This document provides detailed unit price analyses (DUPA) for 5 plumbing items: 1) 4", 3", 2" dia PVC pipes with a unit cost of $10878.32 2) Gate & check valves with a unit cost of $1150 3) Water meters with a unit cost of $2362.50 4) Faucets & hose bibbs with a unit cost of $4798.52 5) Grease traps and interceptors with a unit cost of $14,537.49 The DUPA includes labor costs by role, equipment costs, and total costs per unit.

Uploaded by

Zheby
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
283 views3 pages

Dupa - 20

This document provides detailed unit price analyses (DUPA) for 5 plumbing items: 1) 4", 3", 2" dia PVC pipes with a unit cost of $10878.32 2) Gate & check valves with a unit cost of $1150 3) Water meters with a unit cost of $2362.50 4) Faucets & hose bibbs with a unit cost of $4798.52 5) Grease traps and interceptors with a unit cost of $14,537.49 The DUPA includes labor costs by role, equipment costs, and total costs per unit.

Uploaded by

Zheby
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

DETAILED UNIT PRICE ANALYSIS (DUPA)

Item No./Description : 1002(4)a 20.1. 4", 3", 2" dia PVC


Unit of Measurement : pc Quantity : 42.00
Output per hour : 2 Units : pcs

Designation No. of Person No. of Hours Hourly Rate Amount

A. Labor
a. Construction Foreman 1 18.36 115.25 2116.26
b. Skilled Laborer 2 18.36 83.22 3056.22
c. Unskilled Laborer 4 18.36 64.22 4716.91

Sub-Total for A 9889.38

Name and Capacity No. of Units No. of Hours Hourly Rate Amount

B. Equipment
Minor Tools (10% of Labor Cost) 988.94

Sub-Total for B 988.94


C. Total (A+B) 10878.32

DETAILED UNIT PRICE ANALYSIS (DUPA)


Item No./Description : 1202(3)d 20.2. Gate & Check Valve
Unit of Measurement : set Quantity : 12.00
Output per hour : 1 Units : sets

Designation No. of Person No. of Hours Hourly Rate Amount

A. Labor
a. Construction Foreman 1 4.38 115.25 504.35
b. Skilled 1 4.38 83.32 364.62
c. Unskilled Laborer 1 4.38 64.22 281.03

Sub-Total for A 1150.00

Name and Capacity No. of Units No. of Hours Hourly Rate Amount

B. Equipment

Sub-Total for B
C. Total (A+B) 1150.00

DETAILED UNIT PRICE ANALYSIS (DUPA)


Item No./Description : 1202(3)c 20.3. Water Meter
Unit of Measurement : pc Quantity : 7.00
Output per hour : 1 Units : pcs

Designation No. of Person No. of Hours Hourly Rate Amount

A. Labor
a. Construction Foreman 1 8.99 115.25 1036.11
b. Skilled 1 8.99 83.32 749.05
c. Unskilled Laborer 1 8.99 64.22 577.34

Sub-Total for A 2362.50

Name and Capacity No. of Units No. of Hours Hourly Rate Amount

B. Equipment
Sub-Total for B
C. Total (A+B) 2362.50

DETAILED UNIT PRICE ANALYSIS (DUPA)


Item No./Description : 1002(5) 20.4. Faucet & Hose Bibb
Unit of Measurement : pc Quantity : 3.00
Output per hour : 1 Units : pcs

Designation No. of Person No. of Hours Hourly Rate Amount

A. Labor
a. Construction Foreman 1 15.49 115.25 1784.78
b. Skilled Laborer 2 15.49 83.22 2577.51

Sub-Total for A 4362.29

Name and Capacity No. of Units No. of Hours Hourly Rate Amount

B. Equipment
Minor Tools (10% of Labor Cost) 436.23

Sub-Total for B 436.23


C. Total (A+B) 4798.52

DETAILED UNIT PRICE ANALYSIS (DUPA)


Item No./Description : 20.5. Grease Trap and Interceptor
Unit of Measurement : pc Quantity : 7.00
Output per hour : 1 Units : set

Designation No. of Person No. of Hours Hourly Rate Amount

A. Labor
a. Construction Foreman 1 8 115.25 922.449475
b. Skilled Laborer 2 12 83.22 1997.28
c. Unskilled Laborer 2 12 64.22 1541.28
-
-
-
Sub-Total for A 4461.009475

Name and Capacity No. of Units No. of Hours Hourly Rate Amount

B. Equipment
a. Tremie Pipe Set 2 15.05 320 9630.38656
Minor Tools (10% of Labor Cost) 446.1009475
-
-
-
-
Sub-Total for B 10076.48751
C. Total (A+B) 14537.50

DETAILED UNIT PRICE ANALYSIS (DUPA)


20.6. Water Tank & Centrifugal
Item No./Description :
Pump
Unit of Measurement : set Quantity : 2.00
Output per hour : 1 Units : set

No. of Person No. of Hours Hourly Rate Amount


Designation
No. of Person No. of Hours Hourly Rate Amount
Designation
A. Labor
a. Construction Foreman 1 8 115.25 922.726075
b. Skilled 4 16 83.32 5332.48
c. Unskilled Laborer 4 10 64.22 2568.8
-
-
-
Sub-Total for A 8824.006075

No. of Units No. of Hours Hourly Rate Amount


Name and Capacity
B. Equipment
a. Water Truck/ Pump 1 2.7 2450 6583.395
b. Water Pump, 100 mm suction 2 8 266 4256
Minor Tools (10% of Labor Cost) 882.4006075
-
-
-
Sub-Total for B 11721.79561
C. Total (A+B) 20545.80

DETAILED UNIT PRICE ANALYSIS (DUPA)


Item No./Description : 20.7. Storage Drainage
Unit of Measurement : set Quantity : 2.00
Output per hour : 1 Units : set

No. of Person No. of Hours Hourly Rate Amount


Designation
A. Labor
a. Construction Foreman 1 8.57 115.25 988.07
b. Skilled 2 8.57 83.32 1428.65
c. Unskilled Laborer 2 8.57 64.22 1101.15

Sub-Total for A 3517.86

No. of Units No. of Hours Hourly Rate Amount


Name and Capacity
B. Equipment
Minor Tools (10% of Labor Cost) 351.79

Sub-Total for B 351.79


C. Total (A+B) 3869.65