Mezanine Structure Work Hira
Mezanine Structure Work Hira
Assessment of
Assessment of
Identified
Identified Risks
Applicability
Activity
(YES / NO)
Risks
(Indicative List -
Severity (S)
Severity (S)
S. No. Hazard (Known Risks) Impact / Hazard Effect Control Measures Recommendations
Probability
Probability
Risk (P*S)
Risk (P*S)
Elaborate as per specific to
(P)
(P)
each Project)
1. Material Inspection to be done for any defects, while receiving at site and damaged,
sub-standard or inappropriate should be return at the same time.
14. Inspection and provision of Specific PPEs and other safety gears like full body safety
harness.
1. Welder Shall be certified.
2. Relevant information and instruction about hazards associated with the activity to be
communicated before commencing of activity.
21. Removal of all combustible materials from near Hot work area.
22. Specific PPEs like welding shield, Leather hand gloves leather Apron, Face shield,
hand guard and leg guard etc. provided to workmen.
13. Ensuring that any kind of material shall not be thrown down from height or
left loose at height.
15. Inspection shall be done for any kind of loose material left at height.
17. Provision of PPE's like safety harness, latex hand gloves, etc.
1. Area to be barricaded and restrict unauthorized entry during operation.
5. Use of battery operated Scissor lift to lift the RHS type beam to the
fixing level and use of Fork Lift to erect SHS type Column.
1. Musculo skeletal Disorder
(sprain and strain to upper 6. All document related to the scissor lift and fork lift, like TPI,
limbs, Muscular and back INSURANCE shall be made available.
1. Physical hazards. pain) or may experience slip
disc. 7. Competent Scissor lift and Fork lift operator to be deployed.
2. Poor Working environment(insufficient
illumination). 2. Improper view of sight or 8. Use of rope as a tag line which refrains SHS or RHS to strike adjacent
eye strain. structures.
3. Unsafe working platform.
3. Fall of person from height, 9. Provision of Safe working platform. 1. Imparting of training
4. Fall of mezzanine structure and fall of Lost time Injury(Bone to the persons for
Nut Bolts. Fractures, amputation, 10. Inspection & tagging shall be carried out for power tools. manual handling. and
pinching or Laceration) on MSD's.
5. Uneven Stacking of material. 11. Physical Inspection & tagging shall be carried out for and hydraulic
4. Trip and fall on ground leakage, Limit switches, and controll panel of Scissor lift and Fork lift. 2. Training is provided
6. Struck by the object or Caught in level. to guide the workmen
between 12. Inspection shall be done to avoid/rectify any cable joints or any cable and the supervisors
5. Severe hand or foot injury. damages. about the hazard and
7. Sharp edges. the risk related to work.
6. Electrocution. 13. If found damaged cable it shall be discarded immediately.
8. Use of faulty power tools. 3. Only trained
Erection of MS
19(d) YES 7. Property damage 4 5 20 14. Power supply shall be given through MCCB/RCCB of 30mA to prevent 2 2 4 workmen to be
columns and beam.
9. Poor cable management. electrocution. deployed.
8. Toppling of fork lift.
10. Use of damaged cables. 15. Proper cable management shall be done through overhead routing of 4. Use od moblie phone
9. Toppling of scissor lift. cable. shall be resctricted
11. Excessive loading of scissor lift. while operating
10. Fall of MS structure 16. Battery operated power tools shall be use. equipment.
12. Improper way of erecting column. material.
17. Area shall be free from obstacles. 4. Manual Handling
13. Un even surface. 11. Hit by MS structure process NAS- A-
material. 18. Proper Illumination to be provided. 25.0_04-02-2022 Shall
14. Obstacles in the operation route. be followed.
12. Slip and fall on ground 19. Adequate PPE's provided to workmen like full body safety harness,
15. Improper way of loading MS level or from certain height. hand gloves.
structrue material.
20. Relevant signages to be displayed on working area.
16. Failure of equipment.
21. Proper Assessment of Task, Load, Individual capabilities, Environment
17. Leakage of hydraulics. Equipment and relevant necessities to be carried out before commencing
the activity.
26. Tag line shall fixed on the base of column while erecting which will
refrain hitting to adjacent structure, fellow workers and fork lift.