NOTE: This Addendum forms a part of the Contract Documents. Insert it in the Project Manual.
      Acknowledge receipt of this Addendum in the space provided on the Bid Form.
     1. SECTION 083113 ACCESS DOORS AND PANELS: Discard the Section bound in the Project
        Manual and substitute the accompanying sections (pages 083113-1 through 083113-3).
     2. SECTION 087100 DOOR HARDWARE: Discard the Section bound in the Project Manual and
        substitute the accompanying sections (pages 087100-1 through 087100-11).
ALL CONTRACTS
     3. SECTION 014100 REGULATORY REQUIREMENTS: Discard the Section bound in the Project
        Manual and substitute the accompanying sections (pages 014100-1 through 014100-3).
END OF ADDENDUM
Updated 05/24/2018
Printed 04/26/2019                           Page 1 of 1              Project No. 44972-CHPE
                                                SECTION 083113
PART 1 GENERAL
1.03     SUBMITTALS
         A.          See Section 013300 - Submittals.
         B.          Product Data: Provide sizes, types, finishes, hardware, scheduled locations, and details
                     of adjoining work.
         C.          Shop Drawings: Indicate exact position of each access door and/or panel unit.
PART 2 PRODUCTS
         B.          Door Panel: Welded pan type, minimum 20 gage double wall construction cold rolled
                     steel or 304 stainless steel as shown.
                     1.       Hinges: Continuous Concealed Pin type set to open a minimum of 135 degrees.
                     2.       Finish: Factory-applied rust inhibitive powder coat or baked enamel over
                              phosphate treated steel.
2.03     FABRICATION
         A.          Assemble access doors as integral units complete with all parts and ready for installation.
                     Fabricate units of continuous welded steel construction unless otherwise indicated or
                     specified. Grind welds smooth and flush with adjacent surfaces. Anchorage devices
                     shall be of size and type required to secure access doors to types of supports indicated on
                     the Drawings.
PART 3 EXECUTION
3.01     INSTALLATION
         A.          Install units in accordance with manufacturer's instructions.
         B.          Install frames plumb and level in openings. Secure rigidly in place.
         C.          Position units to provide convenient access to the concealed work requiring access.
         D.          Coordinate access door installation with installation of supporting construction.
         E.          Set units accurately in position and securely attach to supports with face panel plumb or
                     level in relation to adjoining finish surface
3.02     Adjusting
         A.          Adjust hardware and doors for proper operation.
3.03     Schedule
         A.          Provide non-fire rated access doors in non-fire rated construction and fire rated access
                     doors in fire rated construction.
END OF SECTION
DOOR HARDWARE
PART 1 GENERAL
1.01     REFERENCES
         A.          NFPA 80 Fire Doors and Windows (2007).
         B.          NFPA 101 Life Safety Code (2006).
         C.          Building Code of New York State (2010).
         D.          ICC/ANSI A117.1-2003 Accessible and Usable Buildings and Facilities.
         E.          ANSI/BHMA Standard A156.1 Butts and Hinges (2006).
         F.          ANSI/BHMA Standard A156.4 Door Controls - Closers (2008).
         G.          ANSI/BHMA Standard A156.6 Architectural Door Trim (2005).
         H.          ANSI/BHMA Standard A156.7 Template Hinge Dimensions (2009).
         I.          ANSI/BHMA Standard A156.8 Door Controls - Overhead Stops and Holders (2005).
         J.          ANSI/BHMA Standard A156.13 Mortise Locks and Latches Series 1000 (2005).
         K.          ANSI/BHMA Standard A156.16 Auxiliary Hardware (2008).
         L.          ANSI/BHMA Standard A156.18 Materials and Finishes (2006).
         M.          ANSI/BHMA Standard A156.22 Door Gasketing Systems (2005).
         N.          ANSI/BHMA Standard A156.26 Continuous Hinges (2006).
         O.          DHI - Door and Hardware Institute.
         P.          NAAM Standard HMMA 800-96- Hollow Metal Manufacturers Association.
         Q.          NAAM Standard HMMA 831-97 Recommended Hardware Locations for Custom
                     Hollow Metal Doors and Frames.
         R.          2010 Standards for State and Local Government Facilities: Title II.
1.02     DEFINITIONS
         A.          Architectural Hardware Consultant (AHC): A Door and Hardware Institute certified
                     expert in complex architectural openings requiring advanced knowledge of model
                     building codes and safety standards, ADA requirements, access control knowledge and
                     installation expertise.
1.03     SUBMITTALS
         A.          Waiver of Submittals: The Waiver of Certain Submittal Requirements in Section 013300
                     does not apply to this Section.
         B.          Re-Evaluation Fee: In accordance with the General Conditions 07213 Article 4.7.
         C.          Submittal Package Cover Sheets: The Hardware Distributor shall provide a cover sheet,
                     which identifies each package by:
                     1.      OGS project number.
                     2.      Project name.
                     3.      Facility name and location.
                     4.      Submittal Package name.
                     5.      Specification section name and number.
                     6.      Construction Contractor’s company name, address, e-mail address, and
                              telephone number.
                     7.      Finish Hardware Distributor’s company name, address, e-mail address,
                              and telephone number.
                     8.      Certified Architectural Hardware Consultant’s name, company name,
                              address, e-mail address, and telephone number.
                     9.      Submittal Date.
                     10.     Submittal Packages
                             a.       Quality Control Package: Do not submit balance of packages until this
                                      package is approved.
                                      1)      Architectural Hardware Consultant Data:
                                              a)      Provide name, business address, and telephone number
                                                      of DHI certified Architectural Hardware Consultant.
                                              b)      Submit photocopy of Door and Hardware Institute’s
                                                      certificate demonstrating individual is an Architectural
                                                      Hardware Consultant.
                                      2)      Company Field Advisor Data:
1.04     TEMPLATES
         A.          After receipt of approved submittals, furnish templates to affected trades, to enable
                     fabricators to make provision for finish hardware without delaying the Work of the
                     Project.
1.07     WARRANTY
         A.          Manufacturer’s Warranty: Ten year minimum warranty for door closers.
         B.          Manufacturer’s Warranty: Three year minimum for locksets.
1.08     MAINTENANCE
         A.          Special Tools: At the conclusion of finish hardware installation, turn over to Owner’s
                     Representative 2 sets of each special tools required for proper installation and adjustment
                     of hardware, together with a list of these tools and their purpose.
         B.          Lubricants: Provide manufacturer’s recommended lubricants for locksets and closers
                     sufficient for 1 year of maintenance. Turn over to Director’s Representative.
PART 2 PRODUCTS
2.01     ACCESSORIES
         A.          Provide brackets, plates, arms, spacers, and special templates to mount door closers in
                     combination with overhead stops and coordinators, on narrow top rails and for special
                     ceiling and jamb conditions.
         B.          Provide curved lip strikes, with wrought boxes, specific to individual lock functions.
                     Universal strikes that fit a variety of lock functions are not acceptable.
2.02     FASTENINGS
         A.          Provide fasteners that harmonize with finish hardware material and finish.
         B.          Provide torx center pin security fasteners for exposed hardware, including full mortise
                     hinges.
         C.          Provide machine screws for hardware secured to metal; and machine screws and metal
                     expansion shields for attachment to masonry substrates. Self-tapping or self-drilling
                     screws are not acceptable.
         D.          Provide undercut shallow head torx center pin security fasteners where necessary for
                     proper seating.
         E.          Attach door closers and overhead stops with sex bolts.
2.05     KEYING
         A.          Continue existing key system established for Facility.
                     1.     Stamp key symbol on one side of key, and “Do Not Duplicate” on other
                             side of key.
                     2.     Furnish one copy of factory bitting list to facility.
                     3.     Factory key cylinders.
                     4.     Furnish 3 cut keys for each master key.
                     5.     Furnish 7 cut keys for each keyed lockset.
                     6.     These cut key quantities are for bidding purposes only. Actual number of cut
                            keys required will be determined at keying meeting.
                     7.     When lockset and cylinder are by different manufacturers, identify and
                             furnish correct cylinder cam to operate lockset.
                     8.     Provide compression rings and spacers to achieve proper spacing
                             relationship between cylinder and face of door.
                     9.     Keying Conference
                            a.       Immediately following contract award, Director’s Representative
                                           will schedule a keying conference to develop a written key
                                           schedule that reflects Facility’s specific keying requirements.
                                     1)      Facility Representative(s), Hardware Distributor, Consulting
                                             Hardware Designer, and OGS’s Hardware Designer will attend.
                            b.       Incorporate this schedule in Finish Hardware Submittals for approval.
PART 3 EXECUTION
3.01     EXAMINATION
         A.          Examine doors and frames and related items for conditions such as, but not limited to,
                     incorrect handing, hardware preparation, misaligned lock and strike preparations, that
                     would prevent proper application of finish hardware. Do not proceed until defects are
                     corrected.
         B.          Report conditions or hardware applications that are incorrect to the Director’s
                     Representative.
3.02     INSTALLATION
         A.          Do not proceed with installation of finish hardware prior to attending referenced
                              pre-installation conference.
         B.          Installation Sequence: Use proper installation sequence, i.e., install coordinators, and
                     overhead stops and holders before surface mounted door closers.
3.03     LOCATIONS
         A.          Locate hardware as follows:
                     1.      Door Closers: Template for maximum door swing allowed by wall placement
                             and jamb conditions. Where overhead stop prevents door from swinging to wall,
                             template the closer to exceed degree of opening allowed by overhead stop.
                     2.      Protection Plates: 1/8 inch from door bottom.
                     3.      Wall Stops: Centerline of bumper to match centerline of locking trim.
END OF SECTION
REGULATORY REQUIREMENTS
PART 1 GENERAL
1.01 COMPLIANCE
          A.         All Work shall comply with OSHA (including site-specific safety plans required
                     on all projects), and the New York State Uniform Fire Prevention and Building
                     Code (the "Uniform Code"), which includes the publications incorporated by
                     reference in Title 19 NYCRR Part 1219 through 1228:
                         1. 2015 International Building Code (the “2015 IBC”).
                         2. 2015 International Plumbing Code (the “2015 IPC”).
                         3. 2015 International Mechanical Code (the “2015 IMC”).
                         4. 2015 International Fire Code (the “2015 IFC”).
                         5. 2015 International Property Maintenance Code (the “2015 IPMC”).
                         6. 2015 International Existing Building Code (the “2015 IEBC”).
                         7. 2017 Uniform Code Supplement (the “2017 Supplement”), and other
                              standards referenced in 19 NYCRR Parts 1219 through 1228. 
          B.         The contractor shall be aware of, and comply with, contractor requirements
                            identified in the above-referenced codes and standards; for example, but
                            not limited to:
                        1. OSHA (Occupational Safety and Health Administration).
                        2. 2015 IBC- Chapter 33 Safeguards During Construction.
                        3. 2015 IEBC- Chapter 15 Construction Safeguards.
                        4. 2015 IFC– Chapter 33 Fire Safety During Construction and Demolition,
                            Chapter 35 Welding and Other Hot Work (which governs safety during
                            construction). 
          C.         All Work shall comply with the New York State Energy Conservation
                     Construction Code (“Energy Code”) promulgated pursuant to Article 11 of the
                     New York State Energy Law. The Energy Code is contained in 19 NYCRR, Part
                     1240, and in the publications incorporated by reference in 19 NYCRR Part 1240.
                     The publications incorporated by reference in 19 NYCRR Part 1240 include:
                     1.      The publication entitled “2015 International Energy Conservation Code”
                             (Second Printing: May 2015) published by International Code Council,
                             Inc.
Updated 04/16/2019
Printed 04/26/2019                              014100 - 1                Project No. 44972-C,H,P,E
                     2.      The publication entitled “ANSI / ASHRAE / IES Standard 90.1-2013,
                             Energy Standard for Buildings Except Low-Rise Residential Buildings”
                             (July 2014 Printing), published by American Society of Heating,
                             Refrigeration and Air-Conditioning Engineers, Inc.
                     3.      The publication entitled “2016 Supplement to the New York State
                             Energy Conservation Construction Code” (Publication Date: August
                             2016) published by the New York State Department of State.
                     4.      The other referenced standards mentioned and/or referred to in 19
                             NYCRR Part 1240.
1.04 LISTINGS
          A.         Conform to the fire rating classifications based upon the test methods and
                     acceptance criteria in the “Standard for Fire Tests of Building Construction and
                     Materials” for which Underwriters’ Laboratories, Inc. (UL) provides listings.
                     1.      Materials and assemblies shall comply with the acceptance criteria,
                             detailed description of the assembly, its performance in the fire test, and
                             other pertinent details such as specification of materials, Classification
                             coverage, and alternate assembly details.
                     2.      Alternatively, fire resistance rating classifications by other issuing
                             organizations listed in the New York State Uniform Fire Prevention and
                             Building Code are acceptable.
          A.         Perform Work required to remove, disturb, or repair any material that contains
                     less than 1 percent by weight of asbestos (trace) in accordance with all applicable
                     OSHA regulations (29 CFR Part 1926.1101).
Updated 04/16/2019
Printed 04/26/2019                               014100 - 2                  Project No. 44972-C,H,P,E
PART 2 PRODUCTS (Not Used)
END OF SECTION
Updated 04/16/2019
Printed 04/26/2019               014100 - 3    Project No. 44972-C,H,P,E