2 x 7 MW ENDE NTT COAL FIRED POWER PLANT
70KV SWITCHYARD
FIELD TEST REPORT
page: 1/1 PT PLN (PERSERO)
Rev-0: 4 July 2008 PRIMARY INJECTION Form No.: NTT-EDR-PI-1207
I PRIMARY INJECTION 100 A
100A
P2
Core #1
Core #2
Core #3
Core #4
P1
PHASE R CORE #1 READING CORE #2 READING CORE #3 READING CORE #4 READING
BAY #1 400/1 N/A 400/1 100.1 A 400/1 99.9 A 800/1 100.1 A
BAR #2 400/1 100.2 A 400/1 99.9 A 400/1 99.8 A 800/1 100 A
BAY #3 200/5 100 A 200/1 100 A 200/1 101 A 800/1 99.9 A
BAY #4A 800/1 101 A 800/1 0.12 x In
BAY #4B 800/1 100 A 800/1 100 A Core #2 is used for Analog Meter
Bay #5 200/5 101 A 200/1 0.5 x In 200/1 100 A 800/1 100 A
BAY #6 200/5 200/1 200/1 800/1
MAIN PROTEC. BACKUP PROT. METER BUS BAR PROT.
PHASE S CORE #1 READING CORE #2 READING CORE #3 READING CORE #4 READING
BAY #1 400/1 N/A 400/1 99.8 A 400/1 99.9 A 800/1 100.2 A
BAR #2 400/1 100.1 A 400/1 100.0 A 400/1 99.8 A 800/1 100.0 A
BAY #3 200/5 100 A 200/1 0.5 x In 200/1 101 A 800/1 101 A
BAY #4A 800/1 100 A 800/1 0.12 x In
BAY #4B 800/1 102 A 800/1 100 A Core #2 is used for Analog Meter
Bay #5 200/5 100 A 200/1 0.5 x In 200/1 99.8 A 800/1 99.7 A
BAY #6 200/5 101 A 200/1 0.5 x In 200/1 100 A 800/1 102 A
MAIN PROTEC. BACKUP PROT. METER BUS BAR PROT.
PHASE T CORE #1 READING CORE #2 READING CORE #3 READING CORE #4 READING
BAY #1 400/1 N/A 400/1 99.9 A 400/1 100.0 A 800/1 100 A
BAR #2 400/1 100.2 400/1 99.7 A 400/1 100.0 A 800/1 99.9 A
BAY #3 200/5 101 A 200/1 0.5 x In 200/1 100 A 800/1 101 A
BAY #4A 800/1 102 A 800/1 0.12 x In
BAY #4B 800/1 101 A 800/1 100 A Core #2 is used for Analog Meter
Bay #5 200/5 101 A 200/1 0.5 x In 200/1 99.7 A 800/1 100 A
BAY #6 200/5 99.9 A 200/1 0.5 x In 200/1 99.8 A 800/1 100 A
MAIN PROTEC. BACKUP PROT. METER BUS BAR PROT.
TEST DATE TESTED BY WITNESS-1 WITNESS-2 WITNESS-3 REMARKS
ENDIRA
19-Jun-11 Roliman/Meychel