0% found this document useful (0 votes)
122 views6 pages

14-Emergency Light Checklis - 2022

Uploaded by

krishna.greenhr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
122 views6 pages

14-Emergency Light Checklis - 2022

Uploaded by

krishna.greenhr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Laundry Industries Ltd.

Khezurbagan, Ashulia, Dhaka-1341


EMERGENCY LIGHT INSPECTION TESTING & MAINTENANCE CHECKLIST
Month of-: July-2023
FACTORY INFORMATION
Factory Name: Laundry Industries Ltd.

Address: Khezurbagan, Ashulia,savar, Dhaka-1341

Representative Name: Md. Jahidul Haque.

Designation: Deputy.Manager (Maintenance)

Phone: +8801755-530566

E-mail: Jahid.lil@envoy-group.com

INSTALLATION, SERVICE AND TESTING CONTRACT INFORMATION ( IF APPLICABLE)


Contract Name: Laundry Industries Ltd.

Address: Khezurbagan, Ashulia,savar, Dhaka-1341

Inspector or Tester Name: Md. Jahidul Haque

Qualification of Inspector or Tester: Electrical and Electronic Engineering

Phone: , +08801755-530566

E-mail: Jahid.lil@envoy-group.com

A Contract for Inspection & testing in accordance with NFPA is in effect as of: 04/05/2020
The Contract Expires: Next month Frequincy of Test: Monthly

WITNESS BY
Company Name: Laundry Industries Ltd.

Address: Khezurbagan, Ashulia,savar, Dhaka-1341

Representative Name: Md. Rasel Hossain (Abid)

Designation: Officer(Fire & Safety)

Phone:, +8801728-896475

E-mail: Compliance.lil@envoy-group.com

Gmail:mdrasel896475@gmail.com
Laundry Industries Ltd.
Khezurbagan, Ashulia, Dhaka-1341

EMERGENCY LIGHT INSPECTION TESTING & MAINTENANCE CHECKLIST


Comments
SL No Description
Yes No N/A

A functional test has been conducted on every


1 required emergency lighting system at 30 day
intervals for a minimum of 30 minute brackup time.

An annual test has been conducted on every required


2 battery powered emergency & exit lighting system
for not less then 30 minutes. Equipment shall be fully
operational for the duration of the test.

Exit signs shall be visually inspected for operation of


3 the illumination sources of intervals not to exceed 90
days.

4 AC power supply to each emergency & exit light has


been disconnected.

5 Battery backup, output voltage and line voltage to


remote fixtures has been checked.

6 Each emergency & exit light and lens has been


cleaned if required.

7 Beam has been adjusted for proper alignment if


required.

8 Testing label on emergency & exit light and testing


log has been placed on the log book.

A minimum illumination level (By Emergency Light) of


9 10 lux for all corridors, exit doors & stairways has
been checked properly. Aisles shall be provided with
a minimum illumination level of 2.5 lux.

Md. Rasel Hossain Md. Jahidul Hoque Md. Imran Hossin


Officer (Fire & Safety) Dy. Manager(Maintenance) Asst: Manager (HR & Compliance)
LAUNDRY INDUSTRIES LIMITED
KHEZURBAGAN, ASHULIA,DHAKA-1341. Requirement of Lux
Emergency Light Inspection Testing & Maintenance Check List Aisle mark 2.5 Lux
Exit Stair 10 Lux
Date of :16-July-2023 Corriedoor 10 Lux
Rightly
positioned
Lux Lux Lux
SL. Area Hanging is to provede Physical Backup by
Location SL. No. measurement measurement Illumination Remarks
NO Convered Proper light in the Condition UPS
Satart Time End Time Status
required
area
01 Exit EL-01
02 Aisles EL-02
03 Aisles EL-03
04 Aisles EL-04
05 Aisles EL-05
06 Aisles EL-06
07 Ground Aisles EL-07
08 Floor Aisles EL-08
Wet
09 Process-01, Aisles EL-09
10 Boiler Room Aisles EL-10
& Sub-
11 Chemical Aisles EL-11
12 Room. Aisles EL-12
13 Aisles EL-13
14 Aisles EL-14
15 Aisles EL-15
16 Exit EL-16
17 Exit EL-17
18 Boiler Room EL-18
20 Exit EL-20
21 Aisles EL-21
22 Aisles EL-22
23 Aisles EL-23
24 Aisles EL-24
25 Aisles EL-25
26 Aisles EL-26
27 Aisles EL-27
28 Aisles EL-28
29 Aisles EL-29
30 Aisles EL-30
31 Aisles EL-31
32 Aisles EL-32
Ground
33 Floor Aisles EL-33
34 Wet Aisles EL-34
Process-
35 02,03 & Aisles EL-35
36 Auxilart Exit EL-36
Shade
Maintenan
37 ce Office
EL-37

Compressu
38 re Room
EL-38
ETP
39 Office ,1st EL-39
Floor
Store
40 Office ,2nd EL-40
Floor
Central
41 Sub Che. EL-41
Store
Generator
42 Room
EL-42

Generator
43 Room
EL-43
44 Aisles EL-44
45 Exit EL-45
46 Aisles EL-46
47 Aisles EL-47
48 Aisles EL-48
6 Storied
49 Building Aisles EL-49
50 Aisles EL-50
Ground
51 Floor Aisles EL-51
52 Wet Aisles EL-52
Process-03
53 Aisles EL-53
54 Aisles EL-54
55 Aisles EL-55
56 Aisles EL-56
57 Aisles EL-57
58 Exit EL-58
59 Aisles EL-59
60 Aisles EL-60
61 Aisles EL-61
62 Aisles EL-62
63 Six Storied Aisles EL-63
64 Building (1st Aisles EL-64
65 Floor) Aisles EL-65
66 Aisles EL-66
67 Aisles EL-67
68 Aisles EL-68
69 Aisles EL-69
70 Aisles EL-70
71 Aisles EL-71
72 Aisles EL-72
73 Aisles EL-73
74 Aisles EL-74
75 Aisles EL-75
76 Aisles EL-76
77 Aisles EL-77
78 Aisles EL-78
79 Aisles EL-79
80 Aisles EL-80
81 Aisles EL-81
82 Aisles EL-82
83 Aisles EL-83
6 Storied
84 Building Aisles EL-84
85 2nd Aisles EL-85
Floor
86 Aisles EL-86
87 (Dry Aisles EL-87
Process )
88 Aisles EL-88
89 Aisles EL-89
90 Aisles EL-90
91 Aisles EL-91
92 Aisles EL-92
93 Aisles EL-93
94 Aisles EL-94
95 Aisles EL-95
96 Aisles EL-96
97 Aisles EL-97
98 Aisles EL-98
99 Aisles EL-99
100 Aisles EL-100
101 Aisles EL-101
102 Aisles EL-102
103 Aisles EL-103
104 Aisles EL-104
105 Aisles EL-105
106 Aisles EL-106
107 Aisles EL-107
108 Aisles EL-108
109 Aisles EL-109
110 Aisles EL-110
111 Aisles EL-111
112 6 Storied Aisles EL-112
Building
113 3rd Aisles EL-113
114 Floor Aisles EL-114
115 Aisles EL-115
(Dry
116 Process ) Aisles EL-116
117 Aisles EL-117
118 Aisles EL-118
119 Aisles EL-119
120 Aisles EL-120
121 Aisles EL-121
122 Aisles EL-122
123 Aisles EL-123
124 Aisles EL-124
125 Aisles EL-125
126 Aisles EL-126
127 Aisles EL-127
128 Aisles EL-128
129 Aisles EL-129
130 Aisles EL-130
131 Aisles EL-131
132 Aisles EL-132
133 Aisles EL-133
134 Aisles EL-134
135 Aisles EL-135
136 Aisles EL-136
137 Aisles EL-137
138 Aisles EL-138
139 Aisles EL-139
140 Aisles EL-140
141 Aisles EL-141
142 Aisles EL-142
143 Aisles EL-143
144 Aisles EL-144
6
145 Storied Aisles EL-145
146 Building Aisles EL-146
4th
147 Aisles EL-147
Floor .
148 Aisles EL-148
149 Aisles EL-149
150 Aisles EL-150
151 Aisles EL-151
152 Aisles EL-152
153 Aisles EL-153
154 Aisles EL-154
155 Aisles EL-155
156 Aisles EL-156
157 Six Storied Aisles EL-157
158 Building (5th Aisles EL-158
159 Floor) Aisles EL-159
160 Aisles EL-160
161 Aisles EL-161
Bonded
162 Wear EL-162
House
Office
163 Building Medical EL-163
164 Room EL-164
( Ground
165 Floor) Baby Care EL-165
Atten
166 Management EL-166
Room

167 EL-167
168 EL-168
169 Office Lab, R & D EL-169
Building Office &
170 Bonded EL-170
( 1st Wear
171 Floor) House EL-171
172 EL-172
173 EL-173
174 EL-174
175 EL-175
176 Office HR Office EL-176
Building &
177 EL-177
( 2nd Conferenc
178 Floor) e Room EL-178
179 EL-179
180 EL-180
181 EL-181
182 EL-182
183 Office EL-183
Building Canteen & EL-184
184
( 3rd Dining Hall
185 Floor) EL-185
186 EL-186
187 EL-187

Abdul.Kuddus Md Rasel Hossain Md. Jahidul Haque Md. Imran Hossain


Jr.Supervisor Electric Officer ( Fire & Safety) Dy.Manager(Maintenance) Asst: Manager (HR & Compliance)

You might also like