Aim & Procedure            Model          Finish and Accuracy      Viva Voce       Result          Total
        20                   40                    20                  10             10           100
Instructions: 1. All dimensions are in ‘mm’.
               2. Dimensions of work pieces can be modified by respective colleges.
1     Make a pipe fitting connections as per the drawing given below for a 50mm dia                (100)
      PVC pipe.
2     Prepare the water line connection to the tap as shown in the Figure from the main water      (100)
      line using GI pipes, GI reducers, valves and clamps.
3.    Prepare the GI / PVC Pipe joint by using the given pipes and fittings as per the             (100)
                                               Page 1 of 6
     diagram given below.
4.   Prepare the water line connection to wash basin as shown in the sketch using plumbing   (100)
     components like pipes, elbows, reducers, gate valves.
5    Prepare the water line                                                 connection to    (100)
     the tap as shown in the                                                figure from
     the main water line using                                              PVC pipes,
     PVC reducers, valves and                                               clamps.
                                             Page 2 of 6
6   Prepare threads on the GI pipe using threading die, pipe vice and prepare the plumbing   (100)
    connection as shown in the Figure
7   Prepare a layout and pipe line connection using GI pipe to geyser (water heater) from    (100)
    the water source line.
8   Prepare a model of metallic pipe layout for water supply in a house from the             (100)
    given service connection.
9   Make the pipe fitting connections as per the drawing given below for a 50mm              (100)
    diameter GI pipe.
                                             Page 3 of 6
10   Make a Dove Tail joint from the given wood pieces as shown in the Figure          (100)
                                                                Dovetail Joint
11   Make a Middle Lap halving                                  joint from the given   (100)
     wood pieces as given in the                                Figure
            Middle Lap Joint
12   Make a ‘T’ lap halving                                     joint from the given   (100)
     wood pieces as given in                                    the Figure
            T Lap Joint
                                            Page 4 of 6
13   Make a ‘ Mortise and Tenon’ joint from the given wood pieces as given in the Figure   (100)
       Mortise and Tenon                                                          Joint
14   Make a T lap joint from the given reaper of size 70X50X300mm                          (100)
15   Make a dovetail joint from the given wooden work piece as per the drawing given       (100)
     below.
16   Make a T-lap joint from the given wood pieces as shown in drawing.                    (100)
                                             Page 5 of 6
17   Make a Mortise and Tenon joint from the given reaper of size 70X50X300mm   (100)
18   To Study joints in door panels and wooden furniture                        (100)
19   To Study common industrial trusses using models                            (100)