Warships Forecast
ARCHIVED REPORT
                        For data and forecasts on current programs please visit
                         www.forecastinternational.com or call +1 203.426.0800
Agosta-90B
Outlook
   Last Pakistani Agosta-90B commissioned in September 2008
   Pakistan Navy has opted for Type 214 as its next submarine
   No other sales prospects
   Agosta-90B no longer being promoted on the market
   Future sales efforts are concentrating on Scorpene
                                               Orientation
Description. Diesel-electric patrol/attack submarine           Status. In service.
(SSK).
                                                               Total Produced. Three completed.
Sponsor
Direction des Construction Navales (DCN) International
  10 Rue Sextius Michel
  F-75015 Paris
  France
  Tel: + 33 1 4059 5000
  Fax: + 33 1 4059 5408
Pennant List
Name                           Builder                                  Launch Date                 Commission Date
S-137 Khalid                   DCN, Cherbourg (France)                  8/8/1998                    9/13/1999
S-138 Saad                     DCN, Cherbourg/Karachi DY                8/2002                      12/12/2003
S-139 Hamza                    Karachi Dockyard                         9/2006                      9/2008
Mission.       Anti-submarine and anti-surface ship            Price Range. Based on the publicized contract value,
warfare, special operations and intelligence gathering.        the price of a single unit is roughly $320 million.
                                              Contractors
Prime
DCNS                                http://www.dcns.fr, 2, rue Sextius Michel, Paris, 75732 France, Tel: + 33 1 40 59 50 00,
                                    Fax: + 33 1 40 59 56 48, Email: info@dcn.fr, Prime
                                        ©2009                                                                      July 2009
Page 2                                                                                                                    Warships Forecast
Agosta-90B
Thales Naval France                         http://www.thalesgroup.com/naval, 7-9 rue des Mathurins, Bagneux, 92221 France,
                                            Tel: + 33 40 84 20 00, Fax: + 33 40 84 2915, Second Prime
  Subcontractor
Bainbridge International                    8, Flanders Park, Hedge End, Southampton, SO30 2FZ Hampshire, United Kingdom
                                            (Flame Retardant Protection Systems)
Calzoni Srl                                 http://www.calzonispa.com, Via Bargellino 25/A, Calderara di Reno, Bologna, 40012
                                            Italy, Tel: + 39 0514 1377, Fax: + 39 0514 1375 55, Email: calzoni@calzonispa.com
                                            (Hoistable Masts)
Compagnie Deutsch                           http://www.compagnie-deutsch.com, 65 ave de Colmar, Rueil-Malmaison, 92507 Cedex,
                                            France, Tel: + 33 155472550 (Cable Assemblies)
EPCOTS                                      http://www.epcots.fr/anglais/index.html, 66 Impasse Branly, Zone Industrielle BP99,
                                            Toulon, 83079 France, Tel: + 33 498 080000, Fax: + 33 498 080008 (Sound Isolation)
Eurotorp                                    http://www.eurotorp.com, 525 route des Dolines, Sophia Antipolis, 06903 France,
                                            Tel: + 33 4 92 96 38 50, Fax: + 33 4 92 96 38 55, Email: et@eurotorp.com (Torpedoes)
Hale Hamilton Valves UK Ltd                 http://www.halehamilton.com/, Cowley Rd, Uxbridge, UB8 2AF Middlesex, United
                                            Kingdom, Tel: + 44 0 1895 236525, Fax: + 44 0 1895 231407 (Valves)
L-3 Communications - ELAC-                  http://www.elac-nautik.de, Neufeldtstrasse, Kiel, 24118 Germany, Tel: + 49 431 883 0,
Nautik GmbH                                 Fax: + 49 431 883 496, Email: marketing@elac-nautik.com (Echosounders)
MAN B&W Diesel AG                           http://www.manbw.com, Stadtbachstrass 1, Augsburg, 86153 Germany,
                                            Tel: + 49 821 322 0, Fax: + 49 821 322 3382, Email: info@manbw.de (Diesel Engines)
SMAC                                        http://www.caoutchouc-elastomere-suspension.com/, 66 Impasse Branly, Zone
                                            Industrielle BP11966, Toulon, 83079 France, Tel: + 33 494 752488,
                                            Fax: + 33 494 4759499 (Rafting)
Thales Information Systems                  http://www.thalesgroup.com/security-services/, 66-68 Av Pierre Brossolette, Malakoff,
                                            92247 France, Tel: + 33 1 41 48 00 00, Fax: + 33 1 41 48 00 10 (Communication
                                            Equipment)
Thales Underwater Systems                   http://www.thalesgroup.com/naval, 525 Route Des Dolines, BP 157, Sophia Antipolis,
                                            06903 France, Tel: + 33 4 92 96 30 00, Fax: + 33 4 92 96 39 50, Email: TUS@thales-
                                            underwater.com (DSUV 62 Sonar)
 Comprehensive information on Contractors can be found in Forecast International’s “International Contractors” series. For a detailed description,
 go to www.forecastinternational.com (see Products & Samples/Governments & Industries) or call + 1 (203) 426-0800.
 Contractors are invited to submit updated information to Editor, International Contractors, Forecast International, 22 Commerce Road, Newtown,
 CT 06470, USA; rich.pettibone@forecast1.com
July 2009
Warships Forecast                                                                                       Page 3
                                                                                           Agosta-90B
                                           Technical Data
                                            Metric                              U.S.
Dimensions
Length                                      67.6 m                              221.7 ft
Beam                                        6.8 m                               22.3 ft
Draft                                       5.4 m                               17.7 ft
Height (keel to top of sail)                11.7 m                              38.5 ft
Displacement
Standard                                    1,270 tonnes                        1,250 tons
Surfaced                                    1,595 tonnes                        1,570 tons
Submerged                                   1,788 tonnes (2,082 with AIP)       1,760 tons (2,050)
Performance
Speed – Surfaced                            22 kmph                             12 kt
Speed – Submerged (max, 5 min)              37 kmph                             20 kt
Speed – Submerged (60 min)                  31 kmph                             17 kt
Range – Transit                             >18,500 km at 13 kph                >10,000 nm at 7 kt
Range – Snorting                            15,750 km at 17 kph                 8,500 nm at 9 kt
Range – Submerged                           650 km at 6.5 kph                   350 nm at 3.5 kt
Diving Depth                                350 m                               1,150 ft
Endurance                                   68 days                             68 days
Crew                                        36 (7 officers) + 6 spares          36 (7 officers) + 6 spares
Reverse Osmosis Capability (fresh water)    2 tonnes/day                        2 tons/day
                                            Type                                Number
Weaponry
Missiles                                    Exocet SM39 anti-ship               N/A (using torpedo tubes)
Torpedoes                                   F17P Mod 2                          16 (total including missiles)
Mines                                       Stonefish                           28 (alternative payload)
Torpedo Tubes                               550mm                               4
Electronics
Countermeasures: ESM                        Thales DR-3000U
Weapons Control Suite                       Thales Underwater Systems SUBTICS
                                            Mk 2
Radars
 Surface Search                             DRUA-33D Calypso                    1
Sonars                                      Eledone Suite
 Bow Array                                  DUUA-2B                             1
 Flank Array                                DUUA-1D                             1
 Distributed Passive Array                  DSUV-2H                             1
 Intercept Array                            DUUX-2A                             1
 Towed Array                                DSUV-62                             1
Periscopes
 Search                                     SOPELEM J 95                        1
 Attack                                     SOPELEM ST5 95                      1
Propulsion
Diesels                                     SEMT-Pielstick 16PA4V185G           2x 1,800 shp
Generators (alternators)                    N/A                                 2x 0.85 MW
Electric Propulsion Motor                   Jeumont Schneider                   1x 3,400 shp (2,200 kW)
                                      ©2009                                                          July 2009
Page 4                                                                                             Warships Forecast
Agosta-90B
                                              Type                                       Number
Creep-speed Motor                             N/A                                        1x 32 shp
Propeller                                     Single shaft                               1
N/A = Not Available.
Design Features. The Agosta-90B class is a direct             screen, multifunction color consoles for sonar analysis,
descendant of the French Agosta class submarine of the        command and control, and weapon management
1970s. It retains the original Agosta-70 double-hull          functions. The consoles are based on ruggedized
design but introduces significant improvements in the         PowerPC workstation hardware. The entire sonar suite
boat's acoustic discretion and its ability to detect other    of the submarine is integrated through SUBTICS, and
submarines.       The hydrodynamics of the hull, its          includes a clip-on towed array and an active array in
appendages, and the propeller have been optimized for         addition to the bow, ranging, and intercept arrays. The
maximum sound suppression.              Furthermore, the      SUBTICS combat suite has a distributed modular
propulsion machinery, diesel engines, and auxiliaries         architecture. It makes extensive use of commercial
are all rafted, contributing to the lower noise signature.    off-the-shelf (COTS) hardware and software standards.
                                                              These include high-speed RISC processors, the TCP/IP
The acoustic, optical, electromagnetic, and heat sensors
                                                              communications protocol, an X-Windows/Motif
have all been upgraded from the earlier Agosta series.
                                                              graphical user interface, and the UNIX operating
The hull has the same external dimensions, but is now
                                                              system.     The applications software is written in
built from high-tensile HLES 80 steel, providing deeper
                                                              C language, and the graphics function in C++.
diving capability. Meanwhile, the displacement has
increased slightly, to 1,570 tonnes (surfaced).               Operational Characteristics. The Agosta-90B has
                                                              greater endurance than the earlier Agosta versions,
Part of the increased range is attributable to the
                                                              along with a substantially improved propulsion source
new-design batteries supplied by CEAC. These consist
                                                              and better diving capability. When compared to
of two 160-cell units, and offer improved extended
                                                              conventional diesel-electric submarines, the MESMA
underwater performance.
                                                              AIP system is intended to provide up to five times
The 90B was the first export platform to utilize the          longer diving endurance. The longer endurance is
French air independent propulsion (AIP) system known          attributable to the fact that the batteries can be
as MESMA (Module d'Energie Sous-Marin Autonome).              recharged without having to go to snort mode. An
The system was developed by a team that consisted of          example of a typical mission profile for the submarine is
DCN and the French companies L'Air Liquide, Bertin,           a 40-day patrol mission at a speed of 4 knots, preceded
Framatome, and Technica-tome, plus the Spanish                by a 10-day outward transit period at a speed of 7 knots,
Navantia group. This AIP system is based on the               and followed by another 10-day transit period at 7 knots
closed-circuit combustion of ethanol and oxygen.              to return to the base. The range of intervention in such
MESMA couples a primary high-pressure, 60-bar                 a scenario would be 1,680 nautical miles.
combustion heat-generation loop with a secondary
                                                              Thanks to its higher degree of automation, the
Rankine thermodynamic loop.
                                                              Agosta-90B model is able to operate with fewer men,
The first and second boats of the series are scheduled to     and requires a crew of only 36 (7 officers and 29 senior
receive the AIP system as a retrofit at their first interim   and junior mates) as opposed to 54 on the original
upgrade. Until then, they will operate as traditional         Agostas. In the control room, for instance, the staffing
diesel-electric SSKs. The MESMA system will be                on each watch is down to nine from 13, including five in
fitted as a plug-in unit that also comprises the liquid       combat system watch (previously seven) and four in
oxygen and ethanol storage area, the steam module, and        platform management (down from six). Only one
a turbine for electrical power generation. The system is      roundsman and one plant watch are now needed for the
installed as new on the third boat of the class.              aft machinery spaces, as opposed to three on the old
                                                              Agostas.
The SUBTICS integrated submarine sonar, combat,
command, and weapons control suite features six twin-
                                       Variants/Upgrades
Agosta-70.      This is the original Agosta class             and another two to Pakistan. Pakistan's two Agostas
submarine introduced in the 1970s. Four of these were         were introduced into service in 1979 and 1980, and are
sold to the French Navy, four to the Spanish Armada,          still in use today. These original Agostas were lighter in
July 2009
Warships Forecast                                                                                           Page 5
                                                                                                Agosta-90B
displacement (1,490 tonnes surfaced) and noisier, and      Undersea endurance was reportedly up by nine days, to
had more primitive electronics and weapons systems         54, and the cruising range was up to 9,630 nautical
than the 90B models now being bought.                      miles at 8 knots, from the original Agosta's 8,500
                                                           nautical miles at 9 knots.
Agosta-80. This was an upgraded model from the
original Agosta, with a new propulsion system whose        Khalid. The name of the Agosta-90B class in the
output was 20 percent higher, at 4,200 kW. This model      Pakistan Navy.
also had a new type of battery that was recharged by
                                                           PNS Hamza. The third unit of the Khalid class, the
two 850-kW diesel-electric generators while in surface
                                                           PNS Hamza, is equipped with a MESMA AIP system
or snorkel mode. As a result, the submarine's maximum
                                                           that makes it less dependent on frequent surfacing for
cruising speed could be maintained for longer periods.
                                                           renewal of its oxygen stores.          Otherwise, the
The -80 was also specifically designed to house the        performance of the Hamza is similar to that of the other
SM39 ASuW missile and the F-17P torpedo. Thanks to         two. The new submarine's length has increased from 67
its smaller crew (45 versus 50), the Agosta-80 was able    to 76 meters, and the submerged displacement from
to remain submerged for longer periods than the original   1,760 tons to 2,050 tons. If successful, the air-
Agosta.      Additionally, the crew quarters of the        independent system is expected to expand the diving
Agosta-80 were generally superior to those on the          range and, more importantly, the submarine's ability to
original Agosta. Furthermore, the food-preparation         stay under water for extended periods of time. Some
machinery had been upgraded, and the submarine was         sources suggest that underwater endurance has tripled.
equipped with an air-conditioning system that allowed
operations in tropical climates.
                             Agosta-90B Class Submarine of the Pakistan Navy
                                                   Source: DCNI
                                        Program Review
                                       ©2009                                                             July 2009
Page 6                                                                                             Warships Forecast
Agosta-90B
Background. In 1991, Pakistan began negotiating               In short, the technology transfer has meant a major leap
with potential suppliers for delivery of up to three          forward for the shipbuilding capabilities of the region.
submarines to replace its aging Daphne class boats. The
                                                              In April 1997, Pakistan's chief of naval staff, Admiral
final bidders included France's DCN International along
                                                              Mansurul Haq, was dismissed by the country's Prime
with Sweden's Kockums, which offered the T-96 variant
                                                              Minister Nawaz Sharif. Although reportedly unrelated
of the A-19 Gotland model; Britain's MoD/Vickers
                                                              to the delivery schedule for the new Agostas, Haq's
Shipbuilding & Engineering Ltd team with its
                                                              dismissal was presumably in response to his
Upholders (taken from U.K. service); and China State
                                                              inappropriate involvement in the bidding process. The
Shipbuilding, with a modified version of the Project 033
                                                              dismissal followed weeks of growing scandal over
Romeo class boat.
                                                              alleged financial bungling and the launch of an
An order for a batch of three was officially signed in        investigation into a possible kickback scheme
Islamabad, Pakistan, on September 20, 1994, by                surrounding the submarines. Haq was believed to have
Pakistan's defense minister Aftab Shaban Mirani and his       been involved in the corruption scandal.
French colleague, François Leotard. It was reported that
                                                              At about the same time, the French government sent a
the decision to go with the French design was
                                                              French Navy Agosta class submarine on a promotional
substantially influenced by the fact that the French
                                                              tour of Southeast Asia. This road show was presumably
government had made both the MESMA AIP
                                                              intended to raise sales for French defense industry
technology and the SM39 anti-ship missiles available to
                                                              suppliers. On tour, the submarine La Praya carried both
this particular export client. Both are features that had
                                                              torpedoes and SM39 anti-ship missiles, plus a new color
not been available to any other Indian Ocean country.
                                                              flat-screen display and other more recent electronics
The combination of these two capabilities was said to
                                                              systems. The tour was extended to potential submarine
allow Pakistan to counter the Indian Navy, which
                                                              client countries in the region, Pakistan included.
operates aircraft carriers and maritime strike aircraft in
the region. In short, the equipment was chosen to                            First 90B Rolled Out
provide a cost-effective, anti-blockade deterrent against
possible actions by India in adjacent sea areas. At the       The first Agosta-90B submarine for Pakistan was rolled
time of the deal, the world press considered the sale a       out of the manufacturing plant at DCN in August 1998
shift in the region's power balance.                          and launched shortly thereafter. It was commissioned
                                                              into the Pakistan Navy as the PNS Khalid in September
                  Sold to Pakistan                            1999. The second boat was delivered to Pakistan in
                                                              three sections on board a freighter in May 1998, and
When the contract was awarded, it was also noted that
                                                              components for the third boat arrived in the fall of the
the deal would allow the French shipbuilding industry to
                                                              same year.
keep its submarine construction capability in an active
state, since that country's domestic programs were in a       A team of about 60 Pakistan Navy personnel was in
transitional phase. The contract was estimated to             residence in Cherbourg, France, during the construction
provide 3.5 million man-hours of work for DCN                 process to oversee all aspects of the contract. In 1998, a
facilities in Cherbourg, Indret, and Ruelle, as well as for   team of 15 to 20 engineers from DCN was dispatched to
other contractors including Thomson-CSF (now Thales)          the Pakistani shipyard to oversee the technology transfer
and Jeumont Schneider.                                        program.
The technology transfer arrangement, which is                 At the last minute, delivery of the first-in-class was
considered quite ambitious for Pakistan, stipulated that      delayed by a political protest by the French government
the first submarine should be built entirely in France,       in October 1999. Apparently dismayed by the bloodless
while the second would be assembled in Pakistan from          military coup in Pakistan on October 12, French
sections manufactured at the French company's                 authorities notified the departing submarine that its way
Cherbourg site. The third ship would be built entirely in     out of the naval base in Toulon (France) would be
Pakistan at the Karachi shipyard. The materials and           blocked. However, in an obvious move to sustain the
equipment for that one, too, would be supplied by DCN         diplomatic relations between the two countries, the
from France. Of the total contract sum, it is estimated       measures were lifted a few days later and the submarine
that $100 million will be spent to upgrade the Pakistan       was allowed to leave.
Navy's Karachi shipyard, and another $100 million to
                                                              The SM39 anti-ship missile has yet to be procured
purchase machine tools from France. In the process, the
                                                              under a separate contract. This relatively new missile
Karachi shipyard has been upgraded to and certified for
                                                              joins the Pakistan Navy's Sub-Harpoons, which were
the ISO 9002 international quality-assurance standards.
                                                              bought in the mid-1980s. The Indian Navy will be the
July 2009
Warships Forecast                                                                                                                  Page 7
                                                                                                                     Agosta-90B
first in the world to use submarine versions of both the               transferring the ship to another navy. By early May,
U.S. and the French weapons side by side.                              these reports had become refined to a Letter of
                                                                       Agreement between Malaysia and France for the
              First AIP System Shipped                                 construction of two Scorpene class submarines and the
The first production module of the MESMA system was                    loan of a single Agosta-70 class boat.
shipped to Karachi in 2000. It was installed on the last
                                                                                            Al-Qaeda Attacks
boat of the series following 12 months of land-based
testing at DCN Indret in France. However, the                          Pakistani construction of the two remaining Agosta
completion of the last boat in the Pakistani Agosta-90B                class submarines was delayed by about six months when
class was slipped to 2008, suggesting that the MESMA                   11 members of a DCN technical team were killed and
program may have suffered some minor delays.                           another 12 injured by a suicide car bombing in Karachi
                                                                       on May 8, 2002. Talking to reporters after meeting the
In June 2001, it was reported that the Malaysian Navy
                                                                       12 injured French citizens and visiting the scene of the
was negotiating with DCN International for the supply
                                                                       massive blast, newly appointed French Defense
of two ex-French Navy Agosta class submarines
                                                                       Minister Michele Alliot-Marie dismissed concerns the
(probably the now-decommissioned FNS La Praya and
                                                                       attack would damage bilateral relations between France
FNS Ouessant) and the subsequent construction of two
                                                                       and Pakistan and added that "the current agreements
to four Agosta-90B class submarines over the next five
                                                                       will be pursued," referring to the cooperation pact for
years. Malaysian Navy Chief Admiral Abu Bakar
                                                                       the construction of the three Agosta-90s. All of DCN's
Jamal has stated that the procurement of a submarine
                                                                       French staff were pulled out of Pakistan after the 9/11
flotilla for the Malaysian Navy was its highest priority.
                                                                       attacks on the United States, but some had returned to
DCN International was competing with RDM's Moray
                                                                       assess the security situation. Despite the delays caused
class for the contract.
                                                                       by this attack, the second of the Pakistani Agosta-90B
In April 2002, there were authoritative but unconfirmed                class submarines was delivered in January 2003 and
reports that the Malaysian government had selected the                 commissioned on December 12 of that year.
Scorpene as its new submarine class, and that a single
                                                                       The third submarine of this class, the Hamza,
Agosta would be transferred from the French Navy to
                                                                       incorporates improvements based on the experience
act as a training ship. Reports differed on whether the
                                                                       gained by the initial two submarines of the same class
Agosta class submarine in question was the La Praya or
                                                                       and new advances in endurance, acoustic discretion,
the Ouessant, but the latter is currently the systems trial
                                                                       propulsion, and diving capability. The Hamza was
submarine for the Barracuda project, and it seems
                                                                       launched in August 2006 and was finally commissioned
unlikely that the SSN program would be disrupted by
                                                                       in September 2008.
                                                   Related News
Pakistan Selects Type 214 – Pakistan is purchasing three German-designed Type 214 diesel-electric
submarines. The submarines were designed by German shipbuilder Howaldtswerke-Deutsche Werft (HDW) and
will be built at a Karachi shipyard. This deal, for which a contract is expected to be signed soon, is worth more than
$1 billion. These submarines will be armed with European-built heavyweight torpedoes. Primary options appear to
be the DM2A4 and Black Shark. (Seawaves, 4/08)
 Market Intelligence Service Subscribers: For additional news, go to the on-line E-Market Alert page located in the Intelligence Center at
 www.forecastinternational.com and click on the links to the products you subscribe to.
Funding
The program has been funded by the Pakistani defense forces through the Pakistan Navy.
Contracts/Orders & Options
                         Award
Sponsor               ($ millions)      Date/Description
                                               ©2009                                                                           July 2009
Page 8                                                                                            Warships Forecast
Agosta-90B
                      Award
Sponsor            ($ millions)    Date/Description
Pakistan Navy          950         Sep 21, 1994 – Order for a batch of three.
Pakistan Navy           80         Sep 2005 – Order for DM2A4 torpedoes.
Timetable
    Month       Year    Major Development
    Sep         1992    Provisional order for a batch of three submarines
    Sep         1994    Order confirmed
    Mar         1995    Pressure hull construction begun for first-of-class
    Jan         1996    First hull section completed
                1997    First-of-class laid down
    Sep         1997    Fabrication and welding of a full-scale test section completed
    May         1998    Three hull sections for second boat delivered to Pakistan
    Aug         1998    First-of-class launched, harbor trials begin; second boat laid down "again"
    Sep         1998    Parts for third hull sent to Pakistan
    4Q          1998    Sea trials for first-of-class begin
                1999    Third boat laid down
    Dec         1999    First-of-class arrives in Pakistan after delayed departure from France
                2000    Plans made to install AIP MESMA propulsion system on third hull
                2001    Second boat launched
    Dec         2003    Second boat commissioned
    Aug         2006    Third ship launched
    Sep         2008    Last of class commissioned
Worldwide Distribution/Inventories
France       Four older Agosta-70s now decommissioned
Pakistan     Three Agosta-90Bs, two Agosta-70s in service
Spain        Four Agosta-70s in service
                                      Forecast Rationale
The news that PNS Hamza, the last of the three                 independent propulsion system on the first two
Agosta-90B submarines ordered by Pakistan has finally          submarines of the class.
been commissioned means that construction of the class
                                                               With the slight chance that the Pakistan Navy would opt
has now ended. The prospect of any additional
                                                               for a repeat Agosta-90B now eliminated and with the
construction was terminated when Pakistan ordered the
                                                               Agosta 90 no longer being promoted in any current or
German-designed Type 214 class submarines as its next
                                                               future competitions, it is apparent that no further
submarine design. Henceforth, the only activity in this
                                                               submarines of this class will be built. This report,
class will be the installation of the MESMA air
                                                               therefore, will be archived next year.
Ten-Year Outlook
Due to the completion of all outstanding orders, no forecast is provided at this time.
                                                      *    *    *
July 2009