fia, afte wR & fare fafedi @ faa fea
are 10
Explain different methods used for domestic service
connection with diagram.
sree
Or
Ge Aiwa haa & afte one & fore maser tan sf!
fama vite kW 81 1-75, 230 V, 50 Hz Wem OE er
are Ge ween tein at) affa Taw a 20m FEL
Prepare an estimate for service line connection for a
single storey building hi
‘The supply isto be given on I-phase, 230 V, $0 Hz. Use
bracket pole arrangement. Service pole is at 20 m from
ing connected load of $ kW.
house. cs\tuonline.com
ral
Unit-IV
Go) erm fr fea afr Figs s
Write short notes on stay connection with diagram.
224512(24)024612(24) Pro
im
Or
16 tae Se a aR eer eG Og ee wd
feat rat $2
How are market survey conducted to know the cost of
1-9 Induction motor,
abv
Unit-VE
6, oF. eres es fame shee wet Ce ME TH
“arg aren here EP s
‘What are the possible phuses when a 3-9 squirrel
case induction motor runs ht. ¢svtuonline.com
Q-8 25 HP, 3, 4, 50H ore Hee IR
ti nwer wt ye wafer fey tare
afar 10
A25 HP, 3-4, 440V, 50H, induction motor is
defected. Prepare the estimate and cost of rewinding
materials224512(24)
www.csviuenline.com
www.csvtuonline.com
14]
What is the differnece between AAC and ACSR?
8 Lkm LT. et mn wae wind a ar wun afed 36,
5 aR 20 mm? ACSR ark, PCC Fa Satu frag
sfRTT 67 m PIA By tare sree 10
Estimate the material required and cost for 1 km L. T.
line, 36, 5 wire. ACSR conductor 20mm?, PCC pole.
Vertical formation and maximum length of span of 67
UW0D*OUTTUONPASI'ALALAL
meter,
Of rng 2 a Per AR OT aa wa A Ga TTT
a ona wt 10
Draw a neat sketch of fly-stay and estimating the material
required.
10. fret ra arts gE wa A ee AMIR faa
WM UW 100 KVA, 11/0-4 kV So Hz aa eae Ya
ae wari st at a sae darn ssw 10
Estimating the quantity of materials and the cost of creating
100 kVA, 11/0-4 kV, 50 Hz pole mounted transformer
substation support the estimate by drawing neat and
TOd‘dUI[UONJASIALALAL
Propotionate sketch of sub station?
224512(24)
www.csvtuonline.comcath cet er wor Serr. AN ao OT
woe 25m» YO < dn er 1
asian /besn2i0
slnstivcsnsstnaine com
http://www.csveuontine.com: ,
rst
Prepare an estimate for a single phase service
connection at 10 m distance from the baiting and
having 4 kW load,
4. (a) Hun kv mba eh et pert
aneem dan Aft oa PC. ther d 100m at.
al . wot BE 40
Prepare the estimate of material and cost for. 1 km,
11 kV line. Using P.C.C. pole-st 100 m span,
faite aeenget
Or 3
se ee ok 2
: ; E
ASpain different methods of laying inten
distyi¥ution cable.
Coy ven aor Pr aerge arn Sea ery aT
aor adh aaa Seer Sec WATE a)
Draw a ricat sketch of fly stay and: enlist differen :
material required fori it and its use,'sTaY
STAY INSULATOR,
Ms STAY
BASE PLATE
Fig. 10.65B STAYING (FLYING) OF 11 kV OVERHEAD LINE SUPPORT
S.No] Description of Material With Quantity ‘Rate ‘Amount | Rawakb
| Complete Specifications Required
| Quantity] nit | & | P| Perl © [P
1. PCC poles 9 metre long 1 no |3,500 |00 | each} 3,500 |o0
2. |MS anchor plate 45cmx 45emx 6.0em| 1 do | 70000 | do} 700 Joo
| (not galvanised)
3. |MS stay rod 16mm diameter and 242m| 1 do | 700 Joo} do} 700 Joo
ong
4. | Stay bow made out of MS rod 13 mm 1 do | 450 |00| do} 450 |oo
diameter
5. | Stay insulator 1 do | 150]00| do} 150 oo
| Stay wire (7/8 SWG GI wire) it | kg 270/00} kg | 4.590 oo
| Stay clamps 2 | mos ) 75/00 Jeach| 150 Joo
8 | 16mm diameter, 76 mm long bolts and 4 do | 45}00] do| 180 |00
nuts
9. | MS thimbles 2 do | 15 ]00] do} 30 00 |Lump-sum
10. | Sundries to complete the job provision 800 |00 [provision
Total |11,250 [00
Storage and transportation 5% | 562 |50
Labour charges 20% | 2,250 |00 |Being small
work
Contingencies 10% | 1,125 |00
15,187 [50