Laundry Industries Ltd.
Khezurbagan, Ashulia, Dhaka-1341
      EMERGENCY LIGHT INSPECTION TESTING & MAINTENANCE CHECKLIST
                          Month of-: July-2023
FACTORY INFORMATION
Factory Name: Laundry Industries Ltd.
Address: Khezurbagan, Ashulia,savar, Dhaka-1341
Representative Name: Md. Jahidul Haque.
Designation: Deputy.Manager (Maintenance)
Phone: +8801755-530566
E-mail: Jahid.lil@envoy-group.com
INSTALLATION, SERVICE AND TESTING CONTRACT INFORMATION ( IF APPLICABLE)
Contract Name: Laundry Industries Ltd.
Address: Khezurbagan, Ashulia,savar, Dhaka-1341
Inspector or Tester Name: Md. Jahidul Haque
Qualification of Inspector or Tester: Electrical and Electronic Engineering
Phone: , +08801755-530566
E-mail: Jahid.lil@envoy-group.com
A Contract for Inspection & testing in accordance with NFPA is in effect as of: 04/05/2020
The Contract Expires: Next month Frequincy of Test: Monthly
WITNESS BY
Company Name: Laundry Industries Ltd.
Address: Khezurbagan, Ashulia,savar, Dhaka-1341
Representative Name: Md. Rasel Hossain (Abid)
Designation: Officer(Fire & Safety)
Phone:, +8801728-896475
E-mail: Compliance.lil@envoy-group.com
Gmail:mdrasel896475@gmail.com
                                     Laundry Industries Ltd.
                                              Khezurbagan, Ashulia, Dhaka-1341
     EMERGENCY LIGHT INSPECTION TESTING & MAINTENANCE CHECKLIST
                                                                                      Comments
  SL No                         Description
                                                                       Yes       No                   N/A
          A functional test has been conducted on every
    1     required emergency lighting system at 30 day
          intervals for a minimum of 30 minute brackup time.
          An annual test has been conducted on every required
    2     battery powered emergency & exit lighting system
          for not less then 30 minutes. Equipment shall be fully
          operational for the duration of the test.
          Exit signs shall be visually inspected for operation of
    3     the illumination sources of intervals not to exceed 90
          days.
    4     AC power supply to each emergency & exit light has
          been disconnected.
    5     Battery backup, output voltage and line voltage to
          remote fixtures has been checked.
    6     Each emergency & exit light and lens has been
          cleaned if required.
    7     Beam has been adjusted for proper alignment if
          required.
    8     Testing label on emergency & exit light and testing
          log has been placed on the log book.
          A minimum illumination level (By Emergency Light) of
    9     10 lux for all corridors, exit doors & stairways has
          been checked properly. Aisles shall be provided with
          a minimum illumination level of 2.5 lux.
 Md. Rasel Hossain                                  Md. Jahidul Hoque                       Md. Imran Hossin
Officer (Fire & Safety)                        Dy. Manager(Maintenance)               Asst: Manager (HR & Compliance)
                                                   LAUNDRY INDUSTRIES LIMITED
                                                  KHEZURBAGAN, ASHULIA,DHAKA-1341.                                            Requirement of Lux
              Emergency Light Inspection Testing & Maintenance Check List                                                   Aisle mark    2.5 Lux
                                                                                                                            Exit Stair    10 Lux
Date of :16-July-2023                                                                                                       Corriedoor    10 Lux
                                                          Rightly
                                                       positioned
                                                                                                   Lux           Lux            Lux
 SL.      Area                              Hanging is to provede      Physical   Backup by
                       Location SL. No.                                                       measurement    measurement   Illumination    Remarks
 NO     Convered                             Proper    light in the   Condition      UPS
                                                                                               Satart Time    End Time         Status
                                                         required
                                                           area
 01                      Exit       EL-01
 02                     Aisles      EL-02
 03                     Aisles      EL-03
 04                     Aisles      EL-04
 05                     Aisles      EL-05
 06                     Aisles      EL-06
 07       Ground        Aisles      EL-07
 08    Floor            Aisles      EL-08
              Wet
 09     Process-01,     Aisles      EL-09
 10    Boiler Room      Aisles      EL-10
          & Sub-
 11      Chemical       Aisles      EL-11
 12       Room.         Aisles      EL-12
 13                     Aisles      EL-13
 14                     Aisles      EL-14
 15                     Aisles      EL-15
 16                      Exit       EL-16
 17                      Exit       EL-17
 18                   Boiler Room EL-18
 20                      Exit       EL-20
 21                     Aisles      EL-21
 22                     Aisles      EL-22
 23                     Aisles      EL-23
 24                     Aisles      EL-24
 25                     Aisles      EL-25
 26                     Aisles      EL-26
 27                     Aisles      EL-27
 28                     Aisles      EL-28
 29                     Aisles      EL-29
 30                     Aisles      EL-30
 31                     Aisles      EL-31
 32                     Aisles      EL-32
          Ground
 33    Floor            Aisles      EL-33
 34           Wet       Aisles      EL-34
         Process-
 35       02,03 &       Aisles      EL-35
 36       Auxilart       Exit       EL-36
           Shade
                      Maintenan
 37                    ce Office
                                    EL-37
                      Compressu
 38                    re Room
                                    EL-38
                          ETP
 39                   Office ,1st   EL-39
                         Floor
                         Store
 40                   Office ,2nd   EL-40
                         Floor
                        Central
 41                    Sub Che.     EL-41
                         Store
                      Generator
 42                     Room
                                    EL-42
                      Generator
 43                     Room
                                    EL-43
 44                   Aisles   EL-44
 45                    Exit    EL-45
 46                   Aisles   EL-46
 47                   Aisles   EL-47
 48                   Aisles   EL-48
        6 Storied
 49   Building        Aisles   EL-49
 50                   Aisles   EL-50
         Ground
 51   Floor           Aisles   EL-51
 52           Wet     Aisles   EL-52
       Process-03
 53                   Aisles   EL-53
 54                   Aisles   EL-54
 55                   Aisles   EL-55
 56                   Aisles   EL-56
 57                   Aisles   EL-57
 58                    Exit    EL-58
 59                   Aisles   EL-59
 60                   Aisles   EL-60
 61                   Aisles   EL-61
 62                   Aisles   EL-62
 63    Six Storied    Aisles   EL-63
 64   Building (1st   Aisles   EL-64
 65       Floor)      Aisles   EL-65
 66                   Aisles   EL-66
 67                   Aisles   EL-67
 68                   Aisles   EL-68
 69                   Aisles   EL-69
 70                   Aisles   EL-70
 71                   Aisles   EL-71
 72                   Aisles   EL-72
 73                   Aisles   EL-73
 74                   Aisles   EL-74
 75                   Aisles   EL-75
 76                   Aisles   EL-76
 77                   Aisles   EL-77
 78                   Aisles   EL-78
 79                   Aisles   EL-79
 80                   Aisles   EL-80
 81                   Aisles   EL-81
 82                   Aisles   EL-82
 83                   Aisles   EL-83
        6 Storied
 84   Building        Aisles   EL-84
 85            2nd    Aisles   EL-85
      Floor
 86                   Aisles   EL-86
 87       (Dry        Aisles   EL-87
        Process )
 88                   Aisles   EL-88
 89                   Aisles   EL-89
 90                   Aisles   EL-90
 91                   Aisles   EL-91
 92                   Aisles   EL-92
 93                   Aisles   EL-93
 94                   Aisles   EL-94
 95                   Aisles   EL-95
 96                   Aisles   EL-96
 97                   Aisles   EL-97
 98                   Aisles   EL-98
 99                   Aisles   EL-99
100                   Aisles   EL-100
101                     Aisles   EL-101
102                     Aisles   EL-102
103                     Aisles   EL-103
104                     Aisles   EL-104
105                     Aisles   EL-105
106                     Aisles   EL-106
107                     Aisles   EL-107
108                     Aisles   EL-108
109                     Aisles   EL-109
110                     Aisles   EL-110
111                     Aisles   EL-111
112     6 Storied       Aisles   EL-112
      Building
113            3rd      Aisles   EL-113
114   Floor             Aisles   EL-114
115                     Aisles   EL-115
          (Dry
116     Process )       Aisles   EL-116
117                     Aisles   EL-117
118                     Aisles   EL-118
119                     Aisles   EL-119
120                     Aisles   EL-120
121                     Aisles   EL-121
122                     Aisles   EL-122
123                     Aisles   EL-123
124                     Aisles   EL-124
125                     Aisles   EL-125
126                     Aisles   EL-126
127                     Aisles   EL-127
128                     Aisles   EL-128
129                     Aisles   EL-129
130                     Aisles   EL-130
131                     Aisles   EL-131
132                     Aisles   EL-132
133                     Aisles   EL-133
134                     Aisles   EL-134
135                     Aisles   EL-135
136                     Aisles   EL-136
137                     Aisles   EL-137
138                     Aisles   EL-138
139                     Aisles   EL-139
140                     Aisles   EL-140
141                     Aisles   EL-141
142                     Aisles   EL-142
143                     Aisles   EL-143
144                     Aisles   EL-144
                    6
145      Storied        Aisles   EL-145
146   Building          Aisles   EL-146
                4th
147                     Aisles   EL-147
        Floor .
148                     Aisles   EL-148
149                     Aisles   EL-149
150                     Aisles   EL-150
151                     Aisles   EL-151
152                     Aisles   EL-152
153                     Aisles   EL-153
154                     Aisles   EL-154
155                     Aisles   EL-155
156                     Aisles   EL-156
157    Six Storied      Aisles   EL-157
158   Building (5th     Aisles   EL-158
159       Floor)        Aisles   EL-159
160                     Aisles   EL-160
161                     Aisles   EL-161
                          Bonded
 162                       Wear       EL-162
                           House
         Office
 163 Building             Medical     EL-163
 164                      Room        EL-164
       ( Ground
 165     Floor)          Baby Care    EL-165
                            Atten
 166                     Management   EL-166
                           Room
 167                            EL-167
 168                            EL-168
 169     Office     Lab, R & D EL-169
     Building        Office &
 170                 Bonded     EL-170
              ( 1st   Wear
 171     Floor)       House     EL-171
 172                            EL-172
 173                            EL-173
 174                            EL-174
 175                            EL-175
 176     Office     HR Office EL-176
     Building           &
 177                            EL-177
             ( 2nd Conferenc
 178     Floor)      e Room     EL-178
 179                            EL-179
 180                            EL-180
 181                            EL-181
 182                            EL-182
 183     Office                 EL-183
     Building       Canteen & EL-184
 184
              ( 3rd Dining Hall
 185     Floor)                 EL-185
 186                            EL-186
 187                            EL-187
   Abdul.Kuddus                                  Md Rasel Hossain             Md. Jahidul Haque              Md. Imran Hossain
Jr.Supervisor Electric                         Officer ( Fire & Safety)   Dy.Manager(Maintenance)   Asst: Manager (HR & Compliance)