0% found this document useful (0 votes)
119 views1 page

Electrical Installation Scoring Criteria

This document contains a scoring rubric used to evaluate participants in an electrical installation and maintenance competition. It includes criteria for work speed, accuracy of schematic diagrams, accuracy of installation, use of tools, safety procedures, and ability to explain the process. Participants are scored out of 100 total points across these various categories by three judges.

Uploaded by

Jofit Dayoc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
119 views1 page

Electrical Installation Scoring Criteria

This document contains a scoring rubric used to evaluate participants in an electrical installation and maintenance competition. It includes criteria for work speed, accuracy of schematic diagrams, accuracy of installation, use of tools, safety procedures, and ability to explain the process. Participants are scored out of 100 total points across these various categories by three judges.

Uploaded by

Jofit Dayoc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

9

8
7
6
5
4
3
2
1
Partipants Board No.

16
15
14
13
12
11
10
Score
Finished 21 -30 mins before alloted time

10
Finished 11- 20 min before alloted time

7
Finished 5 -10 min before alloted time

5
Finished 1 -30 min after alloted time

3
Work speed ( 10% )

did not finished the task

0
Bulb A function

3
Bulb B function

JUDGE 1
Bulb C function

3
Bulb D function

3
ACU outlet function

3
CO function
3

___________________________________
Line to ground testing of ACU
3
schematic diagram ( 25% )

Line to Line testing of CO


2
Accuracy of interpretation of

Ground to Ground tesing of ACU


2

Top edge to meter based


2

Meter base to Panel board


2

Panel board to Squre box ( vertical )


2

Square box to ACU


2

Square box to Utility Box( L )


2

Square box to CO
2

CO to Utility Box( R )
2

Left Edge to Meter base


2

Meter base to Bulb A


2
30-May-23

Bulb A to Bulb B
2

Bulb B to Bulb C
2

JUDGE 2 Bulb C to Bulb D


Scoring Criteria Checksheet

Top edge to UB ( L )
1
Electrical Installation and Maintenance

Accuracy of installation ( 30 % )

Top Edge to bulb ABCD


1

Bulb ABCD to UB ( R )
1

___________________________________

UB ( R ) to CO
1
Division Festival of Talent - TECHNOLYMPICS 2022 -2023

Horizontality of boxes MB and PB


1

Verticality of boxes MB and PB


1

Heat Gun manipualation


5

Plier manipulation
3

Metal bender Utilization


5
( 15 % )
Use of tools

Screw driver manipulation


2

5's Application
5

Hard Hat
5
Safety ( 15 % )

Working Gloves
5

All questions answered correctly


5

JUDGE 3

Four questions answered correctly


4

Three questions answered correctly


3

Two questions answered correctly


2
Process ( 5 % )

__________________________________

One question answered correctly


1
Ability to Explain

No correct answer
0

Total Score
100