FLENDER Gear Units: Girth Gear Unit For Tubular Mills
FLENDER Gear Units: Girth Gear Unit For Tubular Mills
DMG2
      Sizes 18, 22, 25.4 and 30
                                                                            Technical
                                                                            description           12
                                                                                                   5
Assembly and operating instructions
Translation of the original assembly and operating instructions             Fitting               12
                                                                                                   6
                                                                            Startup              12
                                                                                                   7
                                                                            Operation             12
                                                                                                   8
                                                                            Faults, causes
                                                                            and remedy            12
                                                                                                   9
                                                                            Maintenance
                                                                            and repair            10
                                                                                                  12
                                                                            Spare parts,
                                                                            Service addresses     11
                                                                                                  12
Declarations 12
                                                       BA 5150 EN 06/2010
                                                             2 / 42
Notes and symbols in these assembly and operating instructions
Note: The term "Assembly and operating instructions" will in the following also be shortened to "instructions"
      or "manual".
Legal notes
Warning note concept
This manual comprises notes which must be observed for your personal safety and for preventing material damage.
Notes for your personal safety are marked with a warning triangle or an "Ex" symbol (when applying
Directive 94/9/EC), those only for preventing material damage with a "STOP" sign.
           WARNING! Imminent explosion!
           The notes indicated by this symbol are given to prevent explosion damage.
           Disregarding these notes may result in serious injury or death.
           The notes indicated by this symbol are given to prevent personal injury.
           Disregarding these notes may result in serious injury or death.
           The notes indicated by this symbol are given to prevent damage to the product.
           Disregarding these notes may result in material damage.
NOTE!
           The notes indicated by this symbol must be treated as general operating information.
           Disregarding these notes may result in undesirable results or conditions.
           The notes indicated by this symbol are made to prevent risk of burns due to hot surfaces
           and must always be observed.
           Disregarding these notes may result in light or serious injury.
Where there is more than one hazard, the warning note for whichever hazard is the most serious is always used.
If in a warning note a warning triangle is used to warn of possible personal injury, a warning of material damage may
be added to the same warning note.
Qualified personnel
The product or system to which these instructions relate may be handled only by persons qualified for the work
concerned and in accordance with the instructions relating to the work concerned, particularly the safety and
warning notes contained in those instructions. Qualified personnel must be specially trained and have the
experience necessary to recognise risks associated with these products or systems and to avoid possible hazards.
                                               BA 5150 EN 06/2010
                                                     3 / 42
Intended use of Siemens products
Observe also the following:
              Siemens products must be used only for the applications provided for in the catalogue and the relevant
              technical documentation. If products and components of other makes are used, they must be
              recommended or approved by Siemens. The faultfree, safe operation of the products calls for proper
              transport, proper storage, erection, assembly, installation, startup, operation and maintenance. The
              permissible ambient conditions must be adhered to. Notes in the relevant documentations must be
              observed.
Trademarks
All designations indicated with the registered industrial property mark ® are registered trademarks of Siemens AG.
Other designations used in these instructions may be trademarks the use of which by third parties for their own
purposes may infringe holders’ rights.
Exclusion of liability
We have checked the content of the instructions for compliance with the hard and software described.
Nevertheless, variances may occur, and so we can offer no warranty for complete agreement. The information
given in these instructions is regularly checked, and any necessary corrections are included in subsequent editions.
Symbols
                                                           Connection for
Oil overflow
                                                           vibrationmonitoring device
Do not unscrew
These symbols indicate the oillevel checking procedure using the oil dipstick.
These symbols indicate that the oil dipstick must always be firmly screwed in.
                                                BA 5150 EN 06/2010
                                                      4 / 42
                                                                        Contents
1.      Technical data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                          7
1.1     Dimensions, torques and weights . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                         7
1.2     General technical data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .              8
1.3     Measuringsurface soundpressure level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                              8
2.      General notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                          9
2.1     Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      9
2.2     Copyright . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .     9
3.      Safety instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                            10
3.1     Obligations of the user . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            10
3.2     Environmental protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .               11
3.3     Special dangers and personal protective equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                    11
5.      Technical description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                15
5.1     General description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            15
5.2     Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .    15
5.3     Shaft seals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .    15
5.4     Terminal diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .           16
5.4.1   Terminal diagram Type: 1515.210 (300 x 150 x 80) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                     16
5.4.2   Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .     16
5.4.3   Terminal diagrams X6, X7 and X9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                        17
6.      Fitting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                18
6.1     General information on fitting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                 18
6.2     Installation conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          19
6.3     Preparatory measures for installation of the gear unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                 20
6.3.1   Inspection of the girth gear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .               20
6.3.2   Determining the tubular mill centre . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                    21
6.3.3   Foundation inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .              21
6.4     Fitting the base plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .           22
6.5     Installing the gear units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            23
6.5.1   Fastening foundation bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                 24
6.5.2   Adding-on the oilsupply system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                      25
6.6     Final work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   25
                                                                    BA 5150 EN 06/2010
                                                                          5 / 42
7.        Startup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                      26
7.1       Preparatory work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            26
7.1.1     Check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .     26
7.1.2     Flushing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      27
7.1.2.1   General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .     27
7.1.2.2   Flushing before initial startup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                  27
7.1.2.3   Flushing before/after repair and maintenance work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                     28
7.2       Inductive sensor on the intermediate shaft (optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                     28
7.2.1     Setting the inductive sensor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                    28
7.3       Filling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   29
7.4       Startup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      30
7.4.1     Prelubrication phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .               30
7.4.2     Startup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      30
7.4.3     Checking procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                30
7.5       Removal from service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                  30
8.        Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                         31
8.1       Irregularities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      31
12.       Declarations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                          41
12.1      Declaration of incorporation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                    41
                                                                       BA 5150 EN 06/2010
                                                                             6 / 42
1.          Technical data
Fig. 1:     Dimensions
Table 1:      Dimensions, torques and weights DMG2
                      Gear unit             Output pinion        Gear rim
          Trans         max.                            Num. max. max.                               d1
                                          Tooth   Mo‐
Gearunit mission       output    Wght.                    of  tooth tooth       a      a1       b           l1   E   G1   h    H
                                          width   dule                                                (n6)
  size     ratio        torque                           teeth width width
             i            Teff     G       b1      m       z1   b2max z2max
                         kNm        t     mm      mm            mm              mm     mm        mm   mm mm mm        mm   mm   mm
               5.45
      18        ...      173.5     16     480     18      31    475    600     1206 1768 1350 140 230 911             750 1060 2275
              11.65
               5.85
      22        ...       270     23.5    580     22      31    575    600     1428 2065 1700 170 250 1097 790 1200 2620
              11.42
              6.17
     25.4      ...        484      36     660     25.4    31    655    600     1600 2325 1900 190 295 1224 930 1450 3140
             11.005
              6.232
      30        ...       700      69     780     30      31    770    600     1990 2870 2375 230 380 1555 1100 1845 3885
              10.32
For the exact technical data, refer to the drawings in the gearunit documentation.
                                                         BA 5150 EN 06/2010
                                                               7 / 42
1.2   General technical data
      The most important technical data are shown on the rating plate. These data and the contractual
      agreements between Siemens and the customer for the gear unit determine the limits of its correct use.
                                                            ①
                                                            ②
                                              ③                         ④
                                              ⑤                         ⑥
                                              ⑦                         ⑧
                                                            ⑨
                                                            ⑩
                                                            ⑪
                                                            ⑫
                                                            ⑬
*) Example
D M G 2 25.4
Size
Gearunit type
      Data on weights and measuringsurface soundpressure levels of the various gear types are given in
      items 1.2 and 1.3.
      For further technical data, refer to the drawings in the gearunit documentation.
1.3   Measuringsurface soundpressure level
      A measuringsurface soundpressure level cannot be specified, as during the test run the gear unit is
      operated on the Siemens test rig without load.
                                              BA 5150 EN 06/2010
                                                    8 / 42
2.    General notes
2.1   Introduction
      These instructions are an integral part of the gear unit supplied and must be kept in its vicinity for reference
      at all times.
                  All persons carrying out work on the gear unit must have read and understood these
                  instructions and must adhere to them. Siemens accepts no responsibility for damage
                  or disruption caused by disregard of these instructions.
      The "FLENDER girth gear unit" described in these Instructions has been designed for driving a tubular
      mill. Possible areas of application for gear units of this series are mainly the cement and oreprocessing
      industries.
      The gear unit is designed only for the application specified in section 1, "Technical data". Other operating
      conditions must be contractually agreed.
      The gear unit has been manufactured in accordance with the state of the art and is delivered in a condition
      for safe and reliable use.
      The gear unit must be used and operated strictly in accordance with the conditions laid down in the contract
      governing performance and supply agreed by Siemens and the customer.
      The gear unit described in these instructions reflects the state of technical development at the time these
      instructions went to print.
      In the interest of technical progress we reserve the right to make changes to the individual assemblies and
      accessories which we regard as necessary to preserve their essential characteristics and improve their
      efficiency and safety.
2.2   Copyright
      The copyright to these instructions is held by Siemens AG.
      These instructions must not be wholly or partly reproduced for competitive purposes, used in any
      unauthorised way or made available to third parties without our agreement.
      Technical enquiries should be addressed to the following works or to one of our customer services:
                       Siemens AG
                       Am Industriepark 2
                       46562 Voerde
                                             BA 5150 EN 06/2010
                                                   9 / 42
3.    Safety instructions
                  Entry to the gear unit and its added components is not permitted during operation!
                  Entry for maintenance and repair work is only permitted when the gear unit is at
                  a standstill!
                  Caution! Risk of falling!
                  Any changes on the part of the user are not permitted. This applies equally to safety
                  features designed to prevent accidental contact.
                  Rotating and/or movable drive components must be fitted with suitable safeguards to
                  prevent contact.
                  When the gear unit is incorporated in plant or machinery, the manufacturer of such
                  plant or machinery must ensure that the contents of these instructions are
                  incorporated in his own instructions.
                                             BA 5150 EN 06/2010
                                                   10 / 42
      •   Removed safety equipment must be reinstalled prior to starting up.
      •   Notices attached to the gear unit, e.g. rating plate, direction arrows etc., must always be observed.
          They must be kept free from dirt and paint at all times. Missing plates must be replaced.
      •   Screws which have been damaged during assembly or disassembly work must be replaced with new
          ones of the same strength class and type.
      •   Spare parts should always be obtained from Siemens (refer also to section 11).
3.2   Environmental protection
      •   Dispose of any packing material in accordance with regulations or separate it for recycling.
      •   When changing oil, the used oil must be collected in suitable containers. Any pools of oil which may
          have collected should be removed at once with an oilbinding agent.
      •   Preservative agents should be stored separately from used oil.
      •   Used oil, preservative agents, oilbinding agents and oilsoaked cloths must be disposed of in
          accordance with environmental legislation.
      •   Disposal of the gear unit after its useful life:
          ─ Drain all the operating oil, preservative agent and/or cooling agent from the gear unit and dispose
            of in accordance with regulations.
          ─ Depending on national regulations, gearunit components and/or addon parts may have to be
            disposed of or sent for recycling separately.
3.3   Special dangers and personal protective equipment
      •   Depending on operating conditions, the surface of the gear unit may heat up or cool down to extreme
          temperatures.
                  In the case of cold surfaces (< 0 °C) there is a risk of frost injury (pain, numbness,
                  frostbite)!
                  Small foreign matter such as sand, dust, etc. can get into the cover plates of the
                  rotating parts and be thrown back by these.
                  Risk of eye injury!
                  In addition to any generally prescribed personal safety equipment (such as safety shoes,
                  safety clothing, helmet) handling the gear unit requires wearing suitable safety gloves and
                  suitable safety glasses!
                  The gear unit is not suitable for operation in explosion hazard locations. It must under
                  no circumstances be used in such locations because of the risk to life and limb.
                                               BA 5150 EN 06/2010
                                                     11 / 42
4.    Transport and storage
If there is any visible damage, the gear unit must not be put into operation.
4.2   Transport
                  When transporting Siemens products, use only lifting and handling equipment of
                  sufficient loadbearing capacity!
                  Observe the notes regarding load distribution on the packing.
      The gear unit is delivered in the fully assembled condition. Additional items may be delivered separately
      packaged.
      Different forms of packaging may be used, depending on the size of the unit and method of transport.
      Unless otherwise agreed, the packaging complies with the HPE Packaging Guidelines.
      The symbols marked on the packing must be observed at all times. These have the following meanings:
            Top           Fragile       Keep dry       Keep cool      Centre of     Use no hand       Attach
                                                                       gravity         hook            here
                  The gear unit must be transported using suitable equipment only. During transport the gear unit
                  should be left without oil filling and on the transport packing.
                  Use only the marked eyes provided to attach lifting equipment to the unit.
                  Handling of the gear unit by attaching it to the piping is not permitted.
                  The pipework must not be damaged.
                  Do not use the front threads at the shaft ends to attach slinging and lifting gear for
                  transport.
                  Slinging and lifting gear must be adequate for the weight of the gear unit.
                                            BA 5150 EN 06/2010
                                                  12 / 42
                    Transport lock
The floating intermediate shaft of the gear unit is retained axially by a transport lock.
The transport lock must be reused for any further transport.
When transporting from the works to the customer, the transport conditions set out in table 2 must be
observed.
Table 2:    Transport conditions
     18                                                     4
                                                                             Squared timber 4 x 10 x 12 cm
     22                Low loader                           4
                                                                               attached to the gear unit
    25.4                                                    6
                 Low loader with special
     30                                                     8
                  low bed (note height)
                                        BA 5150 EN 06/2010
                                              13 / 42
4.3   Storing the gear unit
      The gear unit must be stored in a sheltered place in the position of the original packaging or in the position
      of use, placed on a vibrationfree, dry base, and covered over.
      When storing the gear unit and any single components supplied with it, the preservative agent should be
      left on them. It must not be damaged, otherwise there is a risk of corrosion.
                 If the gear unit is being stored out of doors, it must be particularly carefully covered,
                 and care must be taken that neither moisture nor foreign material can collect on the
                 unit. Waterlogging should be avoided.
                 (Siemens must be consulted.)
                 Unless otherwise agreed by contract, the gear units must not be exposed to harmful
                 environmental factors such as chemical products, high air pollution and ambient temperatures
                 outside the range 0 to + 40 °C.
                 Provision for special environmental conditions during transport (e.g. transport by ship) and
                 storage (climate, termites, etc.) must be contractually agreed.
The gear unit is normally delivered completely ready, with a priming and a finish coat.
                 Where gear units are delivered with a priming coat only, it is necessary to apply a finish
                 coat in accordance with directives applying to the specific application.
                 The priming coat alone is not suitable to provide a sufficient longterm corrosion
                 protection.
Any damage may cause failure of the external protective coating and corrosion.
                 Unless otherwise contractually agreed, the interior preservation is guaranteed for 24 months,
                 and the preservation of the free shaft ends for 36 months, provided that storage is in dry,
                 frostfree sheds.
                 The guarantee period starts on the date of delivery or that of the notice that the item is ready
                 for shipment.
      For longer periods of storage (> 6 months) we advise regular checking and, if necessary, renewal of the
      interior and exterior preservation (see section 7, "Startup").
      In case of represervation the output shaft must be rotated at least one turn to change the position of the
      rolling element in the bearings. The input shaft must not come to a standstill in the same position as before
      rotation.
      This procedure must be repeated and documented every 6 months until startup.
                                             BA 5150 EN 06/2010
                                                   14 / 42
5.    Technical description
5.2   Lubrication
      Both the teeth and the rolling bearings are forcelubricated by an oil supply unit. The lubricant is fed and
      distributed to the individual lubricating points by a suitably designed pipe system located on the inside of
      the gear unit. The nozzles and orifice plates used on it have large free crosssections which have no
      tendency to blocking.
      For an accurate view of the gear unit and oilsupply system, if any, please refer to the drawings in the gear
      unit documentation.
                    Two pressure monitors must be fitted in the oil feed line on the gear unit.
                    Interlocking of these pressure monitors:
                    The main technical conditions for the oilsupply system are specified in the
                    documentation (e.g. list of equipment) of the oilsupply system.
                    When operating and servicing the components of the oilsupply system, observe the
                    operating instructions of the oilsupply system.
                                             BA 5150 EN 06/2010
                                                   15 / 42
5.4     Terminal diagram
C-side
A-side B-side
D-side
5.4.2 Monitoring
Fig. 6: Monitoring
                                                BA 5150 EN 06/2010
                                                      16 / 42
5.4.3   Terminal diagrams X6, X7 and X9
          =        +       -        :                                   max.         STR      =      +        -           :
                +EXT     -X6        1     UK5N                     1     4.0     STR/1.7                    -B363    BN
                +EXT     -X6        2     UK5N                     2     4.0     STR/1.7                    -B363    BK
                +EXT     -X6        3     UK5N                     3     4.0     STR/1.7                    -B363    BU
                +EXT     -X6        4     USLKG5                   4     4.0     STR/1.7
          =        +       -        :                                   max.         STR      =      +        -           :
                +EXT     -X7        1     UK5N                     1     4.0     STR/1.3                   -B850.1   RD
                +EXT     -X7        2     UK5N                     2     4.0     STR/1.3                   -B850.1   RD
                +EXT     -X7        3     UK5N                     3     4.0     STR/1.4                   -B850.2   WH
                +EXT     -X7        4     UK5N                     4     4.0     STR/1.4                   -B850.2   WH
                +EXT     -X7        5     UK5N                     5     4.0     STR/1.5                   -B851.1   RD
                +EXT     -X7        6     UK5N                     6     4.0     STR/1.5                   -B851.1   RD
                +EXT     -X7        7     UK5N                     7     4.0     STR/1.6                   -B851.2   WH
                +EXT     -X7        8     UK5N                     8     4.0     STR/1.6                   -B851.2   WH
                +EXT     -X7        9     USLKG5                   9     4.0     STR/1.6
          =        +       -        :                                   max.         STR      =      +        -           :
                +EXT     -X9        1     UK5N                     1     4.0     STR/1.1                    -S801     2
                +EXT     -X9        2     UK5N                     2     4.0     STR/1.1                    -S801     4
                +EXT     -X9        3     UK5N                     3     4.0     STR/1.2                    -S801     1
                +EXT     -X9        4     USLKG5                   4     4.0     STR/1.2                    -S801     PE
                +EXT     -X9        5     UK5N                     5     4.0     STR/1.2                    -S802     2
                +EXT     -X9        6     UK5N                     6     4.0     STR/1.2                    -S802     4
                +EXT     -X9        7     UK5N                     7     4.0     STR/1.3                    -S802     1
                +EXT     -X9        8     USLKG5                   8     4.0     STR/1.3                    -S802     PE
                                                  BA 5150 EN 06/2010
                                                        17 / 42
6.    Fitting
      The gear unit is delivered ready assembled for attachment to the girth gear.
                 The steel plate cover covering the open side of the gear unit and required during transport and
                 the transport lock to prevent the intermediate shaft from being displaced must be removed
                 during installation. For reasons of corrosion, removal must be left to the last possible moment.
                 The operator should ensure that no foreign bodies affect the proper function of the
                 gear unit (e.g. falling objects or heaping over).
                 All the fastening points provided by the design of the unit must be used.
                 Screws which have been damaged during assembly or disassembly work must be
                 replaced with new ones of the same strength class and type.
                 For selection of the most important tools needed for installing gear unit sizes 18 to 30,
                 see table 7.
                                            BA 5150 EN 06/2010
                                                  18 / 42
      Table 7:   Important tools for installation of size 18, 22, 25.4 and 30 DMG2 gear units
                                                                              to be made available by
      Tools                                                               Installation
                                                                                              Customer
                                                                           specialist
      Levelling instrument with planimeter micrometer                          X
      2 clock gauges with magnet stator                                        X
      Spirit level 0.02 mm/m 200 mm long                                       X
      Straightedge (for base plate alignment)
      for DMG2 18        approx. 2350 mm
      for DMG2 22        approx. 2710 mm                                                           X
      for DMG2 25.4 approx. 3130 mm
      for DMG2 30        approx. 3770 mm
      Material for casting frame
      (e.g. L profile or boards, 100 to 150 mm wide)
      for DMG2 18         Total length min. 8 m
      for DMG2 22         Total length min. 9 m                                                    X
      for DMG2 25.4 Total length min. 10 m
      for DMG2 30         Total length min. 13 m
      if necessary, dowels for L profile. If required, sand for boards
      Digital depth gauge or micrometer screw
                                                                                                   X
      (variable lengths) up to a depth of 500 mm
                                                                                              Purchase or
      Height measuring stand
                                                                                            own manufacture
      Basebolt pretensioning tool min. 2500 bar,
      incl. hand lever pump and highpressure hose
      for DMG2 18        (not required)
                                                                                                Purchase
      for DMG2 22        M 80 x 4
      for DMG2 25.4 M 90 x 4
      for DMG2 30        (not required)
      Measuring rod for gearunit alignment
      for DMG2 18      Diameter 35 to 40 x 1450 mm
      for DMG2 22      Diameter 45 to 50 x 1700 mm
                                                                                                   X
      for DMG2 25.4 Diameter 50 to 60 x 2000 mm
      for DMG2 30      Diameter 65 to 75 x 2280 mm
      Lengths are minimum lengths, (material e.g. drawn steel)
      Feeler gauge 0.05 mm to 2 mm                                             X
      2 x Lukas hydraulic cylinder 10 t                                                            X
      2 x pumps for hydraulic cylinder (Lukas)                                                     X
      Diverse material / tools:
      e.g. solvent for Tectyl, vessel for mixing grouting compound,
                                                                                                   X
      stirring stick, drilling machine, M 30 hexagon spanner, steel
      cutoff grinder, plumb bob, measuring tape
      If necessary, for piping: Cuttingoff tool, welding equipment,
      15 % HCl for acidification                                                                   X
      15 % NaOH for neutralisation
      1 kg grease                                                                                  X
                                               BA 5150 EN 06/2010
                                                     19 / 42
        Adequate lifting equipment must be available before beginning the fitting work.
        The loadbearing capacity of the lifting gear to be installed and used must correspond at least to the weight
        of the gear unit (for details see section 1, "Technical data").
                     The gear unit may be attached only at the points indicated.
                     (see section 4, "Transport and storage")
Transport lock
                                               BA 5150 EN 06/2010
                                                     20 / 42
6.3.2   Determining the tubular mill centre
        To assist measurement, two test prods set 180° apart can be mounted on the front reference face of the
        girth gear. The tubular mill centre must be determined and marked (e.g. on a wall).
6.3.3   Foundation inspection
        The installation of the base plate to the girth gear is projected onto the available foundation and checked
        with the aid of the foundation plan (see Figure 8). Using a plumb bob, the outer diameter of the girth gear
        is transferred to the foundation. For mounting dimension "X", see the foundation plan.
                   If the permitted girth gear production allowances (e.g. tooth width, tip circle diameter)
                   are exceeded, mounting dimension "X" may change. In such cases Siemens must
                   therefore be consulted.
Girth gear
Lot
Base plate
                                              BA 5150 EN 06/2010
                                                    21 / 42
6.4   Fitting the base plate
      The following parts must be placed ready for fitting the base plate:
      Table 9:       Parts for fitting the base plate
       Part                                                           Part
            Quan                                                               Quan
       num‐                                Designation                num‐                                Designation
             tity                                                                tity
        ber                                                            ber
         1          1         Base plate                                           6         Plate
                                                                       12
         2          1         Base plate                                           8         Plate for DMG2 30
         3          4         Pedestal                                             6         Usection
                                                                       13
         4         24         Hexagon head screw                                   8         Usection for DMG2 30
         5          2         Connecting plate                                     6         Threaded rod
                                                                       14
                    8         Hexagon head screw for DMG2 30                       8         Threaded rod for DMG2 18
                    8         Hexagon head screw for DMG2 22                      12         Hexagon nut
         6                                                             15
                   16         Hexagon head screw for DMG2 25.4                    16         Hexagon head screw for DMG2 30
                   20         Hexagon head screw for DMG2 30           21                    Sealing material
                   16         Hexagon head screw for DMG2 18           23          4         Hexagon head screw
                   20         Hexagon head screw for DMG2 22           24          4         Hexagon nut
        11
                   16         Hexagon head screw for DMG2 25.4         30          1         Measuring stand
                   16         Hexagon head screw for DMG2 30           31          4         Hexagon head screw
         Concrete foundation                                                                                   21
                                                                                                                            14
                                                          Grouting mixture, nonshrinking,
                                                          compression strength ≥ 90 N/mm2                                Steel plate
                                                                                                                           13
                                                                                              31                           15
                                                    BA 5150 EN 06/2010
                                                          22 / 42
      The base plates are located and checked for fitting dimension.
      The measuring stand is bolted onto the first base plate (1). The measuring stand has a mark corresponding
      precisely to the centre of the main gear unit (height) in the operating condition. The plate is clamped fast
      in the foundation with the threaded rods (14) and accessories (12, 13, 15) and aligned horizontally with the
      set screws (11). The horizontal position is checked with a spirit level. The precise height is checked with
      the levelling instrument via measuring stand/fixed point in the building (tubular mill axis).
      The second base plate (2) is prealigned with a straightedge and then laid by the same procedure.
                  Both base plates must be precisely horizontal and level with each other. The maximum
                  error must not exceed 0.1 mm/m.
      After alignment the base plates are enclosed in shuttering and grouted in with a nonshrinking material with
      specified properties (cf. foundation plan). The foundation holes must be sealed to prevent the entry of
      grouting medium. For this the threaded rods (14) must be loosened individually in order to carry out the
      sealing. The plates must then be checked once more with a spirit level. The specific instructions for the use
      of this grouting medium must be observed.
                  After the grouting medium has hardened and the fixtures have been removed, the
                  foundation bolts for the gear unit must be inserted in the foundation holes, as the bolts
                  cannot be inserted later. The set screws (11) must be cut off.
      Before the gear unit is placed on the base plate, the support surfaces must be cleaned of preservative and
      dirt.
      The marked point on the girth gear (for highest point of runout measurement, see item 6.3) must be on
      a level with the tubular mill axis.
      After the gear unit has been placed on the base plate, the height must be checked once more with the
      levelling instrument. Centricity to the girth gear across the width is determined via the helical gears
      (parts 216 and 217, see spareparts drawing item 11.3 or 11.4) (J = K ).
      A lever arm must be mounted on the input shaft to enable the pinions to be rotated.
                  The transport lock of the floating shaft must be removed now. To do this, undo the
                  locknuts and remove the threaded rod on either side of the gear unit. After that seal
                  the hole in the bearing cover with a plug.
      Using hydraulic cylinders, the main gear unit may now be shifted towards the girth gear, until "equal zero"
      backlash is achieved on the flanks. During this work care must be taken to ensure that the teeth of the
      pinions engage parallel with the girth gear teeth. In this position a measuring rod is placed between two
      girth gear teeth in order to determine the precisely parallel position of the main gear unit relative to the
      tubular mill axis. Measurement is made between the measuring rod and the flange on the main gear unit
      to which the seal is fixed (L = M ).
                  When moving the teeth together, extreme care must be exercised until "nearly zero"
                  flank backlash is achieved. The backlash at both meshing points must be
                  continuously checked. If zero flank backlash is achieved at one meshing point, the
                  gear unit must not under any circumstances be shifted any further, as otherwise
                  damage may be caused to the teeth.
                                            BA 5150 EN 06/2010
                                                  23 / 42
        After alignment the entire drive is pulled back the distance "Y" specified in the foundation plan. This will
        enable the flank backlash required in operation to be obtained. To guarantee even shifting back, two clock
        gauges are applied to the rear end of the gear unit feet while the gear unit is being pulled back by means
        of the hydraulic cylinders. The axial height of the gear unit and parallelism to the girth gear must then be
        rechecked. The clock gauges remain in position for checking.
                                                                      C
                                      J     K
                                                     M
                         L
                                                                                A=    Stop rail
                                                                                B=    Grouting medium
                                                                                C=    Gear unit
                                                                                D=    Measuring rod
                                                                                E=    Cam on gear unit housing
                                                                      E         F =   Stopper on the base plates
                                                                                G=    Rear edge of gear unit
                                                                      H               when flank backlash is zero
                                                                                H=    Hydraulic cylinder
                                                                                Y=    Pullback distance
                                                                      F         J =   K
                                                                                L =   M
                                                                      C
                                                               B
            G
                   Y
                                                BA 5150 EN 06/2010
                                                      24 / 42
                     The accuracy of alignment of the shaft axis of the drive motor and the gear unit is an
                     important factor in improving the life span of shafts, bearings and couplings. If
                     possible, the deviation should be zero. For amongst others the special requirements
                     for the couplings, refer to the specific operating instructions.
Nonobservance can cause shaft rupture, resulting in serious injury or danger of life.
                                                BA 5150 EN 06/2010
                                                      25 / 42
7.      Startup
The gear unit must not be started up if the required instructions are not to hand.
        A precondition of the warranty is initial startup by Siemens specialists or suitably trained specialists
        authorised by Siemens. Siemens urgently recommend initially driving the tubular mill via the main drive
        likewise under the supervision of the abovementioned specialists.
        For this reason the gearunit instructions must be adhered to, particularly if maintenance work is carried
        out on the tubular mill during which this is rotated and the gear unit along with it.
7.1     Preparatory work
7.1.1   Check
        When the installation has been completed and before the first cold test run, all the drive parts must be
        inspected and all material residues, tools and installation aids removed.
        If the Siemens delivery includes the oilsupply system, this must be checked for correct operation before
        delivery. Before testrunning the tubular mill, the electric interlock between the oilsupply system and
        tubular mill drive motor must be inspected.
        The entire drive must also be checked against the following check list:
        •   Have the base plates been fully grouted?
        •   Have the foundation bolts been properly tightened?
        •   Have the armature bolts of the main motor been tightened to requirement?
        •   Has the inside of the girth gear cover been cleaned, and is the return line clear?
        •   Hass the girth gear been aligned in accordance with the installation requirements?
        •   Have the girth gear fixing bolts been tightened to the prescribed bolt tightening torque?
        •   Has the seal of the girth gear cover been correctly fitted and is it operational?
        •   Has the seal to the join between the housing and the girth gear cover been correctly fitted?
        •   Has all the pipework been fitted and cleaned in accordance with the installation instructions?
                    Especial care must be taken to ensure that the oilconducting pipework is clean, since
                    any dirt in it would be conducted through the gear unit before it could be filtered out
                    at the filter of the oilsupply system!
                                               BA 5150 EN 06/2010
                                                     26 / 42
        •   The following checks must be recorded:
            ─ Height datum marks on foundations and position of tubular mill axes.
            ─ Level of the base plates.
            ─ Evenrun errors on girth gear  axial and radial value.
            ─ Flank and tip backlash between girth gear and pinion?
            ─ Alignment of motor, coupling and gear unit
        •   Check that the interlocking system is operating in accordance with the interlocking plan and/or the
            description.
        •   Have the flow monitors, pressure switches and temperature sensors been set to the correct values?
        •   Has the coolingwater supply been opened?
        •   Has the transport lock to the floating shaft been removed?
        •   If our delivery includes an inductive sensor:
            Has the inductive sensor been correctly installed?
        •   Is the axial displacement of the floating shaft (300) within the permitted range?
            (During the measurement the gear unit should be clamped in the direction of the load. For permissible
            values see table 12 in item 7.4. 1).
        For further checks, see the operating instructions for the couplings, motors, oilsupply system, girth gear
        and tubular mill.
7.1.2   Flushing
7.1.2.1 General
        In all cases a distinction must be made between "flushing" prior to the initial startup and "flushing" before
        and after repairs and overhauls.
7.1.2.2 Flushing before initial startup
        Flushing before initial startup serves to minimise old lubricating oil residues which may cause the oil to
        foam and make necessary the removal of contamination resulting from installation.
        Flushing should be carried out with the selected service lubricant. It is recommended that the oil be
        warmed up. The amount of flushing oil used must be selected to enable the oil pump to run continuously.
        The length of flushing time depends on the temperature of the flushing oil:
                                      Table 11: Oil temperature and flushing time
                                           Oil temperature         Flushing time
                                            20 °C / 68 °F                6h
                                            30 °C / 86 °F                5h
                                            40 °C / 104 °F              3.5 h
                                            50 °C / 122 °F               2h
        After flushing the oil must be drained out of the oilsupply system.
                    At a low temperature the oil in the girth gear cover runs back slowly. Before the oil is
                    drained off, it must be checked to determine whether the original level on the
                    oilsupply system has again been reached. It may be reused only as flushing oil after
                    thorough cleaning.
                                               BA 5150 EN 06/2010
                                                     27 / 42
7.1.2.3 Flushing before/after repair and maintenance work
        Flushing before and after the repair and maintenance work serves mainly to remove any possible
        contamination. Flushing should be carried out with the selected service lubricant. It is recommended that
        the oil be warmed up. The flushing time depends on the level of contamination.
                   At a low oil temperature, the oil in the girth gear cover runs back slowly. Before the oil
                   is drained off, it must be checked to determine whether the original level on the
                   oilsupply system has again been reached. It may be reused only as flushing oil after
                   thorough cleaning.
                                                                      300
                                                                                           350
                                                                                          363
                                                    b
             a
340, 341
344 361
                                                 BA 5150 EN 06/2010
                                                       28 / 42
      Table 12: Permitted axial displacements of the floating shaft (300) of the girth gear units from the central
                position
            18                        ± 4.5 mm
            22                        ± 5.5 mm
                                                                                ± 0,7 mm
           25.4                       ± 6.0 mm
            30                        ± 7.5 mm
7.3   Filling
                  The oilsupply system must be filled with the prescribed quantity of clean service
                  lubricating oil (of a purity class higher than 20/18/15 in accordance with ISO 4406) of
                  the selected type (note display on the oilsupply system).
                  For the prescribed oil viscosity and type of oil (mineral oil, etc.), see Technical Data,
                  the dimensioned drawing or the rating plate.
                  The quality of the oil used must meet the requirements of the separately supplied
                  BA 7300 EN operating instructions, otherwise the guarantee given by Siemens will
                  lapse. We urgently recommend using one of the oils listed in BA 7300 EN, because they
                  have been tested and meet the requirements.
                  If level of freshoil contamination is higher than prescribed, the oil must be filtered with
                  a nominal filter fineness of 10 μm during filling.
                                             BA 5150 EN 06/2010
                                                   29 / 42
7.4     Startup
7.4.1   Prelubrication phase
        Prior to first startup, the gear unit should be prelubricated for 30 to 60 minutes by means of the oilsupply
        system.
        During this time, rolling bearings and gear teeth will be adequately supplied with lubricating oil for the first
        startup. All piping, filters, coolers and oil chambers are filled with oil.
7.4.2   Startup
        After due observance of the relevant operating instructions, the gear unit can be put into operation.
        If a cold test run (partial load range without filling) is required, the gear unit must be operated via the
        auxiliary drive only.
        When operating the system via the main motor, the tubular mill must be at least 80 % filled.
        At 80 % tubular mill filling the contact patterns must be checked and should show a contact surface of at
        least 80 % over the tooth width. This must be carefully checked and any errors reported to Siemens.
        If a carrying ratio greater than 80 % is achieved, more oil may be put in.
7.4.3   Checking procedure
        The following visual checks must be conducted and recorded when starting up:
                    Oil level
                    Position of the floating shaft (300) from the zeroposition including dynamic
                    displacement.
        •   During longer periods of disuse but less than 6 months, the unit and oilsupply system should be started
            up briefly at intervals of approx. 3 weeks.
        •   If it is to remain out of service for longer than 6 months, the interior of the gear unit must be preservation
            treated. After internal preservation the gear unit must first be flushed out (see also item 7.1.2) before
            any further startup.
                                                BA 5150 EN 06/2010
                                                      30 / 42
8.    Operation
      Observe the instructions in section 3, "Safety instructions", in section 9, "Faults, causes and remedy", and
      in section 10, "Maintenance and repair"!
      To achieve a satisfactory and troublefree operation of the equipment, be certain to observe the operating
      values specified in section 1, "Technical Data", as well as the information given in the operating instructions
      of the oilsupply system.
      During operation the gear unit must be monitored for:
      •   Operating temperature                     An oilsupply temperature with the following values should
                                                    aimed for:
                                                    40 °C up to 45 °C.
                                                    The maximum permissible oilsupply temperature is:
                                                    55 °C (applies to mineral oil)
                                                    60 °C (applies to synthetic oil)
                                                    At higher temperatures the gear unit must be shut down
                                                    and Siemens consulted.
8.1   Irregularities
                  The drive unit must be switched off at once,
or
                  Determine the cause of the fault, using table 13, "Faults, causes and remedy"
                  (see item 9.2).
                  Table 13, "Faults, causes and remedy", contains a list of possible faults, their causes
                  and suggested remedies.
                  If the cause cannot be found, a specialist from one of our customerservice centres
                  should be called in (see section 2).
                  During operation the lubricating oil in the lubricating circuit must be filtered with a filter with at
                  least 25 μm mesh at least.
                                              BA 5150 EN 06/2010
                                                    31 / 42
9.    Faults, causes and remedy
      Observe the instructions in section 3, "Safety instructions", and in section 10, "Maintenance and repair"!
9.1   General information on faults and malfunctions
                 Faults and malfunctions occurring during the guarantee period and requiring repair work on the
                 gear unit must be carried out only by Siemens specialists.
                 For the case of faults and malfunctions occurring after the guarantee period and whose cause
                 cannot be precisely identified or whose remedy requires intervention on the gear unit, we
                 advise our customers to call in our Siemens specialists.
                 Siemens will not be bound by the terms of the guarantee or otherwise be responsible
                 in cases of improper use of the gear unit, modifications carried out without Siemens’
                 agreement or use of spare parts not supplied by Siemens.
                 To remedy faults and malfunctions, the gear unit must always be taken out of service.
                 Secure the drive unit to prevent it from being started up unintentionally.
                 Attach a warning notice to the start switch!
       Increased temperature         Oil too old.                    Check date of last oil change and,
       at the bearing points.                                        if necessary, change oil. (See section 10.)
       Increased operating           Oil too old.                    Check date of last oil change and,
       temperature.                                                  if necessary, change oil. (See section 10.)
                                     Oil cooling system: Coolant     Fully open valves in in and outflow pipes.
                                     flow too low.                   Check for free flow through water oilcooler.
                                     Oil flow through water          Clean the oil filter. (See section 10.)
                                     oilcooler too low due to:
                                     Badly clogged oil filter.
                                            BA 5150 EN 06/2010
                                                  32 / 42
           Faults                          Causes                                    Remedy
Loud noises in the area of      Gearunit fastening has            Tighten bolts / nuts to specified torque.
the gearunit fastening.        worked loose.                      Replace damaged bolts / nuts.
                                                                   (See also item 6.5.1).
Oil leakage from the gear       Inadequate sealing of housing      Check and, if necessary, replace sealings.
unit.                           covers and/or joints.              Seal joints.
Pressure monitor triggers       Oil pressure (See item 5.2).       Check and, if necessary, replace oil pump.
alarm.                                                             Check and, if necessary, clean oil filter.
Increased vibration.            Foundation bolts undone.           Retighten foundation bolts to required
                                                                   torque.
                                                                   (See also item 6.5.1).
                                Gear unit too cold in operation.   Shut down gear unit and have oil degassed.
                                                                   Restart without cooling water.
                                       BA 5150 EN 06/2010
                                             33 / 42
10.    Maintenance and repair
10.1   General
       Observe the instructions in section 3, "Safety instructions", and in section 9, "Faults, causes and remedy"!
       Maintenance comprises all measures for preserving and restoring the required condition and for
       ascertaining and assessing the actual condition of the technical means of a system.
       In this sense maintenance is a comprehensive generic concept which can be subdivided into three areas:
       inspection; maintenance, including lubrication; and repair.
                    Before starting any maintenance work, repairs or other work on the gear unit, the
                    operator of the system must ensure that the drive motors (main and auxiliary drive
                    motor) are secured against unintentional starting.
                    The tubular mill must be swung out and secured with the holding brake!
                    Protective devices for rotating parts must be checked for correct seating. Contact with
                    rotating parts is not permitted.
                    For operation and maintenance the technical data, lists of equipment and drawings
                    prepared specifically under the order and appended to the operating instructions
                    must be taken into consideration.
10.2   Inspection
       The inspection comprises all measures for ascertaining and assessing the actual condition.
       Table 14: Inspection work
                                                  BA 5150 EN 06/2010
                                                        34 / 42
       Experience shows that checking against a checklist (see item 10.2.1) is practical. For one thing, all the
       important checking items are listed, for another, the operating parameters are recorded.
The records must be retained with these operating instructions at the tubular mill.
10.2.1 Checklist
       Table 15: Checklist
        Month / year:                                      Day
        Time
        Operating hours
        Mainmotor power                                   max.
        requirement in kW
        (observation period 5 min.)                        min.
        Position of the floating shaft in mm
        (measurement possible only if appropriate sensors ordered)
        Vibration velocity
        at measuring point 1 in mm/s
                                                             1
        Bearing temperature
        at measuring point in °C                             2
        (measuring point 1 mainmotor side)
                                                             3
        Oil temperature in the piping
        of the gear unit oilsupply system in °C
        Oil pressure in the piping                       bottom
        on the gear unit                                 top
Signature
                                                  BA 5150 EN 06/2010
                                                        35 / 42
10.3   Maintenance
       Table 16: Maintenance and repair work
                                               BA 5150 EN 06/2010
                                                     36 / 42
                  The oil viscosity at 40 °C must not be more than 10 % lower than the rated viscosity.
                  When changing the oil, always refill the gear unit with the same type of oil. Never mix
                  different types of oil and/or oils made by different manufacturers. Never mix synthetic
                  oils with mineralbased oils or with other synthetic oils. When changing to any
                  different oil type, the gear unit must be flushed thoroughly using the new oil type.
       Before an oil change the inside bottom of the housing must be checked for foreign particle deposits. This
       check is carried out through the lower front inspection cover.
       If there are any deposits at the bottom of the housing, they must be carefully flushed out until they have
       been completely removed from the housing bottom, from the girthgear cowl, and the return line to the tank.
       Loose residues must have run off into the tank of the oilsupply system.
       Flushing out must be done with the oil to be replaced and with the lubricating system running. For flushing,
       a suitable aid must be connected to an internal spray nozzle (e.g. attach hose with spray nozzle).
       The condition of the filter must be continuously monitored and, if necessary, the filters cleaned.
                  Care must be taken to ensure that during the flushing out operation the deposits do
                  not get into the rolling bearings and onto the teeth.
       After flushing and draining the oil the tank of the oilsupply system must likewise be cleaned.
                  To prevent the buildup of dust on the gear unit, cleaning must be done in accordance
                  with operating conditions.
The gear unit must not be cleaned with highpressure cleaning equipment.
                  Damaged bolts must be replaced with new bolts of the same type and strength class
                  (see also item 6.5.1).
10.4   Repair
       Repair comprises all measures for restoring the required condition after faults.
                  When carrying out repair work, especial care must be taken that, when doing electric
                  welding work at any point on the unit, the welding current is not conducted through
                  rolling bearings or other movable connections and measuring equipment. The
                  welding current return wire must therefore be connected direct to the part to be
                  welded.
       When replacing individual components and other subassemblies, these must be carefully fastened to
       lifting gear and secured to prevent hazards.
                  Use only suitable, technically faultfree lifting gear and loadbearing equipment with
                  sufficient carrying capacity!
                  Do not stand or work under suspended loads!
                                             BA 5150 EN 06/2010
                                                   37 / 42
10.5   Lubricants
       The quality of the oil used must meet the requirements of the separately supplied BA 7300 EN operating
       instructions, otherwise the guarantee given by Siemens will lapse. We urgently recommend using one of
       the oils listed in BA 7300 EN, because they have been tested and meet the requirements.
                    To avoid misunderstandings, we should like to point out that this recommendation is in no way
                    intended as a guarantee of the quality of the lubricant supplied. Each lubricant manufacturer
                    is responsible for the quality of his own product.
       Information on the type, quantity and viscosity of the oil is given on the rating plate on the gear unit and/or
       in the supplied documentation.
       The quantity of oil indicated on the rating plate is an approximation only. The marks on the dipstick or
       oilsight glass are decisive for the amount of oil to be filled in.
       The manual containing the current lubricants recommended by Siemens can also be consulted on the
       Internet (see back cover).
       The oils listed there are subjected to continuous tests. Under certain circumstances the oils recommended
       there may therefore later be removed from the range or replaced with further developed oils.
       We recommend regularly checking whether the selected lubricating oil is still recommended by Siemens.
       If it is not, the brand of oil should be changed.
       Please note that certain components often have special production and supply specifications and that we
       supply you with spare parts which comply fully with the current state of technical development as well as
       current legislation.
       When ordering spare parts, always state the following:
                    Order number, item          Type, size             Part number                Quantity
11.2   Spare parts and customerservice addresses
       When ordering spare parts or requesting a service specialist, please contact Siemens first (see section 2).
                                              BA 5150 EN 06/2010
                                                    38 / 42
11.3   Spare parts drawing, spare parts list, drive version A/x, B/x, C/x
71
Fig. 12: Spareparts drawing 1/2 for drive version A/x, B/x, C/x
                                                              350   299
                                                                                B-side
                          107
                                                                                                    263
                          132
                          137                                                                       264
                          119                                                                       262
                          151                                                                       250
                          152                                                                       217
                          100                                                                       201
                          152                                                                       202
                          119                                                                       216
                          137                                                                       251
                          132                                                                       200
                          107
                                                                                A-side
                                                            350
       Fig. 13: Spareparts drawing 2/2 for drive version A/x, B/x, C/x
       Table 18: Spareparts list, drive version A/x, B/x, C/x
                                                   BA 5150 EN 06/2010
                                                         39 / 42
11.4   Spare parts drawing, spare parts list, drive version D/x, E/x, F/x
71
Fig. 14: Spareparts drawing 1/2 for drive version D/x, E/x, F/x
                                                              350   299
                                                                                B-side
                          107
                          132                                                                      263
                          137                                                                      264
                          119                                                                      262
                          152                                                                      250
                          100                                                                      217
                          152                                                                      201
                          151                                                                      202
                          119                                                                      216
                          137                                                                      251
                          132                                                                      200
                          107
                                                                                A-side
                                                            350
       Fig. 15: Spareparts drawing 2/2 for drive version D/x, E/x, F/x
       Table 19: Spareparts list for spareparts drawing 1/2 for drive version D/x, E/x, F/x
                                                   BA 5150 EN 06/2010
                                                         40 / 42
12.      Declarations
                                     Declaration of incorporation
  in accordance with Directive 2006/42/EC, Annex II 1 B
The manufacturer, Siemens AG, D  46393 Bocholt, declares with regard to the partly completed machinery
  -    The following basic health and safety requirements set out in Directive 2006/42/EC,
       Annex I, are applied and are satisfied:
       1.1, 1.1.2, 1.1.3, 1.1.5; 1.2.4.4, 1.2.6; 1.3.1, 1.3.2, 1.3.3, 1.3.4, 1.3.6, 1.3.7, 1.3.8, 1.3.8.1;
       1.4.1, 1.4.2.1; 1.5.1, 1.5.2, 1.5.4, 1.5.5, 1.5.6, 1.5.7, 1.5.8, 1.5.9, 1.5.10, 1.5.11, 1.5.13, 1.5.15;
       1.6.1, 1.6.2; 1.7.1, 1.7.1.1, 1.7.2, 1.7.4, 1.7.4.1, 1.7.4.2, 1.7.4.3
  -    The partly completed machinery must not be put into service until it has been established
       that the machinery into which the partly completed machinery is to be incorporated
       has been declared in conformity with the provisions of Directive 2006/42/EC, as appropriate.
  Voerde, 2010-06-07
                                                Dr. Nico van de Sandt (Director Engineering DAE)
  Voerde, 2010-06-07
                                                Dr. Bernhard Hoffmann (Director Business Subsegment DA)
                                                  BA 5150 EN 06/2010
                                                        41 / 42
Siemens AG                  Subject to modifications
Industry Sector
Mechanical Drives           © Siemens AG 2010
Alfred-Flender-Straße 77
46395 Bocholt
GERMANY
www.siemens.com/drivetechnologie