PT.
ABB SAKTI INDUSTRI
                                    CALCULATION
Project :
                                      GI 150kV PELANGGAN
                               PT. STAR AJIBARANG PURWOKERTO
  Title :
                                   CT SIZING CALCULATION
Reference Drawing :
                         SLD          START-EM-PRJ-001
 Rev No     Date                     Remarks               Prepare   Check   Approve
                                                     GI 150kV PELANGGAN
PT. ABB SAKTI INDUSTRI                                                                                           BAY TRANSFORMER
                                              PT. STAR AJIBARANG PURWOKERTO
                                           CT SIZING CALCULATION
               SELECTION OF PARAMETER OF CURRENT TRANSFORMER FOR BAY TRANSFORMER
     Maxsimum cable route length CT to relay panel located in switcyard control building                   75      meters
        Core 1
     Purpose                                                                             Transformer Differential Protection
     Rasio                                                                                               250/1      A
                   Primary Current                               Ipn                                      250      A
                  Secodary Current                               Isn                                        1      A
     Rated Current of the protection IED                         Ir                                         1      A
     Accuracy Class                                                                                         X
     Burrden                                                                                               30      VA
     MVA Rated of the Transformer                                 P                                        50      MVA
     impedance of the transformer                                 Z                                        12      %
     Rated Primary Current of the transformer                    Int                                     192.45    A
     Rated primary Voltage of the transformer                   Vnt                                       150      kV
     Maximum primary fundamental frequency
                                                                                                         1.604
     that passed thru main CT and the power Trafo
                                                                 Itf                                     1.604     kA
     Conductor cross-section                                                                                6      mm²
     Conductor material                                                                                  Copper
     Number of runs per phase                                                                               1
     Conductor unit resistance                                                                            3.08     Ω/km
     lead Resistance at 20⁰C                                   CF+CT                     Rc               3.75     Ω
                                                     Rc =                  xR
     lead Resistance at 70⁰C                                   CF+WT
     Two way lead loop resistance                                RL                                       1.73     Ω
     Relay Burden for RET650 (ABB make)                          Pb                                       0.25     VA
                                                                 Rb        Pb/(Isn)²=Ω                    0.25     Ω
     Total connected burden = Lead Burden + Instrumen Burden                                              1.98     VA
     Current Transformer knee point voltage requirment
     Equation 1                  Vk          30 x Int x Isn/Ipn x (Rct+RL+Rb/Ir²)                        91.93     V
     Rct is current transformer secondary winding resistance at 75⁰C at selected ratio                      2      Ω
     Current transformer knee point voltage requirment Vk                                                91.93     V
                   Knee point volatge of CT
                   Vk = ALF x Is (VA/(Is²)+ (Is x Rct)) V
                                                                 Vk                                       640      V
                   Required knee point voltage is less than selected,Hence CT selected is adequate.
                   where
                      RC is the corrected resistance
                      RM is the measured resistance
                      CF is the correction factor for copper (234.5) or aluminum (225) windings
                      CT is the corrected temperature (75°C or 85°C)
                      WT is the winding temperature (°C) at time of test
                                                                                                                        Page : 3 of 13
                                                     GI 150kV PELANGGAN
PT. ABB SAKTI INDUSTRI                                                                                    BAY TRANSFORMER
                                              PT. STAR AJIBARANG PURWOKERTO
        Core 2
     Purpose                                                                                  O/C & E/F Prot
     Rasio                                                                                        250/1     A
                   Primary Current                              Ipn                                250      A
                  Secodary Current                              Isn                                 1       A
     Rated Current of the protection IED                        Ir                                  1       A
     Accuracy Class                                                                                 X
     Burrden                                                                                       30       VA
     MVA Rated of the Transformer                                P                                 50       MVA
     impedance of the transformer                                Z                                 12       %
     Rated Primary Current of the transformer                   Int                              192.45     A
     Rated primary Voltage of the transformer                  Vnt                                 150      kV
     Maximum primary fundamental frequency                               P
                                                                                                  1.604
     that passed thru main CT and the power Trafo                     V3xZxVnt
                                                                Itf                               1.604     kA
     Conductor cross-section                                                                        6       mm²
     Conductor material                                                                          Copper
     Number of runs per phase                                                                       1
     Conductor unit resistance                                                                    3.08      Ω/km
     lead Resistance at 20⁰C                                  CF+CT                      Rc       3.75      Ω
                                                     Rc =                 xR
     lead Resistance at 70⁰C                                  CF+WT
     lead loop resistance                                       RL                                1.73      Ω
     Lead Burden                                                                                  1.73      VA
     Relay Burden for REF615 (ABB make)                         Pb                                0.05      VA
                                                                Rb        Pb/(Isn)²=Ω             0.05      Ω
     Total connected burden = Lead Burden + Instrumen Burden                                      1.78      VA
     Current Transformer knee point voltage requirment
     Equation 1                  Vk          30 x Int x Isn/Ipn x (Rct+RL+Rb/Ir²)                 87.31     V
     Rct is current transformer secondary winding resistance at 75⁰C at selected ratio              2       Ω
     Current transformer knee point voltage requirment Vk                                         87.31     V
                   Knee point volatge of CT
                   Vk = ALF x Is (VA/(Is²)+ (Is x Rct)) V
                                                                Vk                                 640      V
                                                                                                                 Page : 4 of 13
                                                  GI 150kV PELANGGAN
PT. ABB SAKTI INDUSTRI                                                                              BAY TRANSFORMER
                                           PT. STAR AJIBARANG PURWOKERTO
        Core 3
     Purpose                                                                               Metering
     Rasio                                                                                  250/1     A
                   Primary Current                            Ipn                            250      A
                  Secodary Current                            Isn                             1       A
     Rated Current of the protection IED                       Ir                             1       A
     Accuracy Class                                                                          0.5
     Burrden                                                                                 30       VA
     MVA Rated of the Transformer                              P                             50       MVA
     impedance of the transformer                              Z                             12       %
     Rated Primary Current of the transformer                 Int                          192.45     A
     Rated primary Voltage of the transformer                 Vnt                            150      kV
     Maximum primary fundamental frequency                             P
                                                                                            1.604
     that passed thru main CT and the power Trafo                    V3xZxV
                                                               Itf                          1.604     kA
     Conductor cross-section                                                                  6       mm²
     Conductor material                                                                    Copper
     Number of runs per phase                                                                 1
     Conductor unit resistance                                                               3.08     Ω/km
     lead Resistance at 20⁰C                                 CF+CT                    Rc     3.75     Ω
                                                Rc =                    xR
     lead Resistance at 70⁰C                                CF+WT
     lead loop resistance                                     RL                             1.73     Ω
     Lead Burden                                                                             1.73     VA
     Metering Relay Burden                                    Pb                             0.3      VA
                                                              Rb        Pb/(Isn)²=Ω          0.3      Ω
     Total connected burden = Lead Burden + Instrumen Burden                                 2.03     VA
                   Required Burden is less than selected,Hence CT selected is adequate.
                                                                                                           Page : 5 of 13
                                GI 150kV PELANGGAN
PT. ABB SAKTI INDUSTRI                                   BAY TRANSFORMER
                         PT. STAR AJIBARANG PURWOKERTO
                                                             Page : 6 of 13
                                                     GI 150kV PELANGGAN
PT. ABB SAKTI INDUSTRI                                                                                       BAY OVER HEAD LINE
                                              PT. STAR AJIBARANG PURWOKERTO
                                           CT SIZING CALCULATION
               SELECTION OF PARAMETER OF CURRENT TRANSFORMER FOR BAY OVER HEAD LINE
     Maxsimum cable route length CT to relay panel located in switcyard control building                150       meters
        Core 1
     Purpose                                                                                      Line Differential
     Rasio                                                                                             600/1      A
                   Primary Current                               Ipn                                    600       A
                  Secodary Current                               Isn                                     1        A
     Rated Current of the protection IED                         Ir                                      1        A
     Accuracy Class                                                                                      X
     Burrden                                                                                             30       VA
     MVA Rated of the Transformer                                 P                                     100       MVA
     impedance of the transformer                                 Z                                      12       %
     Rated Primary Current of the transformer                    Int                                  384.90      A
     Rated primary Voltage of the transformer                   Vnt                                     150       kV
     Maximum primary fundamental frequency
                                                                                                       3.208
     that passed thru main CT and the power Trafo
                                                                Imax                                   3.208      kA
     Conductor cross-section                                                                             6        mm²
     Conductor material                                                                               Copper
     Number of runs per phase                                                                            1
     Conductor unit resistance                                                                          3.08      Ω/km
     lead Resistance at 20⁰C                                   CF+CT                     Rc             3.75      Ω
                                                     Rc =                  xR
     lead Resistance at 70⁰C                                   CF+WT
     Two way lead loop resistance                                RL                                     3.46      Ω
     Relay Burden for RED650 (ABB make)                          Pb                                     0.15      VA
                                                                 Rb        Pb/(Isn)²=Ω                  0.15      Ω
     Total connected burden = Lead Burden + Instrumen Burden                                            3.61      VA
     Current Transformer knee point voltage requirment
     Equation 1                  Vk          30 x Int x Isn/Ipn x (Rct+RL+Rb/Ir²)                     107.98      V
     Rct is current transformer secondary winding resistance at 75⁰C at selected ratio                   2        Ω
     Current transformer knee point voltage requirment Vk                                             107.98      V
                   Knee point volatge of CT
                   Vk = ALF x Is (VA/(Is²)+ (Is x Rct)) V
                                                                 Vk                                     640       V
                   Required knee point voltage is less than selected,Hence CT selected is adequate.
                   where
                      RC is the corrected resistance
                      RM is the measured resistance
                      CF is the correction factor for copper (234.5) or aluminum (225) windings
                      CT is the corrected temperature (75°C or 85°C)
                      WT is the winding temperature (°C) at time of test
                                                                                                                       Page : 7 of 13
                                                     GI 150kV PELANGGAN
PT. ABB SAKTI INDUSTRI                                                                                  BAY OVER HEAD LINE
                                              PT. STAR AJIBARANG PURWOKERTO
        Core 2
     Purpose                                                                                  O/C & E/F Prot
     Rasio                                                                                        600/1     A
                   Primary Current                              Ipn                                600      A
                  Secodary Current                              Isn                                 1       A
     Rated Current of the protection IED                        Ir                                  1       A
     Accuracy Class                                                                               5P20
     Burrden                                                                                       30       VA
     MVA Rated of the Transformer                                P                                 100      MVA
     impedance of the transformer                                Z                                 12       %
     Rated Primary Current of the transformer                   Int                              384.90     A
     Rated primary Voltage of the transformer                  Vnt                                 150      kV
     Maximum primary fundamental frequency
                                                                                                  3.208
     that passed thru main CT and the power Trafo
                                                               Imax                               3.208     kA
     Conductor cross-section                                                                        6       mm²
     Conductor material                                                                          Copper
     Number of runs per phase                                                                       1
     Conductor unit resistance                                                                    3.08      Ω/km
     lead Resistance at 20⁰C                                  CF+CT                      Rc       3.75      Ω
                                                     Rc =                xR
     lead Resistance at 70⁰C                                  CF+WT
     Two way lead loop resistance                               RL                                3.46      Ω
     Relay Burden for REF615 (ABB make)                         Pb                                0.05      VA
                                                                Rb       Pb/(Isn)²=Ω              0.05      Ω
     Total connected burden = Lead Burden + Instrumen Burden                                      3.51      VA
     Current Transformer knee point voltage requirment
     Equation 1                  Vk          30 x Int x Isn/Ipn x (Rct+RL+Rb/Ir²)                106.06     V
     Rct is current transformer secondary winding resistance at 75⁰C at selected ratio              2       Ω
     Current transformer knee point voltage requirment Vk                                        106.06     V
                   Knee point volatge of CT
                   Vk = ALF x Is (VA/(Is²)+ (Is x Rct)) V
                                                                Vk                                 640      V
                                                                                                                 Page : 8 of 13
                                                  GI 150kV PELANGGAN
PT. ABB SAKTI INDUSTRI                                                                          BAY OVER HEAD LINE
                                           PT. STAR AJIBARANG PURWOKERTO
        Core 3
     Purpose                                                                             Metering
     Rasio                                                                                600/1     A
                  Primary Current                            Ipn                           600      A
                  Secodary Current                           Isn                            1       A
     Rated Current of the protection IED                       Ir                           1       A
     Accuracy Class                                                                        0.2
     Burrden                                                                               30       VA
     MVA Rated of the Transformer                              P                           100      MVA
     impedance of the transformer                              Z                           12       %
     Rated Primary Current of the transformer                Int                         384.90     A
     Rated primary Voltage of the transformer                Vnt                           150      kV
     Maximum primary fundamental frequency
                                                                                          3.208
     that passed thru main CT and the power Trafo
                                                              Itf                         3.208     kA
     Conductor cross-section                                                                6       mm²
     Conductor material                                                                  Copper
     Number of runs per phase                                                               1
     Conductor unit resistance                                                             3.08     Ω/km
     lead Resistance at 20⁰C                                CF+CT                   Rc     3.75     Ω
                                                Rc =                  xR
     lead Resistance at 70⁰C                               CF+WT
     Two way lead loop resistance                            RL                            3.46     Ω
     Metering Relay Burden                                   Pb                            0.3      VA
                                                             Rb       Pb/(Isn)²=Ω          0.3      Ω
     Total connected burden = Lead Burden + Instrumen Burden                               3.76     VA
                  Required Burden is less than selected,Hence CT selected is adequate.
                                                                                                         Page : 9 of 13
                                                     GI 150kV PELANGGAN
PT. ABB SAKTI INDUSTRI                                                                              BAY OVER HEAD LINE
                                              PT. STAR AJIBARANG PURWOKERTO
        Core 4
     Purpose                                                                                  SPARE
     Rasio                                                                                    600/1     A
                   Primary Current                              Ipn                            600      A
                  Secodary Current                              Isn                             1       A
     Rated Current of the protection IED                        Ir                              1       A
     Accuracy Class                                                                             X
     Burrden                                                                                   30       VA
     MVA Rated of the Transformer                                P                             100      MVA
     impedance of the transformer                                Z                             12       %
     Rated Primary Current of the transformer                   Int                           384.90    A
     Rated primary Voltage of the transformer                  Vnt                             150      kV
     Maximum primary fundamental frequency
                                                                                              3.208
     that passed thru main CT and the power Trafo
                                                               Imax                           3.208     kA
     Conductor cross-section                                                                    6       mm²
     Conductor material                                                                       Copper
     Number of runs per phase                                                                   1
     Conductor unit resistance                                                                 3.08     Ω/km
     lead Resistance at 20⁰C                                  CF+CT                      Rc    3.75     Ω
                                                     Rc =                xR
     lead Resistance at 70⁰C                                  CF+WT
     Two way lead loop resistance                               RL                             3.46     Ω
     Relay Burden for Spare                                     Pb                             0.25     VA
                                                                Rb       Pb/(Isn)²=Ω           0.25     Ω
     Total connected burden = Lead Burden + Instrumen Burden                                   3.71     VA
     Current Transformer knee point voltage requirment
     Equation 1                  Vk          30 x Int x Isn/Ipn x (Rct+RL+Rb/Ir²)             109.91    V
     Rct is current transformer secondary winding resistance at 75⁰C at selected ratio          2       Ω
     Current transformer knee point voltage requirment Vk                                     109.91    V
                   Knee point volatge of CT
                   Vk = ALF x Is (VA/(Is²)+ (Is x Rct)) V
                                                                Vk                             640      V
                                                                                                            Page : 10 of 13
                                GI 150kV PELANGGAN
PT. ABB SAKTI INDUSTRI                                   BAY OVER HEAD LINE
                         PT. STAR AJIBARANG PURWOKERTO
                                                              Page : 11 of 13
                                             GI 150kV PELANGGAN
PT. ABB SAKTI INDUSTRI                PT. STAR AJIBARANG PURWOKERTO
                  PARAMETERS OF CURRENT TRANSFORMERS
                   SELECTION OF PARAMETER OF CURRENT TRANSFORMER FOR ALL BAY
     Bay Transformer
                                                 Selected   Calculated Required   Proposed
                  Ratio CT                Rct
        Core                  Class               Burden     Burden      Vk       Equiv. Vk   Device
                       [A]                [Ω]      [VA]       [VA]       [V]         [V]
          1       250-500/1    X          ≤2       30         1.98      91.93      640.00     RET650
          2       250-500/1    X          ≤2       30         1.78      87.31      640.00     REF615
          3       250-500/1 5P20+0,5       -       30         2.03        -           -       Metering
     Bay Line
                                                 Selected   Calculated Required   Proposed
                  Ratio CT                Rct
        Core                  Class               Burden     Burden      Vk       Equiv. Vk   Device
                       [A]                [Ω]      [VA]       [VA]       [V]         [V]
          1       300-600/1    X          ≤2       30         3.61      107.98     640.00     RED670
          2       300-600/1    X          ≤2       30         3.51      106.06     640.00     REF615
          3       300-600/1    0.2         -       30         3.76        -           -       Metering
          4       300-600/1    X           -       30         3.71      109.91     640.00       N/A
                                                                                              Page : 12 of 13
                                GI 150kV PELANGGAN
PT. ABB SAKTI INDUSTRI   PT. STAR AJIBARANG PURWOKERTO
                                                         Page : 13 of 13