0% found this document useful (0 votes)
216 views5 pages

Stay Wire

Hand notes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
216 views5 pages

Stay Wire

Hand notes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 5
fia, afte wR & fare fafedi @ faa fea are 10 Explain different methods used for domestic service connection with diagram. sree Or Ge Aiwa haa & afte one & fore maser tan sf! fama vite kW 81 1-75, 230 V, 50 Hz Wem OE er are Ge ween tein at) affa Taw a 20m FEL Prepare an estimate for service line connection for a single storey building hi ‘The supply isto be given on I-phase, 230 V, $0 Hz. Use bracket pole arrangement. Service pole is at 20 m from ing connected load of $ kW. house. cs\tuonline.com ral Unit-IV Go) erm fr fea afr Figs s Write short notes on stay connection with diagram. 224512(24)024612(24) Pro im Or 16 tae Se a aR eer eG Og ee wd feat rat $2 How are market survey conducted to know the cost of 1-9 Induction motor, abv Unit-VE 6, oF. eres es fame shee wet Ce ME TH “arg aren here EP s ‘What are the possible phuses when a 3-9 squirrel case induction motor runs ht. ¢svtuonline.com Q-8 25 HP, 3, 4, 50H ore Hee IR ti nwer wt ye wafer fey tare afar 10 A25 HP, 3-4, 440V, 50H, induction motor is defected. Prepare the estimate and cost of rewinding materials 224512(24) www.csviuenline.com www.csvtuonline.com 14] What is the differnece between AAC and ACSR? 8 Lkm LT. et mn wae wind a ar wun afed 36, 5 aR 20 mm? ACSR ark, PCC Fa Satu frag sfRTT 67 m PIA By tare sree 10 Estimate the material required and cost for 1 km L. T. line, 36, 5 wire. ACSR conductor 20mm?, PCC pole. Vertical formation and maximum length of span of 67 UW0D*OUTTUONPASI'ALALAL meter, Of rng 2 a Per AR OT aa wa A Ga TTT a ona wt 10 Draw a neat sketch of fly-stay and estimating the material required. 10. fret ra arts gE wa A ee AMIR faa WM UW 100 KVA, 11/0-4 kV So Hz aa eae Ya ae wari st at a sae darn ssw 10 Estimating the quantity of materials and the cost of creating 100 kVA, 11/0-4 kV, 50 Hz pole mounted transformer substation support the estimate by drawing neat and TOd‘dUI[UONJASIALALAL Propotionate sketch of sub station? 224512(24) www.csvtuonline.com cath cet er wor Serr. AN ao OT woe 25m» YO < dn er 1 asian /besn2i0 slnstivcsnsstnaine com http://www.csveuontine.com: , rst Prepare an estimate for a single phase service connection at 10 m distance from the baiting and having 4 kW load, 4. (a) Hun kv mba eh et pert aneem dan Aft oa PC. ther d 100m at. al . wot BE 40 Prepare the estimate of material and cost for. 1 km, 11 kV line. Using P.C.C. pole-st 100 m span, faite aeenget Or 3 se ee ok 2 : ; E ASpain different methods of laying inten distyi¥ution cable. Coy ven aor Pr aerge arn Sea ery aT aor adh aaa Seer Sec WATE a) Draw a ricat sketch of fly stay and: enlist differen : material required fori it and its use, 'sTaY STAY INSULATOR, Ms STAY BASE PLATE Fig. 10.65 B STAYING (FLYING) OF 11 kV OVERHEAD LINE SUPPORT S.No] Description of Material With Quantity ‘Rate ‘Amount | Rawakb | Complete Specifications Required | Quantity] nit | & | P| Perl © [P 1. PCC poles 9 metre long 1 no |3,500 |00 | each} 3,500 |o0 2. |MS anchor plate 45cmx 45emx 6.0em| 1 do | 70000 | do} 700 Joo | (not galvanised) 3. |MS stay rod 16mm diameter and 242m| 1 do | 700 Joo} do} 700 Joo ong 4. | Stay bow made out of MS rod 13 mm 1 do | 450 |00| do} 450 |oo diameter 5. | Stay insulator 1 do | 150]00| do} 150 oo | Stay wire (7/8 SWG GI wire) it | kg 270/00} kg | 4.590 oo | Stay clamps 2 | mos ) 75/00 Jeach| 150 Joo 8 | 16mm diameter, 76 mm long bolts and 4 do | 45}00] do| 180 |00 nuts 9. | MS thimbles 2 do | 15 ]00] do} 30 00 |Lump-sum 10. | Sundries to complete the job provision 800 |00 [provision Total |11,250 [00 Storage and transportation 5% | 562 |50 Labour charges 20% | 2,250 |00 |Being small work Contingencies 10% | 1,125 |00 15,187 [50 Say 715,200.00

You might also like