Questionnaire: 1. Content
Questionnaire: 1. Content
1/13 03
Questionnaire
Date Author:
26.02.2018 Šuško
1. CONTENT
2. Our Company
3. Certification
4. General Information
5. Purchase, Laboratory and Goods Receiving
6. Crisis Management
7. Foreign Object Management
8. Cleaning Agents and other Materials
9. Food Fraud/ Product Adulteration
10. HACCP
11. Dealing with GMO/ Irradiation and Allergen, Product Information
12. Hygiene/ Housekeeping
13. Ethics and Social Responsibility
14. Environment
15. Premises/ Other
16. Logistic and Shipment
17. Site Security
18. Verification and Validation of the System
Appendix 1. Abbreviations
Appendix 2. Flow Chart Re-cleaning
Appendix 3. Grinding
Appendix 4. Blending
Appendix 5. HACCP Plan Monitoring Plan
2. OUR COMPANY
N° Questions: Comment:
2.1 Company established date: 1991
2.2 Name: AKO GmbH
Address: Chemnitzer Straße 14-16, 30952 Ronnenberg, Germany
2.3 Phone number/Fax: +49 (0) 511 94685-0 / +49 (0) 511 94685-55
Email: info@ako-gewuerze.de
2.4 Website address: http://www.ako-spice.com
2.5 Number of people employed: Approx. 30
Import, trading and processing of raw spices and herbs,
2.6 Nature of business:
production of special-blends
2.7 Belonging to group: Salz Richter Verwaltung Olaf Richter e.K.
Is there product liability
2.8 Yes, Allianz Insurance
insurance in place?
Is there product recall
2.9 Yes, Allianz Insurance
insurance?
2.10 Describe your sourcing Exporters of raw spices and herbs worldwide
2.11 Assortment:
FSSC 22000 is an internationally recognized Management system for Food Safety, for all chains of food
production. It is not a private standard, but based on international standards and is GFSI recognized.
All information above comply with the current state of our management system for food
safety und have no legal claim to completeness/ liability.
Creation reference
Publisher Date Signature
QMB 26.02.2018
Release note
Page Revision
9/13 03
Questionnaire
Date Author:
26.02.2018 Šuško
Appendix 1. Abbreviations
Warehouse
Staff Warehouse
Production Plan Allo cation Raw
Form Re-cleaning
WI Re-cleaning Material/Packaging
Material
Staff Recleaning
ja
Staff Recleaning
Form Re-cleaning
Start P roducti on
Recleanin g
Magnet stre ngth
900 0 Gau ss
Staff Recleaning Staff Recleaning CP
Form Re-cleaning
WI Re-cleaning Control Sieves/Sieve
Control Ma gnets
Frame
Staff Recleaning
Ok? no Stop Prod uction, Info Continous Co ntro ls
WI Re-cleaning Head of P roducti on Form Re-cleaning duri ng Production
CCP 1 yes
yes
Staff Recleaning
PL / QS
Closing & Lab elling Form Block/
WI Re-cleaning Packaging Lau nch further Actio ns Destruction Protocol
or destroy goo ds
Go to P rocess
Wareho useing
Page Revision
11/13 03
Questionnaire
Date Author:
26.02.2018 Šuško
Production Staff
Sieve size 0,8 – 1,2 (4,0) mm
WI Grinding Control Sieves
dep ending of product
Production Staff
Power of mag nets 900 0
Exchange Sie ves i.O.
Gau ss
Pro duction sto p no
yes
Production Staff
Cool down Produ ct
(Dry Ice)
CCP1
yes yes
i.O.
Production Staff
Form Block/
Stopp Pro duction, Info Destruction Protocol
Pro duction Head &
no Lab
yes
Grinding Finished
Products Pro duct Head of Prod./Lab
Analyses Report
WI Lab test Finished Production Staff
Product
Controls
Packaging/Lab elling
EDP-System
Goi ng to process
-Blen ding
-Repacking (1kg)
- Wareho using
Page Revision
12/13 03
Questionnaire
Date Author:
26.02.2018 Šuško
Information about
the spice
Production plan
WI Grinding Maintenance
Prod.Leitung
Lot Nummber s/
Recipe
Form Recipe
Employee Employee 2
Control
Premix
Einwaa ge/Lot
Produce Number
Employee
Waage set,
Magne t use
Employee
Abnahme-
sack/Big Bag
attach
Employee
Control Mi xer
Employee & Magne te
Mixer fill
CP
Employee
Employee
Mix
Control mi x time
Employee
Onl y Salt B lend
Employee Sievecontroll
Inte rme diatehopp er
Ope ning
WI Laboratory Employee
End product Form Nitri t
Tests controll
Packaging (Bigb ag etc.), Determination
OD Test plan Form L aboratory tests
Identifie r, on Pal. Stackin g,
Final products Ship me nt Wareh ouse
Booking
WI Grinding
WI Cleaning
instruction
Mixing
Clean machine, Workplace
clean, Packaging ma teri al
and Residues dispose
Page Revision
13/13 1
Questionnaire
Date Author:
07.09.15 Salihovic
Monitoring Corrective
Process step CCP Limit action when Note
Hazard
What? How? Frequency Who? limits are
Cleaning Top sieve suffers CCP from 3,6 to 10 mm Control from Visual After each Machine Information to - WI Re-cleaning
Spices loss of function, (depending on upper sieve inspection for product change worker production - Form Re-cleaning
foreign body in product) sieving (Fill manager, sieving, - WI Material/
repeat the cleaning Machinery breakage
goods Particle size bigger level)
process -WI Blocked goods
2,0 to. 4,75 mm =
- Form Block-/
lower sieve size Extermination- and
depending on Rework protocol
product
Grinding Damaged sieve, CCP Damaged Sieve Control Visual After each Machine Information to - Form Mill
Foreign bodies/ Particle size of 800 sieves inspection for product change production -WI Blocking
sieve to 4000 mµ intactness manager, product - Form Block-/
stop, visual control, Extermination and Rework
constituents depending on
sieving or product protocol
coming in goods product
destruction - WI Material/
Machine breakage