0% found this document useful (0 votes)
126 views8 pages

General Instruction Manual: Accounting Policy, Methods & Systems Department

This document provides an index of accounting instructions that have been cancelled by Saudi Aramco. It lists 22 instructions by number, title, cancellation date, and whether they are replaced by another instruction. The index shows these instructions were cancelled between 1966 and 2000, with most being cancelled in the 1980s. It does not provide any details about the contents or purpose of the cancelled instructions.

Uploaded by

Aldrien Cabinte
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
126 views8 pages

General Instruction Manual: Accounting Policy, Methods & Systems Department

This document provides an index of accounting instructions that have been cancelled by Saudi Aramco. It lists 22 instructions by number, title, cancellation date, and whether they are replaced by another instruction. The index shows these instructions were cancelled between 1966 and 2000, with most being cancelled in the 1980s. It does not provide any details about the contents or purpose of the cancelled instructions.

Uploaded by

Aldrien Cabinte
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

SAUDI ARABIAN OIL COMPANY (Saudi Aramco) GENERAL INSTUCTION NO.

GENERAL INSTRUCTION MANUAL 200.002


ISSUE DATE REPLACES
ISSUING ORG. ACCOUNTING POLICY, METHODS & SYSTEMS DEPARTMENT 01-01-2000 12-31-97
APPROVAL PAGE NO.
SUBJECT INDEX OF CANCELLED INSTRUCTIONS HAH 1 OF 8

CONTENT: This instruction lists the number and related titles of instructions that have been cancelled.

Cancellation
Instruction No Title Date Refer to

22.002 Concrete Facilities Accounting 11/24/84 Not Replaced

22.002-1 Concrete Facilities Accounting Equipment Cost


Allocation Schedule 11/24/84 Not Replaced

22.002-2 Concrete Facilities Accounting Depreciation


Guidelines 11/24/84 Not Replaced

22.002-3 Concrete Facilities Accounting Ready Mixed


Concrete Facilities Program Type Code/Phase
Summary 11/24/84 Not Replaced

22.002-4 Concrete Facilities Accounting Inventory


Reconciliation Schedule 11/24/84 Not Replaced

22.002-5 Concrete Facilities Accounting Monthly Account


Summary Report 11/24/84 Not Replaced

22.002-6 Concrete Facilities Accounting Payroll Register 11/24/84 Not Replaced

22.002-7 Concrete Facilities Accounting Contract 6509


Labor Distribution 11/24/84 Not Replaced

22.002-8 Concrete Facilities Accounting Contract 6509 Other


Reimbursable Charges 11/24/84 Not Replaced

22.002-9 Concrete Facilities Accounting Invoice of Other


Charges & Fees 11/24/84 Not Replaced

200.000 ** Manuals Maintained by APM&SD 12-28-99 Not Replaced

200.003 ** Accounting Instruction Manual Index 12-31-99 Not Replaced

200.003-1 ** Index of AIM & GIM Glossary Instruction Reference 12-31-99 Not Replaced

200.040 Accounting Vouchers 07/13/69 Fincl Acctg


Dept

* CHANGE ** ADDITION NEW INSTRUCTION COMPLETE REVISION


SAUDI ARABIAN OIL COMPANY (Saudi Aramco) GENERAL INSTUCTION NO.

GENERAL INSTRUCTION MANUAL 200.002


ISSUE DATE REPLACES
ISSUING ORG. ACCOUNTING POLICY, METHODS & SYSTEMS DEPARTMENT 01-01-2000 12-31-97
APPROVAL PAGE NO.
SUBJECT INDEX OF CANCELLED INSTRUCTIONS HAH 2 OF 8

Cancellation
Instruction No Title Date Refer to

200.060 Currency Exchange Adjustments 03/25/76 AIM 701

202.206 Review Distribution & Acct. for Loan and Guaranteed


Loan Agreements 12/01/69 Not Replaced

202.301-1 Master Gas System Plant & Equipment Accounts in


the General Ledger 10/15/94 GI 202-301

202.302 Plant & Equipment Location Codes 02/15/69 Not Replaced

202.310 Form Aramco 4625 Completion Certificate 05/31/80 GI2.710/AI 201

202.311 Form 903 - Job Order Closing Fixed Assets &


02/08/69 WIP Acctg
Dept
202.330-40 Plant & Equipment Depreciation Rates Life
Expectancy of Specific Sub 03/31/85 Not Replaced

202.350 Incomplete Construction 06/13/82

202.350-01 Incomplete Construction - Supplement 06/13/82 AIM 203

202.409 Deferred Expense for Transporting Personal Effects to


Saudi Arabia 02/22/71 Not Replaced

202.570 Employees Earned Vacation Expense 03/25/76 AIM 702

203.008 Geophysical Service International 11/01/69 Fincl Acctg


Dept
203.009 Charles Martin Inspector of Petroleum Inc.& E.W.
Saybolt S.A. 09/19/79 AIM 706

203.009-1 Charles Martin Inspector of Petroleum Inc.& E.W.


Saybolt S.A. -Supplement 09/19/79 AIM 706

203.012 Chicago Bridge Limited - Tank Erection and


Other Construction Work 08/31/84 Not Replaced

203.012-1 Chicago Bridge Limited - Miscellaneous Work


Agreement No. 08/31/84 Not Replaced

* CHANGE ** ADDITION NEW INSTRUCTION COMPLETE REVISION


SAUDI ARABIAN OIL COMPANY (Saudi Aramco) GENERAL INSTUCTION NO.

GENERAL INSTRUCTION MANUAL 200.002


ISSUE DATE REPLACES
ISSUING ORG. ACCOUNTING POLICY, METHODS & SYSTEMS DEPARTMENT 01-01-2000 12-31-97
APPROVAL PAGE NO.
SUBJECT INDEX OF CANCELLED INSTRUCTIONS HAH 3 OF 8

Cancellation
Instruction No Title Date Refer to

203.017 X-Ray International 12/07/66 Not Replaced

203.018 Booren Exploratie Maatschappij (Drilexco) N.V. 01/08/69 Not Replaced

203.020 Service Organization SAG Tax Records 03/01/70 Fincl Acctg


Dept

203.021 Aero Service Corporation 01/08/69 Not Replaced

204.120 Aramco Overseas Co. Account 03/25/97 AIM 703

204.126 AOC/Aramco Personal Effects Claims Handling 03/25/76 AIM704

207.001-00 Accounting Reports-Index of Cancelled Supplements AIM 704


03/01/61
207.001-362 Accounting Reports-Materials Inventory & Activity
Reports 04/07/63 AIM 306

207.001-363 Accounting Reports - Materials & Supplies Stock


Adjustment 04/07/65 AIM 307

207.001-617 Accounting Reports - Recapitulation of Lost Time 02/11/67 Not Replaced

207.001-666 Accounting Reports - AR-666 07/20/62 Not Replaced

207.001-667 Accounting Reports - AR-667 07/20/67 Not Replaced

207.010 Special Projects Request 03/25/76 AIM 705

207.040 Misc. Transfer of Food, Bakery Products, Fresh


Produce, Magazines, Newspapers, Materials,
Merchandise and Supplies 06-30-97 Not Replaced

207.040-1 Use and Preparation of Forms Aramco 1780, 1780-


1,1895, 1895F& 2465 - Transfer of Food, Bakery
Products, Fresh Produce, Magazines, Newspapers,
Materials, Merchandise and Supplies 06-30-97 Not Replaced

207.040-2 Document/Control Numbers Transfer of Materials -


Merchandise - Supplies 06-30-97 Not Replaced

* CHANGE ** ADDITION NEW INSTRUCTION COMPLETE REVISION


SAUDI ARABIAN OIL COMPANY (Saudi Aramco) GENERAL INSTUCTION NO.

GENERAL INSTRUCTION MANUAL 200.002


ISSUE DATE REPLACES
ISSUING ORG. ACCOUNTING POLICY, METHODS & SYSTEMS DEPARTMENT 01-01-2000 12-31-97
APPROVAL PAGE NO.
SUBJECT INDEX OF CANCELLED INSTRUCTIONS HAH 4 OF 8

Cancellation
Instruction No Title Date Refer to

207.050-1 Form Aramco 630 "Plant & Equipment Change" 03/31/85 Not Replaced

207.050-2 Approval Authorities - Plant & Equipment Change 03/31/85 Not Replaced

207.051 Materials & Supplies Gains & Losses Materials


04/05/70 Manual
AIM 307

207.052 Form Aramco 4258-B Construction Job Order


Assignment Notice 06/11/79 Not Replaced

207.061 Accounting for Fixed Asset Mobile Equipment Units 02/04/69 AIM 306

208.006 Sale of Company Assets 03/25/76 AIM 207

211.065 Control of Food Issue Coupons 05/17/71 Not Replaced

211.080-1 Government Blank Driving License 10/26/94 GI 211.080

216.607 Petroleum Products Code List 04/24/79 AIM 521

216.608-2 Well Accounting & Development Costs - Oil Field


Account Codes 02/10/92 GIM 216.608

216.608-4 Well Accounting & Development Costs - Offshore


Well Platform Construction Item List 02/10/92 GIM 216.608

216.610 Direct Charge Appropriation Material Accounting 08/13/79 AIM 314

216.611-1 Vehicle Usage Reporting - Automatic Usage


Reporting System 03/19/86 GIM 216.611

216.612 Transp & Construction Equip Make & Body Codes 09/09/67 GIM 1130.307

216.614 Material Delivery Service 04/05/70 GIM 330.065


GIM 330.074

216.616-1 Shaybah Road Equipment Usage/Activity Reporting 10/30/84 Not Replaced

216.618 Equipment Bare Rental Rates - Outside Organizations 06/30/79 Replaced by

* CHANGE ** ADDITION NEW INSTRUCTION COMPLETE REVISION


SAUDI ARABIAN OIL COMPANY (Saudi Aramco) GENERAL INSTUCTION NO.

GENERAL INSTRUCTION MANUAL 200.002


ISSUE DATE REPLACES
ISSUING ORG. ACCOUNTING POLICY, METHODS & SYSTEMS DEPARTMENT 01-01-2000 12-31-97
APPROVAL PAGE NO.
SUBJECT INDEX OF CANCELLED INSTRUCTIONS HAH 5 OF 8

Cancellation
Instruction No Title Date Refer to

AIM 403 but


Cancelled

216.621 Vehicle Repair Costing 06/04/79 Replaced by


AIM 404 but
cancelled

216.622 Exploration Department Transportation Costs 04/24/79 Not Replaced

216.627 Transportation Repair & Service Facilities 04/11/79 AIM 406

216.630 Crude Program Surplus Direct Charge Material 11/19/83 GI History File

216.705 Accounting for Stocks for Miscellaneous Inventories 05/24/72 AIM 301

216.708 Maintenance Work Orders 07/10/79 AIM 601

216.745 Distribution & Utilities Cost 08/13/79 AIM 801

216.771-1 Crude Oil/Refined Products Sample Costs - Estimated


Cost Components/Invoice Rate 01/04/93 Not Replaced

216.800 Allocation of A&G expenses, DOX 010 & DSP


Depreciation 12/01/79 AIM 802

216.816 Exploration Well Costs 06/07/69 GIM 216.608

216.840 Ras Tanura Marine Terminal Expense 08/12/79 AIM 512

216.840-1 Ras Tanura Marine Terminal Expense-Supp 08/12/79 AIM 512-1

216.908 Company Built Schools-Eastern Province 03/25/76 AIM 101

216.964-1 Engineering Services Rate Calculation 07/10/82 Not Replaced

216.964-2 Table of Statute Miles 07/10/82 Not Replaced

216.966 Financial Analysis Procedures (temporary 01/20/79 Economics


cancellation) Dept

* CHANGE ** ADDITION NEW INSTRUCTION COMPLETE REVISION


SAUDI ARABIAN OIL COMPANY (Saudi Aramco) GENERAL INSTUCTION NO.

GENERAL INSTRUCTION MANUAL 200.002


ISSUE DATE REPLACES
ISSUING ORG. ACCOUNTING POLICY, METHODS & SYSTEMS DEPARTMENT 01-01-2000 12-31-97
APPROVAL PAGE NO.
SUBJECT INDEX OF CANCELLED INSTRUCTIONS HAH 6 OF 8

Cancellation
Instruction No Title Date Refer to

and FB&FAD

218.000 Inventory Valuation Reserve Accounts 01/13/87 GIM 324.000/


AIM 316

218.000-1 Inventory Valuation Reserve Accounts - Decision


Charts 01/13/87 GIM 324.000

221.940 Non-Industrial Sickness Benefits 01/28/69 IR Policy


Manual

221.990-1 Example of Form SA-314 Used For Blood Donor


Payment 11-03-96 GI 221.990

221.990-2 Blood Donor Payment Form SA-7621 11-03-96 GI 212.990

221.995 SAG Work Permit Fees 06/20/71 AIM 901

223.100 Employee Charges/Credits 06/20/71 AIM 902

223.110 Visa & Quarantine Charges 04/20/69 Empl Relations


Processing

223.115 Collection of Fixed Charges 06/20/71 AIM 903

223.120 Employee Assistance for Home Improvements 10/27/87 IR Manual

224.001 Recording Expenditures made to Govt. 07/05/69 MS&PAD

230.031-1 Invoices to Outsiders - Charges 08/06/85 GI 230.031

230.031-2 Delivery of Invoice/Collection of Payment


Responsibility 08/06/85 GI 230.031

230.031-3 Invoices to Outsiders-Signature Formats 08/06/85 GI 230.031

231.002 Employee Business Expense Outside SA 05/14/75 IR Policy


Manual

231.003 Employee Business Expense Inside SA 08/11/76 IR Policy


Manual

* CHANGE ** ADDITION NEW INSTRUCTION COMPLETE REVISION


SAUDI ARABIAN OIL COMPANY (Saudi Aramco) GENERAL INSTUCTION NO.

GENERAL INSTRUCTION MANUAL 200.002


ISSUE DATE REPLACES
ISSUING ORG. ACCOUNTING POLICY, METHODS & SYSTEMS DEPARTMENT 01-01-2000 12-31-97
APPROVAL PAGE NO.
SUBJECT INDEX OF CANCELLED INSTRUCTIONS HAH 7 OF 8

Cancellation
Instruction No Title Date Refer to

231.008 Reimbursement of SAG Fees 07/05/69 Employee


Relations Dept

231.060 Homeownership 11/10/71 AIM 904


232.001 Payment of Invoices 03/25/76 AIM 706

233.001 Payment to Arab Contractors 03/25/76 AIM 707

235.010 Accounting for Customs on Personal Effects 03/25/76 AIM 905

235.011 Customs Clearance on Sale of Assets 03/25/76 AIM 708

235.012 Customs Duty Accruals 03/25/76 AIM 709

235.020 Liquor Import Permits 01/27/54 Not Replaced

235.036 SAG Customs Refunds 03/25/76 AIM 710

239.001 Uncollectable Receivables, Unclaimed Credits 03/25/76 AIM 711

240.001 Materials Accountability 06/21/72 Not Replaced

241.014-2 Departmental Responsibilities in Crude Oil 09-30-95 Not Replaced

241.015 Accounting for locally refined products returnable


containers 05/18/69 GI 322.021-1,
241.014

241.017 Gas Cylinders Control 06/18/78 GIM 335.020,


AIM 303

241.019 Gains & Losses in Petroleum Products 06/03/69 GIM 241.014

241.020 Costing Incoming Materials 04/19/72 AIM 304

243.202 Cargo Losses & Claims 06/06/72 AIM 305

243.362 Material Inventory & Activity Reports 06/19/72 AIM 306

243.363 Materials and Supplies Adjustments 05/28/72 AIM 307

* CHANGE ** ADDITION NEW INSTRUCTION COMPLETE REVISION


SAUDI ARABIAN OIL COMPANY (Saudi Aramco) GENERAL INSTUCTION NO.

GENERAL INSTRUCTION MANUAL 200.002


ISSUE DATE REPLACES
ISSUING ORG. ACCOUNTING POLICY, METHODS & SYSTEMS DEPARTMENT 01-01-2000 12-31-97
APPROVAL PAGE NO.
SUBJECT INDEX OF CANCELLED INSTRUCTIONS HAH 8 OF 8

Cancellation
Instruction No Title Date Refer to

243.601 Aramco Materials System 05/06/72 AIM 308

246.032 Processed Materials 05/23/71 Not Replaced

247.009 Standard Pricing Food & Retail 03/25/76 AIM 309

286.020-1 Labor Cost Charge Rate Instructions 08/06/85 GI 286.020

Approved: _______________________
Abdulla M. Zahia, Manager
Accounting Policy, Methods
& Systems Department

AAN

(W/C M638)

* CHANGE ** ADDITION NEW INSTRUCTION COMPLETE REVISION

You might also like