrocracker and related facilities. It will also
& Construction)
cover a Vacuum distillation unit (VDU) to improve gas-oil
production. 400,000 tpa bitumen plant.
Project Status: Tendering & Bidding

Startup Year 2009


Project Category: Downstream
Scopes: Refinery

Project Updated: 8/25/2009

Project Locations

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 7 of 19 - www.the-eic.com


Country Locality Location Comment
Syria Tartus Province (Sy) Banias

Operators

Syria Petroleum & Mineral Resources on behalf of:


Ministry (PMRC)
Banias Refinery Company (BRC) Banias Refinery Building
Banias Area
P.O. Box 26
Banias/Syria
Tel:+963 43-711100
+963 43-717950
Fax:+963 43-712325
www.brc-sy.com/english/index.html

Contractors

Beicip-Franlab carried out FEED


France, Paris, 232, Avenue Napoléon
Bonaparte
TechnoExport (TEX) - CZ Has contract for Vacuum Distillation unit.
Syria, Damascus, Ali Ben Abi Taleb Contacts:
Str. Body. 5 Hakim Abdulla, Country Manager - Syria, (+963) 11 2125813,
TexDamas@net.sy

Bidders

Industrial-Export SA EPC prequalified

China National Petroleum Corp (CNPC) EPC prequalified

Stroytransgaz bidder for the EPC

Project Notes
Nov 07 The results of tender to rebuild the Banias oil refinery will be announced on January 5, 2008. In
total six companies are bidding for the project.
Oct 07 Stroytransgaz plans to bid in a tender on reconstruction of an oil refinery at Banias. The tender
was announced in 2006 but was postponed several times due to financing difficulties. Syria
wants the contractor to finance approximately $1 billion of the reconstruction costs, to be
repaid later. Six other firms are reported to be bidding in the tender. It is not clear yet when the
results would be announced.
Apr 07 Engineers India Limited (EIL) specifically expressed interest in participating in the upcoming
Banias Refinery upgradation project for providing PMC services. Syrian side agreed to provide
details of the project, companies working on the tender for Banias Refinery Upgradation
project for maximizing gasoline and gas oil production.
Mar 07 Banias Refinery Company has issued a tender for the supply and installation of gas lift blowers
for the refinery.

Brig Gas Discovery Active

At a Glance

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 8 of 19 - www.the-eic.com


The new gas discovery was found in Brig 100 kilometres Tracking Status: Active
north of Damascus. The first well, flowed at a rate of 280,000 Value: $ 250 Million
cubic metres per day. Initial reserves estimates are 5 billion
Contract Type: Exploration
cubic metres.

Project Status: Drilling & Appraisal

Startup Year 2013


Project Category: Upstream
Scopes: Onshore Gas Field

Project Updated: 10/30/2006

Project Locations
Country Locality Location Comment
Syria Damascus (Sy) Brig, North of Damascus

Operators

Syrian Petroleum Company (SPC) Damascus, Al-Mutanabbi St.


P.O.Box: 2849.
Tel: 963 11 2227007 / 2314850
Fax: 963 11 2225648 / 2225643
E-mail: spccom2Dir@net.sy
E-mail: spc@spc-sy.com

Project Notes
Oct 06 Depending on the results of the next two planned probes, SPC may widen exploration and
appraisal drilling to better determine the size of the find.
Oct 06 SPC plans to drill one well on each block.

Deir Ali Power Plant Expansion Active

At a Glance
Construction of a gas fired power plant with a minimum Tracking Status: Active
capacity of 700MWe. Value: $ 880 Million
Contract Type: EPC (Engineering, Procurement
& Construction)

Project Status: Contract Awarded

Startup Year 2012


Project Category: Power
Scopes: Gas Fired Power Plant

Project Updated: 2/7/2010

Project Locations
Country Locality Location Comment
Syria Damascus (Sy) Damascus

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 9 of 19 - www.the-eic.com


Operators

The Public Establishment for Electricity


Syria, Damascus,
Generation PEEGT Contracts
and Transmission (PEEGT)
Dept, Mazzah-17

Contractors

Metka Awarded EPC contract in consortium with Ansaldo.


Greece, Athens, 14121 N. Iraklio

Ansaldo Awarded EPC contract in consortium with Metka.


Italy, Via Nicola Lorenzi, 8

Project Notes
Feb 10 Construction of the power plant expansion has started.

Deir al-Zor CCGT Plant Active

At a Glance
Construction of a combined cycle plant located in the North Tracking Status: Active
East of Syria, approximately 36km south of Damascus. Plant Value: $ 550 Million
to comprise 2 off 250MWe GT's and 1 off 250MWe ST. The
Contract Type: EPC (Engineering, Procurement
plant will require a 15km water pipeline supply from the
& Construction)
Euphrates.

Project Status: Contract Awarded

Startup Year 2010


Project Category: Power
Scopes: Combined Cycle Power Plant (CCPP)

Project Updated: 2/23/2009

Project Locations
Country Locality Location Comment
Syria Muhafazat Dimashq (Sy) Deir Ezor, NE Syria

Operators

The Public Establishment for Electricity Contact : Mr Amin Sabbagh


Generation and Transmission (PEEGT) Commercial Officer
British Embassy
PO Box 37
Kotob Building
11, Mhd Kurd Ali Street,
Malki
Damascus
Syria
Tel : +963 11 373 9241
Fax : +963 11 373 1600
email : amin.sabbagh@fco.gov.uk

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 10 of 19 - www.the-eic.com


Hisham Mashfej (Gen Director Engineering)
PEEGT Contracts Dept.
Mazzah-17,
Nissan Street,
Damascus.
Syria
Tel : +963 112 129 795
Fax : +963 112 229 062

Contractors

MVV Consulting Awarded tender evaluation contract.


Contact :
MVV Energie AG
Luisenring 49,
68159 Mannheim
Germany

Alstom In partnership with Iberdrola


Alstom Syria
PO. Box 17108
Jebel Ali, Dubai
Syria
Tel : +971 4 883 8008
Fax : +971 4 883 8055
Contact :
Einer Seines
Alstom Power France
quai Michelet
Levallois Perret
Paris 92309
France
Tel : + 33 (0) 1 41 49 38 35
Fax : + 33 (0) 1 41 49 38 86

Iberdrola In partnership with Alstom


Head Office :
Cardenal Gardoqui, 8
48008 Bilbao
Spain
Tel : +34 944 151 411
Fax : +34 944 154 579

Project Notes
Nov 07 There are obviously ongoing difficulties relating to this and other power projects in Syria. The
previous award to Alstom / Iberdrola does not seem to have been cemented and another
OJEU notice (202/2007 244564-2007) has been issued relating to design, manufacture,
supply, testing and commissioning of a CCPP plant. Closing date is set at 15th January 2008.
Hisham Mashfej is the named contact at PEEGT.
Mar 06 The Iberdrola / Alstom partnership has been selected for the $520 million EPC contract. An LoI
to confirm is expected by late March.
Dec 05 Preferred bidder status should be announced by end of December.
Nov 05 Evaluation is still ongoing with a decision now expected by mid December.

Hayan Block LPG Project (Jihar & Mahr Fields) and Palmyra Gas Active
Treatment Plant

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 11 of 19 - www.the-eic.com


At a Glance
Gas treatment plant with a capacity of 3.5 millio cm/d, to Tracking Status: Active
include an LPG plant. The plant will process gas from the Value: $ 424 Million
Jihar and Al-Mahr fields, northwest of Palmyra. The scope of
Contract Type: EPCC (Engineering,
work includes a gas treatment plant at Jihar, a gathering
Procurement, Construction &
system and gas collecting point at Al-Mahr, a gathering
Commissioning)
system and satellite gathering station at Jihar and transport
pipelines connecting the Jihar plant to the gas collecting point Project Status: Contract Awarded
at Al-Mahr. Gas will be for the domestic market. The Gas
plant will treat 3.5 million cubic metre per day. First gas from
Startup Year 2010
field is due early 2009. Combined production from all the
Project Category: Downstream
Hayan fields is expected to reach 5 MMcmd in future.
Scopes: LPG

Project Updated: 2/14/2010

Project Locations
Country Locality Location Comment
Syria Muhafazat Halab Region (SY) Hayan (250km NE
Damascas)

Operators

INA Naftaplin Hayan Petroleum Company (mostly owned by INA Naftaplin)


Croatia, Zagreb, Avenija Veceslava
Holjevca 10
Syrian Petroleum Company (SPC) 50% stake in the Hayan Block
Syria, Damascus, Dummar Province
Expansion Square

Contractors

ENPPI (Engineering for the Petroleum and


Egypt,
Process Cairo, 1 “A” Ahmed El-Zomor
Industries)
Street, 8th District,
Petrofac Awarded EPCC contract
UAE, Abu Dhabi, Mohamed Bin
Zayed City
Able Instruments & Controls Ltd Awarded equipment supply contract
England, Reading, Cutbush Park,
Danehill, Lower Earley

Project Notes
Feb 10 According to the oil ministry, the gas treatment plant will begin operation in December 2010,
producing around 2.7 million cubic meters of clean gas, 5000 barrels of natural gas
condensate, and 180,000 tons of cooking gas.
Jan 10 Able Instruments & Controls Ltd has been awarded an equipment contract to supply radar
level transmitters to Petrofac for the second and third phase separator levels, LPG mounted
bullets and drain vessels for the oil and gas field development and processing project.

Homs Refinery - Vacuum Distillation Units (VDU's) Active

At a Glance

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 12 of 19 - www.the-eic.com


Syria's first refinery built in 1959, with a 107,000 bpd Tracking Status: Active
capacity, handling a mixed feedstock of heavy and light oil. Value: $ 20 Million
Turnkey contract to supply six atmospheric VDU's.
Contract Type: EPC (Engineering, Procurement
& Construction)

Project Status: Tendering & Bidding

Startup Year 2008


Project Category: Downstream
Scopes: Refinery

Project Updated: 8/24/2007

Project Locations
Country Locality Location Comment
Syria Hims Province (SY) Homs

Operators

Homs Refinery Company (HOC)

Contractors

Namvaran Engineering & Management Has carried out FEED.

TechnoExport (TEX) - CZ EPC bidder

Namvaran Engineering & Management EPC bidder

Project Notes
May 06 HRC has extended the bid deadline for the contract to supply and install VDU's to the end of
May - bidders as above.
Mar 06 Technical and commercial proposals have been invited by 25 April for the turnkey contract
covering six VDU's - bidders include TechnoExport and Namvaran.

Iraq (Kirkuk) to Syria (Banias) Export Pipeline Active

At a Glance
Project to rehabilitate a pipeline linking Iraq’s Kirkuk oil fields Tracking Status: Active
and the Syrian export terminal at Banias. In January 2005, Value: $ 350 Million
Stroitransgas and Total finished a joint study concerning the
Contract Type: EPC (Engineering, Procurement
possible construction of a 1.4 million b/d, 500 km oil pipeline
& Construction)
linking Iraqi oil fields to Banias to replace the Kirkuk-Banias
line, which was in poor condition before it was shut down in
2003 following the US-led invasion. American opposition to Project Status: Tendering & Bidding
an Iraqi crude export route through Syria is said to have
slowed the project. The pipeline was built in the 1950s by the
Startup Year 2011
Iraq Petroleum Co. to export a maximum of around 700,000
Project Category: Mid-Stream
b/d via Syria to the Mediterranean coast.
Scopes: Pipeline

Project Updated: 4/22/2009

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 13 of 19 - www.the-eic.com


Project Locations
Country Locality Location Comment
Iraq Kurdistan (Iq) Kirkuk
Syria Tartus Province (Sy) Banias

Operators

Government of Iraq

Stroytransgaz

BidderHistory

Stroytransgaz Originally awarded EPC contract

Project Notes
Apr 09 Iraq is seeking offers from foreign companies to rehabilitate the oil pipeline after a Russian
firm failed to do the job, an Oil Ministry spokesman said. Russian firm Stroytransgaz signed a
protocol with Iraq to reactivate the oil export pipeline last March. However, it is not clear if it
signed a formal contract and ministry did not identify the company it was talking about.
Mar 08 Stroitransgas has signed a deal with Iraq to rehabilitate the oil export pipeline.
Jan 08 Stroitransgas is in renewed negotiations with Baghdad to rehabilitate a pipeline linking Iraq’s
Kirkuk oil fields and the Syrian export terminal at Banias. The Russian company, the Iraqi oil
ministry and Iraqi North Oil Co. are currently discussing Stroitransgas’ participation in the
reconstruction of the Kirkuk-Banias export pipeline, Stroitransgas says, with the next round of
talks is scheduled for the second half of January. Iraqi and Syrian officials signed an
agreement in Damascus on Dec. 17 to revive efforts to open the Kirkuk-Banias pipeline and
are encouraging engineering companies to submit tenders for the project.

Jandar Combined Cycle Power Plant Active

At a Glance
Construction of a 450MWe combined cycle power plant to be Tracking Status: Active
located in west Syria. The project is an expansion of the Value: $ 352 Million
existing 700MWe Jandar power plant.
Contract Type: Consultancy

Project Status: Tendering & Bidding

Startup Year 2012


Project Category: Power
Scopes: Combined Cycle Power Plant (CCPP)

Project Updated: 2/16/2010

Project Locations
Country Locality Location Comment
Syria Hims Province (SY) Jandar

Operators

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 14 of 19 - www.the-eic.com


The Public Establishment for Electricity
Syria, Damascus,
Generation PEEGT Contracts
and Transmission (PEEGT)
Dept, Mazzah-17

Contractors

Iran Power Plant Project Management Awarded EPC contract.


Iran, Tehran,
Company (Mapna)No. 231, Corner of
Kajor Ally

Project Notes
Feb 10 PEEGT is inviting bids for the provision of consultancy services for the project. The scope of
work will include: approval on the drawings, supervision on execution of civil, mechanical and
electrical works and instruments, attendance of the tests, commissioning, acceptance and
attendance of factory tests, and supervision on manufacturing; supervision during the
guarantee period on operation, maintenance and training; and training of personnel. Bids are
due to be submitted by 13 April 2010.
Dec 09 Mapna has been awarded the EPC contract for the combined cycle power plant. The contract
is understood to be valued €240 million.

North Middle Area Gas Project (NMAGP), Gas Treatment Plant Active

At a Glance
Gas treatment plant with a capacity of 105-140 million cf/d. Tracking Status: Active
Value: $ 200 Million
Contract Type: EPIC (Engineering,
Procurement, Installation &
Commissioning)
Project Status: Contract Awarded

Startup Year 2009


Project Category: Downstream
Scopes: Gas Gathering

Project Updated: 11/1/2007

Project Locations
Country Locality Location Comment
Syria Hims Province (SY) near Palmyra

Operators

Syrian Gas Company (SGC) PO Box 4499


Damascas
Syria
Tel: 00963 31 451925
Fax: 00963 31 451933
Tel: +963 31-3735525
Fax: +963 31-3735535
Web: www.sgc.gov.sy

Contractors

Stroytransgaz

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 15 of 19 - www.the-eic.com


29 Moskovskaya Str.
Orel, 302030
Russia
POST:
65 Novocheremoushinskaya Str
Moscow 117418
Russia
Tel: +7 095 332 79 41
Fax: +7 095 363 94 95
Web: www.stroytransgaz.ru
Have the EPIC.

Project Notes
Nov 07 Stroitransgaz will soon begin building the gas treatment plant. The contract to build the plant
has already been ratified by the Syrian government and was awarded to Stroitransgaz on a
non-competitive basis.
Apr 07 Stroytransgaz has an agreement in principle was achieved regarding the construction of the
Northern Gas Treatment Plant in the central region with an initial capacity of 3 million cubic
metres per day (around 1 bcm per year) with the possibility to increase this.
Oct 06 The Oil Ministry is in the process of issuing an international tender for a new gas processing
plant that will add a further 3 MMcmd under the NMAGP.
Jun 06 Syria is in discussion with Stroytransgaz for the contract to build a gas treatment plant as part
of the NMAGP. The Russian company has the EPIC contract to build a similar plant in the
south (SMAGP). If the direct negotiations fail, the project will go out to tender.

Onshore Wind Farm Al-Sukhna Active

At a Glance
Development of an onshore wind farm which is to have Tracking Status: Active
capacity of between 50 and 100MW. The project will be Value: $ 200 Million
located 70km east of Palmrya and 50 km south of
Contract Type: BOO (Build Own Operate)
Damascus. The project will be implemented on a
build-own-operate or build-operate-transfer basis for a period
of 20-25 years.
Project Status: Prequalification

Startup Year 2013


Project Category: Renewables
Scopes: Wind Farm (Onshore)

Project Updated: 2/5/2010

Project Locations
Country Locality Location Comment
Syria Damascus (Sy) Al-Sukhna, 70km east of
Palmyra

Operators

The Public Establishment for Electricity


Syria, Damascus,
Generation PEEGT Contracts
and Transmission (PEEGT)
Dept, Mazzah-17

Project Notes

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 16 of 19 - www.the-eic.com


Feb 10 PEEGT is currently inviting bids for the consultancy contract. The consultant is to advise on
the wind farm project and will also supervise the bidding process. Bids are due to be submitted
by 3 March.
Jan 10 The deadline for prequalification bids to be submitted has been extended until 28 February.
Nov 09 The Public Establishment for Electricity Generation & Transmission is currently inviting
companies to prequalify to develop the onshore wind farm. Prequalification documents are due
to be submitted by 25 January 2010.

Sweidieh Development Project, Al Hassake Oil Fields Active

At a Glance
Construction of 3 identical Oil Gathering and Transportation Tracking Status: Active
Stations (GTS) with suitable number of remote Test Stations Value: $ 500 Million
(RTS) and all the necessary pipelines networks and facilities.
Contract Type: EPC (Engineering, Procurement
The project facilities shall significantly increase the oil
& Construction)
production rate by 37,000 – 111,000 b/d from the massive
formation in Sweidieh oil field. Also, an amount of
approximately 3-9 MSCFD of associated gas shall be Project Status: Planning
produced. Oil and associated gases shall be separated from
the associated formation water. The scope includes a study
Startup Year 2012
and design the GTS’s and their associated RTS’s with all the
Project Category: Downstream
interconnected flow lines from TRS’s to GTS’s, oil transfer
Scopes: Pipeline
pipelines to Tel Addas, gas pipelines to gas plant and water
Storage & Distribution
injection lines to the injection wells. The purpose of this
project is to separate oil; water and
associated gases then transport each product in order to
optimize their utilization.

Project Updated: 6/4/2009

Project Locations
Country Locality Location Comment
Syria As Suwayda Province (SY) Sweidieh

Operators

Syrian Petroleum Company (SPC)


Dummar Province Expransion Square

Bidders

INA Naftaplin Possible bidder for EPC contract.


Croatia, Avenija Veceslava Holjevca
10
Stroytransgaz Possible bidder for EPC contract.
Russia, 65 Novocheremoushinskaya
Str
United Arab Emirates, Abu Dhabi
Branch office

Project Notes
Jun 09 Member feedback: Understand an EPC tender has been issued with Integrated Technical
Services Ltd., a member of INA Group, is bidding against StroyTransGas for this project.

Sweidieh Power Plant Active

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 17 of 19 - www.the-eic.com


At a Glance
Construction of a 450MWe gas fired single cycle turbine Tracking Status: Active
plant. The plant design will include an option for conversion Value: $ 375 Million
to combined cycle. Located in the north east region of Syria.
Contract Type: Feasibility Study

Project Status: Memorandum of Understanding


(MoU)

Startup Year 2009


Project Category: Power
Scopes: Gas Fired Power Plant

Project Updated: 3/3/2008

Project Locations
Country Locality Location Comment
Syria As Suwayda Province (SY) Sweidieh

Operators

Azarab Energy Industries No. 68, Derakhshan St,


North Zarafashan Ave.
Eyvanak Boulevard, Phase 4,
Shahrak Gharb.
Tehran.
Iran
Tel : +98 (21) 8857 49 50-9
Fax : +98 (21) 8857 51 11-2
Overseas Purchasing & Procurement :
overseaspurchasing@azarabenergy.com
Tel : +98 (21) 8857 49 80
Subcontractors :
subcontractors@azarabenergy.com
Tel : +98 (21) 8857 49 85
http://www.azarabenergy.com/

Project Notes
Jul 07 PEEGT is close to finalizing a financial deal with Azarab. An ECA is under negotiation with
signing expected any day now and a licence to implement the IPP financially has been
granted.
Jan 07 First round negotiations with PEEGT will commence in February. Azarab is expected to invest
$378 million based on a 25 year PPA with PEEGT.
Jul 06 Azarab has signed an MoU with PEEGT to construct the plant on a Build Own Operate (BOO)
model to bring about the first IPP in Syria. An Energy Conversion Agreement (ECA) must still
be negotiated.

Tishreen Power Plant Expansion Active

At a Glance
Construction of a 400MWe power plant expansion project. Tracking Status: Active
The project will comprise of two x 200MWe units. Value: $ 445 Million

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 18 of 19 - www.the-eic.com


Contract Type: EPC (Engineering, Procurement
& Construction)

Project Status: Contract Awarded

Startup Year 2012


Project Category: Power
Scopes: Power Plant

Project Updated: 11/5/2009

Project Locations
Country Locality Location Comment
Syria Latakia Province (SY) Tishreen

Operators

The Public Establishment for Electricity


Syria, Damascus,
Generation PEEGT Contracts
and Transmission (PEEGT) Contacts:
Dept, Mazzah-17 Hisham Mashfej, Director General - Contracts Department, +96 311
2119040, dg@peegt.gov.sy, PEEGT Contracts Dept, Mazzah-17,
Damascus, Syria

Contractors

Bharat Heavy Electricals Limited (BHEL) Awarded EPC contract.


India, New Delhi, Siri Fort

Project Notes
Nov 09 Iran Power Plant Projects Managements Co. will launch the first phase of Tishreen power
plant. Over 77% of the power plant's working operations have been completed and its first
phase is set to be launched by the Iranian engineers within the next two months.
Oct 09 BHEL has formally signed the $445 million EPC contract with Public Establishment for
Electricity Generation and Transmission (PEEGT).
Aug 09 PEEGT is inviting companies to bid for a consultancy contract. The contract covers the
approval of drawings, supervision of the execution of civil, mechanical and electrical works,
attendance of tests and commissioning. Bids are due to be submitted by 12 October.

Produced for: spijkersj - Turck on 24 Feb 2010


Use this information with care; in particular, you must not pass it on to EIC non-members or reveal its source.

Copyright © Energy Industries Council - Page 19 of 19 - www.the-eic.com

You might also like