DATE SHIFT JOB DESCRIPTION
E.A.F-2 GANTRY WHEEL GREASING DONE,
ALL MAST ROLLERS GREASING
DONE,PIVOT PIN GREASING
01.04.2024 G
DONE,TAPPING CAR PM DONE.OIL
FILLING LEFT FILLING IN GEAR BOX SLAB
CASTER SIDE
E.A.F-1 GANTRY WHEEL GREASING WORK
03.04.2024
B DONE
GENERAL TEAM +VIJAY
06.04.2024 MADHUKAR ALINGMENT OF GEARBOX AND MOTOR
HORIZONTAL PRE-HEATER
06.04.2024 AND VERTICAL PRE-HEATER B SHIFT
PM
HORIZONTAL PRE-HEATER
06.04.2024 AND VERTICAL PRE-HEATER B SHIFT
PM
LRF-1 AND LRF-2 PM
10.04.2023 INCLUDES GUIDE ROLLERS GENERAL SHIFT
CLEANING, ARM HOLDER
CLEANING ,WIRE FEEDER
CLEANING ,AND GENERAL
CHECKING
L.R.F-3 WIRE FEEDER AIR
11.04.2024 CLEANING,MAST ROLLER GENERAL SHIFT
CLEANING ,ARM HOLDER
CLEANING,GUIDE ROLLERS
CLEANING
E.A.F-1 ,E.A.F-2,L.R.F-
12.04.2024 1,BOTH HORIZONTAL PRE- GENERAL SHIFT
HEATER TROLLEY
GREASING WORK
E.A.F-1 AND E.A.F-2 ALL
13.04.2024 MAST ROLLERS ,PIVOT GENERAL SHIFT
PIN,GANTRY WHEEL
GREASING DONE
13.04.2024 ALL L.R.F WIRE FEEDER PM GENERAL SHIFT
WORK DONE
REASON IF JOB IS NOT
RESPONSIBLE PERSON COMPLIANCE STATUS COMPLETED
GENERAL TEAM JOB COMPLETED
JOB COMPLETED
MR.RAVINDRA GUPTA
JOB NOT COMPLETED
GENERAL TEAM
JOB NOT ASSIGNED TO ANY JOB NOT COMPLETED
INCHARGE
JOB NOT ASSIGNED TO ANY JOB NOT COMPLETED
INCHARGE
JOB COMPLETED
GENERAL TEAM
JOB COMPLETED
GENERAL TEAM
JOB COMPLETED
GENERAL TEAM(ADITYA) SHUTDOWN ON 13.04.2024
JOB COMPLETED
GENERAL TEAM(ABHISHEK
SAHU) SHUTDOWN ON 13.04.2024
JOB COMPLETED
GENERAL TEAM(KUNAL TIWARI) SHUTDOWN ON 13.04.2024