KISII NATIONAL POLYTECHNIC
CLAFT CERTIFICATE IN PLUMBING
PLS21
TIME 2 1/2 HRS
TRADE THEORY
INSTRUCTIONS
    Answer any 5 questions on this paper
    Do not write on a question paper
1.
       a) List 6 waste appliances (6mks)
       b) Name 4 soil fittings (4mks)
     (c) Explain the following processes of water treatment (6mks)
   I.      Sedimentation
  II.      Filtration
 III.      Chlorination
     (d) State the composition of each of the following alloys (4mks)
      i.   Solder
     ii.   Bronze
2. (a) sketch a well labelled section through a pressure filter in water treatment, explain how it works and
state it’s two advantages (10mks)
     (b) State TEN principles to be considered when installing single stack system (10mks)
     (b) Draw and label an indirect cold water supply system (8mks)
     (C)Name two awareness measures of preventing accidents (2mks)
3. (a) Sketch a labeled single diagram or a dual pipe system (10mks)
(b) Describe three maintenance practice of tools (10mks)
4. (a) With aid of a well labeled diagram draw the ground water source (10mks)
     (b) State four types of fire extinguishers (4mks)
     (c) State four examples of taps (4mks)
     (d) Name two impurities in domestic water (4mks)
5. (a) Start the three method of pending water pipes (3mks)
      (b) Explain the functions of a ball valve in a water supply system (3mks)
      (c) Differentiate a waste appliance from a soil appliance (5mks)
       (d) With the aid of a well labeled diagram draw the rain cycle and explain (10mks)
6. (a) State 10 principles to be considered when installing a single stack system (10mks)
        (b) Distinguish between ferrous and non-ferrous metals and state two examples in each (4mks)
        (c) State four types of a ball valve (4mks)
    (d) State four heat treatment processes (2mks)
7. (a) By means of a labeled sketch illustrate the method used to connect pipes to duplicate cold water
storage tanks given that either system can be isolated without affecting the water supply (7mks)
   (b) State the three sources of water (3mks)
8. (a) Sketch the followings tools used in plumbing (6mks)
   i.      Pipe wrench
  ii.      Scriber
(b) State three examples of tools in each of the following (12mks)
  I.       Cutting tools
 II.       Forming tools
III.       Fastening tools
IV.        Assembling tools
(b) State two systems of above ground drainage (2mks)